Extraction and Backfill Scheduling in a Complex Underground Mine

Published Online:https://doi.org/10.1287/inte.2013.0730

References

  • Carlyle WM, Eaves BC (2001) Underground planning at Stillwater Mining Company. Interfaces 31(4):50–60.LinkGoogle Scholar
  • Chanda E (1990) An application of integer programming and simulation to production planning for a stratiform ore body. Mining Sci. Tech. 11(2):165–172.CrossrefGoogle Scholar
  • Fourer R, Gay DM, Kernighan BW (2003) AMPL: A Modeling Language for Mathematical Programming (Thompson Learning, Pacific Grove, CA).Google Scholar
  • Hamrin H (1997) Guide to Underground Mining Methods and Applications (Atlas Copco, Stockholm).Google Scholar
  • IBM (2011) ILOG CPLEX. Accessed December 1, 2012, http://www-01.ibm.com/software/commerce/optimization/cplex-optimizer/index.html.Google Scholar
  • Klotz E, Newman AM (2013) Practical guidelines for solving difficult mixed integer linear programs. Surveys Oper. Res. Management Sci. 18(12):18–32.Google Scholar
  • Maptek (2012) Vulcan. Accessed December 1, 2012, http://www.maptek.com/products/vulcan.Google Scholar
  • Martinez MA, Newman AM (2011) A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna mine. Eur. J. Oper. Res. 211(1):184–197.CrossrefGoogle Scholar
  • MineMax (2012) MineMax iGantt. Accessed December 1, 2012, http://www.minemax.com/downloads/Minemax-iGantt-Brochure.pdf.Google Scholar
  • Newman A, Kuchta M (2007) Using aggregation to optimize long-term production planning at an underground mine. Eur. J. Oper. Res. 176(2):1205–1218.CrossrefGoogle Scholar
  • Sarin S, West-Hansen J (2005) The long-term mine production scheduling problem. IIE Trans. 37(2):109–121.CrossrefGoogle Scholar
  • Smith M (1998) Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX. Internat. J. Surface Mining Reclamation Environ. 12(4):149–155.CrossrefGoogle Scholar
  • Trout L (1995) Underground mine production scheduling using mixed integer programming. 25th Internat. Sympos. Appl. Comput. Mineral Indust (APCOM), Brisbane, Australia, 395–400.Google Scholar
  • Williams JK, Smith L, Wells PM (1973) Planning of underground copper mining. 10th Internat. Appl. Sympos. Appl. Comput. Mineral Indust. (APCOM), Johannesburg, South Africa, 251–254.Google Scholar
  • Winkler B (1996) Using MILP to optimize period fix costs in complex mine sequencing and scheduling problems. 26th Internat. Appl. Sympos. Appl. Mineral Indust. (APCOM), University Park, PA, 441–446.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.