Scotsburn Dairy Group Uses a Hierarchical Production Scheduling and Inventory Management System to Control Its Ice Cream Production
Published Online:24 Feb 2014https://doi.org/10.1287/inte.2013.0716
References
- (1986) Technical note—On the feasibility of aggregate production plans. Oper. Res. 34(5):796–800.Link, Google Scholar
- (1992) A hierarchical production planning and scheduling model. Decision Sci. 23(1):144–159.Crossref, Google Scholar
- (2001) The Kellogg Company optimizes production, inventory, and distribution. Interfaces 31(6):1–15.Link, Google Scholar
- (2009) Production scheduling and inventory management for an ice cream manufacturer using hierarchical planning models. Unpublished master’s thesis, Dalhousie University, Halifax, NS, Canada.Google Scholar
- (2001) A discussion of production planning approaches in the process industry. Accessed January 4, 2009, http://alfresco.uclouvain.be/alfresco/download/attach/workspace/SpacesStore/24960aca-a366-4636-8229-68d332a3af4c/coredp_2001_42.pdf.Google Scholar
- (2000) An analysis of process industry production and inventory. J. Oper. Management 18(6):683–699.Crossref, Google Scholar
- (1994) A typology of production control situations in process industries. Internat. J. Oper. Production Management 14(12):47–57.Crossref, Google Scholar
- (1975) Hierarchical integration of production planning and scheduling. Geisler MA, ed. Studies in Management Sciences, Vol. I: Logistics (Elsevier, New York), 53–69.Google Scholar
- (1998) Application of production planning and scheduling in the process industries. Comput. Indust. 36(3): 199–208.Crossref, Google Scholar
- (2003) Production scheduling at the Truro ice cream plant, Scotsburn Dairy Group. Unpublished report, Dalhousie University, Halifax, NS, Canada.Google Scholar
- (1988) A model for lot sizing and sequencing in process industries. Internat. J. Production Res. 26(4):647–674.Crossref, Google Scholar
- (1959) Dynamic version of the economic lot size model. Management Sci. 5(1):89–96.Link, Google Scholar

