The Volkswagen Pre-Production Center Applies Operations Research to Optimize Capacity Scheduling
References
- (2017) How sourcing of interdependent components affects quality in automotive supply chains. Production Oper. Management 26(8):1512–1533.Google Scholar
- (2000) Pilot production and manufacturing start-up: The case of Volvo S80. Internat. J. Production Res. 38(17):4577–4588.Google Scholar
- (2017) Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm. Comput. Indust. Engrg. 107:141–149.Google Scholar
- (2009) Scheduling tests in automotive R&D projects. Eur. J. Oper. Res. 193(3):805–819.Google Scholar
- (2017) Strategic ramp-up planning in automotive production networks. Internat. J. Production Res. 55(1):59–78.Google Scholar
- (2017) Robust product line design. Oper. Res. 65(1):19–37.Link, Google Scholar
- (2019) Exact first-choice product line optimization. Oper. Res. 67(3):651–670.Link, Google Scholar
- (1999) Resource-constrained project scheduling. Notation, classification, models, and methods. Eur. J. Oper. Res. 112(1):3–41.Google Scholar
- (2001) Rightsizing and management of prototype vehicle testing at Ford Motor Company. Interfaces 31(1):91–107.Link, Google Scholar
- (2009) Project selection, scheduling and resource allocation with time dependent returns. Eur. J. Oper. Res. 193(1):23–34.Google Scholar
- (2002) Project Scheduling: A Research Handbook, International Series in Operations Research and Management Science, vol. 49 (Kluwer Academic, Boston).Google Scholar
- (2017) Learning by doing in multiproduct manufacturing: Variety, customizations, and overlapping product generations. Management Sci. 63(2):405–423.Link, Google Scholar
- (2006) Strategic planning of BMW’s global production network. Interfaces 36(3):194–208.Link, Google Scholar
- (1974) Multicommodity distribution system design by Benders Decomposition. Management Sci. 20(5):822–844.Link, Google Scholar
- (2015) Decision support models for production ramp-up: A systematic literature review. Internat. J. Production Res. 53(21):6637–6651.Google Scholar
- (2013) The impact of new product introduction on plant productivity in the North American automotive industry. Management Sci. 59(10):2217–2236.Link, Google Scholar
- (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 207(1):1–14.Google Scholar
- (2005) Project scheduling-theory and practice. Production Oper. Management 14(4):413–432.Google Scholar
- (2004) General Motors optimizes its scheduling of cold-weather tests. Interfaces 34(5):334–341.Link, Google Scholar
- (1980) Solving large-scale problems: A venture into a new dimension. J. Oper. Res. Soc. 31(3):217–225.Google Scholar
- (2017) Commonality decisions when designing for multiple markets. Eur. J. Oper. Res. 258(3):902–911.Google Scholar
- (2019) To adapt or design: An emerging market dilemma for automakers. Production Oper. Management 28(3):550–569.Google Scholar
- (1986) A market entry timing model for new technologies. Management Sci. 32(2):194–205.Link, Google Scholar
- (2016) A MILP model and heuristic approach for facility location under multiple operational constraints. Comput. Indust. Engrg. 98:446–461.Google Scholar
- (2014) A hybrid simulation approach for estimating the market share evolution of electric vehicles. Transportation Sci. 48(4):651–670.Link, Google Scholar
- (2017) Analyzing manufacturers’ impact on green products’ market diffusion—the case of electric vehicles. J. Cleaner Production 162:S11–S25.Google Scholar
- (2006) Selection and scheduling of pharmaceutical research projects. Józefowska J, Weglarz J, eds. Perspectives in Modern Project Scheduling, International Series in Operations Research & Management Science (Springer, New York), 321–344.Google Scholar
- (2001) Product development decisions: A review of the literature. Management Sci. 47(1):1–21.Link, Google Scholar
- (2018) A hybrid TLBO-TS algorithm for integrated selection and scheduling of projects. Comput. Indust. Engrg. 119:121–130.Google Scholar
- (2008) Introduction: The use of spreadsheet software in the application of management science and operations research. Interfaces 38(4):225–227.Link, Google Scholar
- (2019) Sustainable supplier selection and order allocation: A novel multi-objective programming model with a hybrid solution approach. Comput. Indust. Engrg. 129:192–209.Google Scholar
- (2009) Complementarity among vertical integration decisions: Evidence from automobile product development. Management Sci. 55(2):311–332.Link, Google Scholar
- (2019) Diffusion of alternative fuel vehicles considering dynamic preferences. Tech. Forecasting Soc. Change 147(October):83–99.Google Scholar
- (1995) Optimal design of mechanical engineering systems. J. Mech. Design 117(B):55–62.Google Scholar
- (2016) Scheduling crash tests at Ford Motor Company. Interfaces 46(5):409–423.Link, Google Scholar
- (2010) Applied materials uses operations research to design its service and parts network. Interfaces 40(4):253–266.Link, Google Scholar
- (2017) Integrated resource management for simultaneous project selection and scheduling. Comput. Indust. Engrg. 109:39–47.Google Scholar
- (2017) An analytical approach to prototype vehicle test scheduling. Omega 67(March):168–176.Google Scholar
- (1989) Modeling managerial behavior: Misperceptions of feedback in a dynamic decision making experiment. Management Sci. 35(3):321–339.Link, Google Scholar
- (1998) Managing experimentation in the design of new products. Management Sci. 44(6):743–762.Link, Google Scholar
- (2015) Modeling and solving the project selection and scheduling. Comput. Indust. Engrg. 83:30–38.Google Scholar
- (2018) A review of production and operations management research on outsourcing in supply chains: implications for the theory of the firm. Production Oper. Management 27(7):1177–1220.Google Scholar
- (2018a) Optimization of strategic planning processes for configurable products. J. Oper. Res. Soc. 69(11):1834–1853.Google Scholar
- (2018b) Promoting sustainability of automotive products through strategic assortment planning. Eur. J. Oper. Res. 269(1):272–285.Google Scholar
- (2016) Planning for ramp-ups and new product introductions in the automotive industry: extending sales and operations planning. Internat. J. Production Econom. 182(December):372–383.Google Scholar
- (2019) Supplier portfolio of key outsourcing parts selection using a two-stage decision making framework for Chinese domestic auto-maker. Comput. Indust. Engrg. 128:559–575.Google Scholar
- (2019) TRUMPF uses a mixed integer model as decision support for strategic production network design. Interfaces 49(3):213–226.Google Scholar

