Power System Operator in Mexico Reveals Millions in Savings by Updating Its Short-Term Thermal Unit Commitment Model

Published Online:https://doi.org/10.1287/inte.2016.0863

References

  • Alvarez J, Nieva R, Guillen I (2011) Commitment of combined cycle plants using a dual optimization-dynamic programming approach. IEEE Trans. Power Systems 26(2):728–737.CrossrefGoogle Scholar
  • Alvarez J, Ceciliano-Meza JL, Guillen I, Nieva R (2012) A MIQCP formulation to solve the unit commitment problem for large-scale power systems. Internat. J. Electr. Power Energy Systems 36(1):68–75.CrossrefGoogle Scholar
  • Alvarez J, Ceciliano-Meza JL, Guillen I, Nieva R (2013) A heuristic algorithm to solve the unit commitment problem for real-life large-scale power systems. Internat. J. Electr. Power Energy Systems 49(July):287–295.CrossrefGoogle Scholar
  • Bertsekas DP (1999) Nonlinear Programming, 2nd ed. (Athena Scientific, Belmont, MA).Google Scholar
  • Catalão JPS, Mariano SJPS, Mendes VMF, Ferreira LAFM (2006) Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model. Electr. Power Systems Res. 76(6–7):404–412.CrossrefGoogle Scholar
  • Catalão JPS, Mariano SJPS, Mendes VMF, Ferreira LAFM (2009)Scheduling of head-sensitive cascaded hydro systems: A nonlinear approach. IEEE Trans. Power Systems 24(1):337–346.CrossrefGoogle Scholar
  • Catalão JPS, Mariano SJPS, Mendes VMF, Ferreira LAFM (2010a) Nonlinear optimization method for short-term hydro scheduling considering head-dependency. Eur. Trans. Electr. Power 20(2):172–183.Google Scholar
  • Catalão JPS, Mariano SJPS, Mendes VMF, Ferreira LAFM (2010b) Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic approach. Energy Conversion Management 51(3):524–530.CrossrefGoogle Scholar
  • Glimn AF, Kirchmayer LK (1958) Economic operation of variable-head hydro-electric plants. AIEE Trans. 77(3):1070–1079.Google Scholar
  • Heredia FJ, Nabona N (1994) Development and computational tests of an undecoupled optimum short-term hydro-thermal scheduling code using network flows. Sociedad Española de Estadística e Investigación Operativa 2(1):105–132.Google Scholar
  • Jimenez N, Conejo AJ (1999) Short-term hydro-thermal coordination by Lagrangian relaxation. IEEE Trans. Power Systems 14(1):89–95.CrossrefGoogle Scholar
  • Kumar S, Naresh R (2007) Efficient real coded genetic algorithm to solve the non-convex hydrothermal scheduling problem. Electr. Power Energy Systems 29(1):738–747.CrossrefGoogle Scholar
  • Hsu YY, Su CC (1991) Dispatch of direct load control using dynamic programming. IEEE Trans. Power Systems 6(3):1056–1061.CrossrefGoogle Scholar
  • Nieva R, Inda A, Guillén I (1987) Lagrangian reduction of search-range for large-scale unit commitment. IEEE Trans. Power Systems 2(2):465–473.CrossrefGoogle Scholar
  • Sinha N, Chakrabarti R, Chattopadhyay PK (2003) Fast evolutionary programming techniques for short-term hydrothermal scheduling. IEEE Trans. Power Systems 18(1):214–220.CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.