Applying Operations Research to Scheduling Work Cells in a Manufacturing Environment
Published Online:6 Dec 2018https://doi.org/10.1287/inte.2018.0965
References
- (2005) On the use of integer programming vs. evolutionary solver in spreadsheet optimization. INFORMS Trans. Ed. 5(3):1–7.Link, Google Scholar
- (2009) Principles of Sequencing and Scheduling (John Wiley & Sons, Hoboken, NJ).Crossref, Google Scholar
- (2010) A decomposition scheme for single stage scheduling problems. J. Scheduling 13(3):203–212.Crossref, Google Scholar
- (2005) Multiple Criteria Decision Analysis: State of the Art Surveys (Springer Science & Business Media, Boston).Crossref, Google Scholar
- (1979) Optimization and approximation in deterministic sequencing and scheduling: A survey. Ann. Discrete Math. 5:287–326.Crossref, Google Scholar
- Johnson Electric Holdings Limited (2016) Johnson Electric Holdings Limited annual report 2016. Retrieved August 10, 2016, http://www.johnsonelectric.com/en/company/investor-relations/∼/media/FAD728A92DA341F68E9DD105C30662D6.ashx.Google Scholar
- (2010) The single-machine total tardiness scheduling problem: Review and extensions. Eur. J. Oper. Res. 202(1):1–7.Crossref, Google Scholar
- (2003) A fast and simple algorithm for bounds consistency of the all different constraint. IJCAI'03 Proc. 18th Internat. Joint Conf. Artificial Intelligence (Morgan Kaufmann Publishers Inc., San Francisco), 245–250.Google Scholar
- (2009) Planning and Scheduling in Manufacturing and Services, 2nd ed. (Springer, New York).Crossref, Google Scholar
- Strategos Inc. (2017) Workcells—the heart of lean manufacturing. Retrieved March 5, 2017, http://www.strategosinc.com/cellular_manufacturing.htm.Google Scholar
- (1989) Cellular manufacturing in the U.S. industry: A survey of users. Internat. J. Production Res. 27(9):1511–1530.Crossref, Google Scholar

