Medium-Term Rail Scheduling for an Iron Ore Mining Company
Published Online:21 Feb 2013https://doi.org/10.1287/inte.1120.0669
References
- (2004) Pooling problem: Alternate formulations and solution methods. Management Sci. 50(6):761–776.Link, Google Scholar
- (2007) A mixed-integer linear programming model for bulk grain blending and shipping. Internat. J. Production Econom. 107(2):555–571.Crossref, Google Scholar
- C++ Standards Committee (2012) JTC1/SC22/WG21—The C++ Standards Committee. Accessed August 28, 2012, http://www.open-std.org/jtc1/sc22/wg21/.Google Scholar
- (2008) Planning problems in intermodal freight transport: Accomplishments and prospects. Transportation Planning Tech. 31(3):277–302.Crossref, Google Scholar
- (1998) A survey of optimization models for train routing and scheduling. Transportation Sci. 32(4):380–404.Link, Google Scholar
- (2011) A sliding time window heuristic for open pit mine block sequencing. Optim. Lett. 5(3):365–377.Crossref, Google Scholar
- (2001) Iron ore production scheduling to improve product quality. Eur. J. Oper. Res. 129(2):355–361.Crossref, Google Scholar
- (2007) Computer aids for production systems management in iron ore mining. Internat. J. Production Econom. 110(1–2):213–223.Crossref, Google Scholar
- (2005) The feasibility pump. Math. Programming 104(1):91–104.Crossref, Google Scholar
- (2010) Integrated planning of transportation and recycling for multiple plants based on process simulation. Eur. J. Oper. Res. 207(10):958–970.Crossref, Google Scholar
- (2011) Medium-term rail planning at Rio Tinto Iron Ore. Chan F, Marinova D, eds. Proc. 19th Internat. Congress Model. Simulation (Modelling and Simulation Society of Australia and New Zealand, Perth, Australia), 311–317.Google Scholar
- Gurobi Optimization (2012) Gurobi Optimization home page. Accessed January 18, 2012, http://www.gurobi.com/.Google Scholar
- IBM (2012) IBM ILOG CPLEX optimizer. Accessed January 18, 2012, http://www-01.ibm.com/software/integration/optimization/cplex-optimizer/.Google Scholar
- (2011) Incorporating geo-metallurgical information into mine production scheduling. J. Oper. Res. Soc. 6(1):60–68.Crossref, Google Scholar
- (2010) Freight train scheduling with elastic demand. Transportation Res. Part E—Logist. Transportation Rev. 46(6):1057–1070.Crossref, Google Scholar
- (2000) A coal shipping and blending problem for an electric utility company. Omega–Internat. J. Management Sci. 28(4):433–444.Crossref, Google Scholar
- (2004) Opportunities for OR in intermodal freight transport research: A review. Eur. J. Oper. Res. 153(2):400–416.Crossref, Google Scholar
- (2006) A simultaneous optimization approach for off-line blending and scheduling of oil-refinery operations. Comput. Chemical Engrg. 30(4):614–634.Crossref, Google Scholar
- Microsoft Corporation (2012) Visual basic. Accessed August 28, 2012, http://msdn.microsoft.com/en-us/vstudio/hh388568.aspx.Google Scholar
- (2000) Centralized and decentralized train scheduling for intermodal operations. IIE Trans. 32(8):743–754.Crossref, Google Scholar
- (2010) A mixed-integer linear program MILP model for short-range production scheduling of cement quarry operations. Asia-Pacific J. Oper. Res. 27(3):315–333.Crossref, Google Scholar
- (2010) Integrating optimization and simulation—A comparison of two case studies in mine planning. Johansson B, Jain S, Montoya-Torres J, Hugan J, Yücesan E, eds. Proc. 2010 Winter Simulation Conf., IEEE, 1898–1910.Google Scholar
- (1997) Planning of fuel coal imports using a mixed integer programming method. Internat. J. Production Econom. 51(3):243–249.Crossref, Google Scholar
- (2007) Tactical planning of offshore petroleum production. Eur. J. Oper. Res. 176(1):550–564.Crossref, Google Scholar
- (1994) Operations Research Applications and Algorithms, 3rd ed. (Duxbury Press, Belmont, CA), 164–169.Google Scholar
- (1981) Heuristic “optimization”: Why, when, and how to use it. Interfaces 11(5):84–91.Link, Google Scholar

