A Decision Support System for Highway Construction: The Autostrada Pedemontana Lombarda
Published Online:19 Apr 2016https://doi.org/10.1287/inte.2016.0847
References
- (2002) Planning linear construction projects: Automated method for the generation of earthwork activities. Automation Construction 11(6):643–653.Crossref, Google Scholar
- (2015) Suitably selection for earthwork equipment in Egyptian sites. Internat. J. Ed. Res. 3(1):539–549.Google Scholar
- (2015) Two-phase earthwork optimization model for highway construction. J. Construction Engrg. Management 141(6):05015003-1–05015003-11.Google Scholar
- (2014) An integrated approach for earthwork allocation, sequencing and routing. Eur. J. Oper. Res. 238(3):741–759.Crossref, Google Scholar
- (2015) Block models for improved earthwork allocation planning in linear infrastructure construction. Engrg. Optim. 47(3):347–369.Crossref, Google Scholar
- (2011) Models and algorithms to improve earthwork operations in road design using mixed integer linear programming. Eur. J. Oper. Res. 215(2):470–480.Crossref, Google Scholar
- (2007) Fuzzy optimization model for earthwork allocations with imprecise parameters. J. Construction Engrg. Management 133(2):181–190.Crossref, Google Scholar
- (2004) Multiobjective optimization of earthmoving operations. J. Construction Engrg. Management 130(1):105–113.Crossref, Google Scholar
- (2009) Optimization of earthmoving operations in heavy civil engineering projects. J. Construction Engrg. Management 135(10):948–954.Crossref, Google Scholar
- (2011) Solving the least-cost route cut and fill sequencing problem using particle swarm. J. Construction Engrg. Management 138(8):931–942.Crossref, Google Scholar
- (2015) An evolutionary multi-objective optimization system for earthworks. Expert Systems Appl. 42(19):6674–6685.Crossref, Google Scholar
- (2015) Two-dimensional earthwork optimization using mixed-integer programming. 90th Annual Meeting, Transportation Res. Board, Washington, DC.Google Scholar
- (2015) An integrated system for earthmoving planning. Construction Management Econom. 25(11):1127–1137.Crossref, Google Scholar
- (2008) Multi-objective simulation-optimization for earthmoving operations. Automation Construction 18(1):79–86.Crossref, Google Scholar

