General Electric Uses Simulation and Risk Analysis for Silicon Carbide Production System Design

Published Online:https://doi.org/10.1287/inte.2018.0979

References

  • Ankenman BE, Nelson BL (2012) A quick assessment of input uncertainty. Laroque C, Himmelspach J, Pasupathy R, Rose O, Uhrmacher AM, eds. Proc. 2012 Winter Simulation Conf. (Institute of Electrical and Electronics Engineers, Piscataway, NJ), 241–250.Google Scholar
  • Biller B, Akcay A (2013) Stochastic input model selection. Fu M, Gass SI, eds. Encyclopedia of Operations Research and Management Science (Springer, Berlin), 1476–1486.Google Scholar
  • Biller B, Corlu CG (2015) Subset selection for simulations accounting for input uncertainty. Yilmaz L, Chan WKV, Moon I, Roeder TMK, Macal C, Rossetti, MD, eds. Proc. 2015 Winter Simulation Conf. (Institute of Electrical and Electronics Engineers, Piscataway, NJ), 437–446.Google Scholar
  • Chick SE (2001) Input distribution selection for simulation experiments: Accounting for input uncertainty. Oper. Res. 49(5):744–758.LinkGoogle Scholar
  • Fowler JW, Monch L, Ponsignon T (2015) Discrete-event simulation for semiconductor wafer fabrication facilities: A tutorial. Internat. J. Indust. Engrg. Theory Practice 22(5):661–682.Google Scholar
  • Helton JC (1997) Uncertainty and sensitivity analysis in the presence of stochastic and subjective uncertainty. J. Statist. Comput. Simulation 57(1-4):3–76.Google Scholar
  • Johnson C, Biller B, Wang San, Biller SR (2016) Analytics approach for incorporating market demand into production design and operations optimization. Li J, Zhou S, Han Y, eds. Advances in Battery Manufacturing, Service, and Management Systems (Wiley, New York), 99–126.Google Scholar
  • Law AM (2015) Simulation Modeling and Analysis, 5th ed. (McGraw Hill, New York).Google Scholar
  • Miller DJ (1990) Simulation of a semiconductor manufacturing line. Comm. ACM 30(10):98–108.Google Scholar
  • Monch L, Fowler JW, Mason SJ (2013) Production Planning and Control for Semiconductor Wafer Fabrication Facilities: Modeling, Analysis, and Systems (Springer, New York).Google Scholar
  • Olson R, Hawkins JW, Piacentea P, Franka R, Delucaa J, Douglasa L, Trant G (2009) Micro and nano R&D fab performance and productivity: A lean six-sigma approach. Electrochemical Soc. Trans. 16(40):35–46.Google Scholar
  • Raftery AE, Madigan D, Volinsky CT (1996) Accounting for model uncertainty in survival analysis improves predictive performance (with discussion). Bernardo JM, Berger JO, David AP, Smith AFM, eds. Bayesian Statistics (University Press, Oxford, UK), 323–349.Google Scholar
  • Rao PSRS (1997) Variance Components Estimation: Mixed Models, Methodologies, and Applications (Chapman & Hall, London).Google Scholar
  • Song E, Nelson BL, Pegden CD (2014) Advanced tutorial: Input uncertainty quantification. Tolk A, Diallo SY, Ryzhov IO, Yilmaz L, Buckley S, Miller JA, eds. Proc. 2014 Winter Simulation Conf. (Institute of Electrical and Electronics Engineers, Piscataway, NJ), 162–176.Google Scholar
  • Wood SC (2007) Factory modeling. Doering R, Nishi Y, eds. Handbook of Semiconductor Manufacturing Technology (CRC Press, Boca Raton, FL), chapter 34, 1–23.Google Scholar
  • Yole Développement (2013) SiC market 2013: Technology and market for SiC wafers, devices and power modules. Report, Yole Développement, Phoenix.Google Scholar
  • Zouaoui F, Wilson JR (2003) Accounting for parameter uncertainty in simulation input modeling. IIE Trans. 35(9):781–792.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.