Medium-Term Rail Scheduling for an Iron Ore Mining Company

Published Online:https://doi.org/10.1287/inte.1120.0669

References

  • Audet C, Brimberg J, Hansen P, Le Digabel S, Mladenović N (2004) Pooling problem: Alternate formulations and solution methods. Management Sci. 50(6):761–776.LinkGoogle Scholar
  • Bilgen B, Ozkarahan I (2007) A mixed-integer linear programming model for bulk grain blending and shipping. Internat. J. Production Econom. 107(2):555–571.CrossrefGoogle Scholar
  • C++ Standards Committee (2012) JTC1/SC22/WG21—The C++ Standards Committee. Accessed August 28, 2012, http://www.open-std.org/jtc1/sc22/wg21/.Google Scholar
  • Caris A, Macharis C, Janssens GK (2008) Planning problems in intermodal freight transport: Accomplishments and prospects. Transportation Planning Tech. 31(3):277–302.CrossrefGoogle Scholar
  • Cordeau JF, Toth P, Vigo D (1998) A survey of optimization models for train routing and scheduling. Transportation Sci. 32(4):380–404.LinkGoogle Scholar
  • Cullenbine C, Wood RK, Newman A (2011) A sliding time window heuristic for open pit mine block sequencing. Optim. Lett. 5(3):365–377.CrossrefGoogle Scholar
  • Everett JE (2001) Iron ore production scheduling to improve product quality. Eur. J. Oper. Res. 129(2):355–361.CrossrefGoogle Scholar
  • Everett JE (2007) Computer aids for production systems management in iron ore mining. Internat. J. Production Econom. 110(1–2):213–223.CrossrefGoogle Scholar
  • Fischetti M, Glover F, Lodi A (2005) The feasibility pump. Math. Programming 104(1):91–104.CrossrefGoogle Scholar
  • Fröling M, Schwaderer F, Bartusch H, Rentz O (2010) Integrated planning of transportation and recycling for multiple plants based on process simulation. Eur. J. Oper. Res. 207(10):958–970.CrossrefGoogle Scholar
  • García-Flores R, Singh G, Ernst A, Welgama P (2011) Medium-term rail planning at Rio Tinto Iron Ore. Chan F, Marinova D, eds. Proc. 19th Internat. Congress Model. Simulation (Modelling and Simulation Society of Australia and New Zealand, Perth, Australia), 311–317.Google Scholar
  • Gurobi Optimization (2012) Gurobi Optimization home page. Accessed January 18, 2012, http://www.gurobi.com/.Google Scholar
  • IBM (2012) IBM ILOG CPLEX optimizer. Accessed January 18, 2012, http://www-01.ibm.com/software/integration/optimization/cplex-optimizer/.Google Scholar
  • Kumral M (2011) Incorporating geo-metallurgical information into mine production scheduling. J. Oper. Res. Soc. 6(1):60–68.CrossrefGoogle Scholar
  • Kuo A, Miller-Hooks E, Mahmassani HS (2010) Freight train scheduling with elastic demand. Transportation Res. Part E—Logist. Transportation Rev. 46(6):1057–1070.CrossrefGoogle Scholar
  • Liu CM, Sherali HD (2000) A coal shipping and blending problem for an electric utility company. Omega–Internat. J. Management Sci. 28(4):433–444.CrossrefGoogle Scholar
  • Macharis C, Bontekoning YM (2004) Opportunities for OR in intermodal freight transport research: A review. Eur. J. Oper. Res. 153(2):400–416.CrossrefGoogle Scholar
  • Méndez CA, Grossmann IE, Harjunkoski I, Kaboré P (2006) A simultaneous optimization approach for off-line blending and scheduling of oil-refinery operations. Comput. Chemical Engrg. 30(4):614–634.CrossrefGoogle Scholar
  • Microsoft Corporation (2012) Visual basic. Accessed August 28, 2012, http://msdn.microsoft.com/en-us/vstudio/hh388568.aspx.Google Scholar
  • Newman A, Yano CA (2000) Centralized and decentralized train scheduling for intermodal operations. IIE Trans. 32(8):743–754.CrossrefGoogle Scholar
  • Rehman SU, Asad MWA (2010) A mixed-integer linear program MILP model for short-range production scheduling of cement quarry operations. Asia-Pacific J. Oper. Res. 27(3):315–333.CrossrefGoogle Scholar
  • Sandeman T, Fricke C, Bodon P, Stanford C (2010) Integrating optimization and simulation—A comparison of two case studies in mine planning. Johansson B, Jain S, Montoya-Torres J, Hugan J, Yücesan E, eds. Proc. 2010 Winter Simulation Conf., IEEE, 1898–1910.Google Scholar
  • Shih LH (1997) Planning of fuel coal imports using a mixed integer programming method. Internat. J. Production Econom. 51(3):243–249.CrossrefGoogle Scholar
  • Ulstein NL, Nygreen B, Sagli JR (2007) Tactical planning of offshore petroleum production. Eur. J. Oper. Res. 176(1):550–564.CrossrefGoogle Scholar
  • Winston WL (1994) Operations Research Applications and Algorithms, 3rd ed. (Duxbury Press, Belmont, CA), 164–169.Google Scholar
  • Zanakis SH, Evans JR (1981) Heuristic “optimization”: Why, when, and how to use it. Interfaces 11(5):84–91.LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.