Barrick’s Turquoise Ridge Gold Mine Optimizes Underground Production Scheduling Operations

Published Online:https://doi.org/10.1287/inte.2020.1027

References

  • Barrick Gold Corporation (2017) Operations and technical update. Accessed June 23, 2018, https://www.barrick.com/investors/presentations-reports/event-details/2017/Operations-and-Technical-Update/default.aspx.Google Scholar
  • Bienstock D , Zuckerberg M (2010) Solving LP relaxations of large-scale precedence constrained problems. Eisenbrand F, Shepherd FB, eds. Integer Programming and Combinatorial Optimization , Lecture Notes in Computer Science, vol. 6080 (Springer-Verlag, Berlin, Heidelberg), 1–14.Google Scholar
  • Brazil M , Grossman PA , Lee DH , Rubinstein JH , Thomas DA , Wormald NC (2008) Decline design in underground mines using constrained path optimisation. Mining Tech. 117(2):93–99.Google Scholar
  • Brickey A (2015) Underground production scheduling optimization with ventilation constraints. PhD thesis, Colorado School of Mines, Golden.Google Scholar
  • Brucker P , Knust S (2012) Complex Scheduling (Springer-Verlag, Berlin, Heidelberg).Google Scholar
  • Carlyle M , Eaves B (2001) Underground planning at Stillwater Mining Company. Interfaces 31(4):50–60.LinkGoogle Scholar
  • Carter P (2011) Selection process for hard-rock mining. Darling P , ed. SME Mining Engineering Handbook . 3rd ed. (Society for Mining, Metallurgy, and Exploration, Englewood, CO), 357–376.Google Scholar
  • Chicoisne R , Espinoza D , Goycoolea M , Moreno E , Rubio E (2012) A new algorithm for the open-pit mine production scheduling problem. Oper. Res. 60(3):517–528.LinkGoogle Scholar
  • Chowdu AA , Goycoolea M , Brickey AJ (2019) Mine schedule optimization and mine operational realities: Bridging the gap. Mueller C , Assibey-Bonsu W , Baafi E , Dauber C , Doran C , Jasczuk MJ , Nagovitsyn O , eds. Mining Goes Digital: Proc. 39th Internat. Sympos. Appl. Comput. Oper. Res. Mineral Indust. (APCOM) (Taylor & Francis, London), 412–418.Google Scholar
  • Darling P (2011) Mining: Ancient, modern and beyond. Darling P, ed. SME Mining Engineering Handbook . 3rd ed. (Society for Mining, Metallurgy, and Exploration Englewood, CO), 3–9.Google Scholar
  • Deswik Mining Consultants (Australia) Pty Ltd (2018) Deswik mine planning software. Accessed July 12, 2018, https://www.deswik.com/.Google Scholar
  • Fuerstenau M , Han K (2011) Introduction to mineral processing. Darling P, ed. SME Mining Engineering Handbook . 3rd ed. (Society for Mining, Metallurgy, and Exploration, Englewood, CO), 1455–1459.Google Scholar
  • Hambley D (2011) Backfill mining. Darling P, ed. SME Mining Engineering Handbook . 3rd ed. (Society for Mining, Metallurgy, and Exploration, Englewood, CO), 1375–1384.Google Scholar
  • Hustrulid WA , Bullock RC (2001) Underground Mining Methods: Engineering Fundamentals and International Case Studies (Society for Mining, Metallurgy, and Exploration, Englewood, CO).Google Scholar
  • Johnson T (1968) Optimum open pit mine production scheduling. PhD thesis, University of California, Berkeley.Google Scholar
  • King B , Goycoolea M , Newman A (2016) Optimizing the open pit-to-underground mining transition. Eur. J. Oper. Res. 257(1):297–309.Google Scholar
  • King B , Goycoolea M , Newman A (2017) New integer programming models for tactical and strategic underground production scheduling. Mining Engrg. 69(3):37–42.Google Scholar
  • Kuchta M , Newman A , Topal E (2004) Implementing a production schedule at LKAB’s Kiruna mine. Interfaces 34(2):124–134.LinkGoogle Scholar
  • Lambert B , Brickey A , Newman A , Eurek K (2014) Open-pit block-sequencing formulations: A tutorial. Interfaces 44(2):127–142.LinkGoogle Scholar
  • Martinez M , Newman A (2011) A solution approach for optimizing long-and short-term production scheduling at LKAB’s Kiruna mine. Eur. J. Oper. Res. 211(1):184–197.Google Scholar
  • Moore P (2017) Turquoise Ridge transitioning to mechanical cutting with Sandvik Roadheader. Internat. Mining (November 22), https://im-mining.com/2017/11/22/turquoise-ridge-transitioning-mechanical-cutting-sandvik-roadheader/.Google Scholar
  • Moreno E , Rezakhah M , Newman A , Ferreira F (2017) Linear models for stockpiling in open-pit mine production scheduling problems. Eur. J. Oper. Res. 260(1):212–221.Google Scholar
  • Muñoz G , Espinoza D , Goycoolea M , Moreno E , Queyranne M , Rivera O (2018) A study of the Bienstock–Zuckerberg algorithm: Applications in mining and resource constrained project scheduling. Comput. Optim. Appl. 69(2):501–534.Google Scholar
  • Newman A , Rubio E , Caro R , Weintraub A , Eurek K (2010) A review of operations research in mine planning. Interfaces 40(3):222–245.LinkGoogle Scholar
  • O’Sullivan D , Newman A (2014) Extraction and backfill scheduling in a complex underground mine. Interfaces 44(2):204–221.LinkGoogle Scholar
  • O’Sullivan D , Brickey A , Newman A (2015) Is openpit production scheduling “easier” than its underground counterpart? Mining Engrg. 67(4):68–73.Google Scholar
  • Rivera O , Goycoolea M , Moreno E , Espinoza D (2015) The OMP Guide. Unpublished software documentation, Universidad Adolfo Ibáñez, Santiago, Chile.Google Scholar
  • Sarin S , West-Hansen J (2005) The long-term mine production scheduling problem. IIE Trans. 37(2):109–121.Google Scholar
  • Schwindt C , Zimmermann J , eds. (2015) Handbook on Project Management and Scheduling , vol. 2 (Springer International Publishing, Cham, Switzerland).Google Scholar
  • Sipeki L , Newman AM , Yano CA (2020) Selecting support pillars in underground mines with ore veins. IISE Trans., ePub ahead of print January 29, https://doi.org/10.1080/24725854.2019.1699978.Google Scholar
  • Stermole FJ , Stermole JM (2014) Economic Evaluation and Investment Decision Methods . 14th ed. (Investment Evaluations Corp., Lakewood, CO).Google Scholar
  • Trout LP (1995) Underground mine production scheduling using mixed integer programming. Proc. 25th Internat. APCOM Sympos. (Australasian Institute of Mining and Metallurgy, Brisbane, Australia), 395–400.Google Scholar
  • Tuck M (2011) Underground horizontal and inclined development methods. Darling P , ed. SME Mining Engineering Handbook . 3rd ed. (Society for Mining, Metallurgy, and Exploration, Englewood, CO), 1179–1202.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.