Operations Research in Underground Mine Planning: A Review

Published Online:https://doi.org/10.1287/inte.2021.1087

References

  • Abzalov M (2016) Mining methods. Applied Mining Geology, Modern Approaches in Solid Earth Sciences, vol. 12 (Springer, Cham, Switzerland), 5–18.Google Scholar
  • Afum BO, Ben-Awuah E, Askari-Nasab H (2020) A mixed integer linear programming framework for optimising the extraction strategy of open pit–underground mining options and transitions. Internat. J. Mining Reclamation Environ. 34(10):700–724.Google Scholar
  • Alford C (1995) Optimisation in underground mine design. Proc. APCOM XXV Appl. Comput. Oper. Res. Minerals Indust. (Australasian Institute of Mining and Metallurgy, Melbourne, VIC, Australia), 213–218.Google Scholar
  • Alford Mining Systems (2019) Mineable Shape Optimizer. Accessed October 20, 2019, http://alfordminingsystems.com/wordpress/?page_id=74.Google Scholar
  • Alford C, Hall B (2009) Stope optimisation tools for selection of optimum cut-off grade in underground mine design. Project Evaluation Conf. 2009 (Australasian Institute of Mining and Metallurgy, Melbourne, VIC, Australia), 137–144.Google Scholar
  • Alford C, Brazil M, Lee DH (2007) Optimisation in underground mining. Weintraub A, Romero C, Bjørndal T, Epstein R, Miranda J, eds. Handbook of Operations Research in Natural Resources (Springer, Boston), 561–577.Google Scholar
  • Alonso-Ayuso A, Carvallo F, Escudero LF, Guignard M, Pi J, Puranmalka R, Weintraub A (2014) Medium range optimization of copper extraction planning under uncertainty in future copper prices. Eur. J. Oper. Res. 233(3):711–726.Google Scholar
  • Anani AK (2016) Applications of simulation and optimization techniques in optimizing room and pillar mining systems. PhD thesis, Missouri Institute of Science and Technology, Rolla.Google Scholar
  • Anani A, Awuah-Offei K, Hirschi J (2017) Application of discrete event simulation in optimising coal mine room-and-pillar panel width: A case study. Mining Tech. 126(1):1–9.Google Scholar
  • Anjomshoa H, Albrecht AR, Lee DH, Pudney PJ (2012) Efficient vehicle haulage in underground mines. Mining Tech. 121(2):83–90.Google Scholar
  • Antropov N (n.d.) The set of mining vehicles. Accessed February 5, 2020, https://www.shutterstock.com/image-vector/set-mine-mining-vehicles-machine-underground-431371729.Google Scholar
  • Åstrand M (2018) Short-term underground mine scheduling constraint programming in an industrial application. PhD thesis, KTH Royal Institute of Technology, Stockholm.Google Scholar
  • Ataei M, Shahsavany H, Mikaeil R (2013) Monte Carlo analytic hierarchy process (MAHP) approach to selection of optimum mining method. Internat. J. Mining Sci. Tech. 23(4):573–578.Google Scholar
  • Bai X, Marcotte D, Simon R (2013) Underground stope optimization with network flow method. Comput. Geosci. 52(March):361–371.Google Scholar
  • Bai X, Marcotte D, Simon R (2014) A heuristic sublevel stope optimizer with multiple raises. J. Southern African Inst. Mining Metallurgy 114(6):427–434.Google Scholar
  • Balusa BC, Gorai AK (2019) A comparative study of various multi-criteria decision-making models in underground mining method selection. J. Inst. Engineers (India): Ser. D 100(1):105–121.Google Scholar
  • Basiri Z, Pourrahimian Y (2018) Application of mathematical programming for stope layout and production schedule optimization in sublevel stoping. Mining Optim. Laboratory 8(1):235–245.Google Scholar
  • Ben-Awuah E, Richter O, Elkington T, Pourrahimian Y (2016) Strategic mining options optimization: Open pit mining, underground mining or both. Internat. J. Mining Sci. Tech. 26(6):1065–1071.Google Scholar
  • Benndorf J, Jansen JD (2017) Recent developments in closed-loop approaches for real-time mining and petroleum extraction. Math. Geosci. 49(3):277–306.Google Scholar
  • Bienstock D, Zuckerberg M (2010) Solving LP relaxations of large-scale precedence constrained problems. Eisenbrand F, Shepherd FB, eds. Integer Programming and Combinatorial Optimization 2010 (Springer, Berlin), 1–14.Google Scholar
  • Bitarafan MK, Ataei M (2004) Mining method selection by multiple criteria decision making tools. J. Southern African Inst. Mining Metallurgy 104(9):493–498.Google Scholar
  • Bogdanovic D, Nikolic D, Ivana I (2012) Mining method selection by integrated AHP and PROMETHEE method. Annals Brazilian Acad. Sci. 84(1):219–233.Google Scholar
  • Bootsma MT, Alford C, Benndorf J, Buxton MWN (2014) Cut-off grade based sublevel stope mine optimisation. Dimitrakopoulos R, ed. Advances in Applied Strategic Mine Planning (Springer, Cham, Switzerland), 537–557.Google Scholar
  • Botin JA, Campbell AN, Guzman R (2014) A simulation model for the optimization and risk management of preproduction mine development. SME Annual Meeting 2014 (Society for Mining, Metallurgy & Exploration, Englewood, CO), 1–5.Google Scholar
  • Bouffard SC, Boggis P, Monk B, Pereira M, Quan K, Fleming S (2018) Discrete-event simulation modeling unlocks value for the Jansen Potash project. Interfaces 48(1):45–56.LinkGoogle Scholar
  • Brans JP, Mareschal B (2005) PROMETHEE methods. Greco S, ed. Multiple Criteria Decision Analysis: State of the Art Surveys (Springer, New York), 163–186.Google Scholar
  • Brazil M, Grossman P, Rubinstein JH, Thomas D (2014) Improving underground mine access layouts using software tools. Interfaces 44(2):195–203.LinkGoogle Scholar
  • Brickey AJ (2015) Underground production scheduling optimization with ventilation constraints. PhD thesis, Colorado School of Mines, Golden.Google Scholar
  • Brickey AJ, Chowdu A, Newman A, Goycoolea M, Godard R (2021) Barrick’s Turquoise Ridge gold mine optimizes underground production scheduling operations. INFORMS J. Appl. Analytics 51(2):106–118.LinkGoogle Scholar
  • Bullock RL (2011a) Introduction to underground mine planning. Darling P, ed. SME Mining Engineering Handbook, vol. 1 (Society for Mining, Metallurgy, and Exploration, Englewood, CO), 1135–1141.Google Scholar
  • Bullock RL (2011b) Subsurface mine development. Darling P, ed. SME Mining Engineering Handbook, vol. 1 (Society for Mining, Metallurgy, and Exploration, Englewood, CO), 1203–1221.Google Scholar
  • Campeau LP, Gamache M (2020) Short-term planning optimization model for underground mines. Comput. Oper. Res. 115(March):104642.Google Scholar
  • Carpentier S, Gamache M, Dimitrakopoulos R (2016) Underground long-term mine production scheduling with integrated geological risk management. Mining Tech. 125(2):93–102.Google Scholar
  • Carter RA (2014) Equipment selection is key for productivity in underground loading and haulage. Engrg. Mining J. (June), https://www.e-mj.com/features/equipment-selection-is-key-for-productivity-in-underground-loading-and-haulage/.Google Scholar
  • Caterpillar (2019) Caterpillar underground hard rock mining equipment. Accessed October 20, 2019, https://www.cat.com/en_US/products/new/equipment/underground-hard-rock.html.Google Scholar
  • Chicoisne R, Espinoza D, Goycoolea M, Moreno E, Rubio E (2012) A new algorithm for the open-pit mine production scheduling problem. Oper. Res. 60(3):517–528.LinkGoogle Scholar
  • Chung J, Asad M, Topal E, Ghosh AK (2016) Determination of the transition point from open pit to underground mining. Ninth AusIMM Open Pit Operators’ Conf. 2016 (Australasian Institute of Mining and Metallurgy, Melbourne, VIC, Australia), 96–103.Google Scholar
  • Collard J (2013) Strategic planning of an underground mine with variable cut-off grade. PhD thesis, University of Montreal, Montreal.Google Scholar
  • Copland T, Nehring M (2016) Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations. J. Southern African Inst. Mining Metallurgy 116(7):1135–1142.Google Scholar
  • Dagdelen K, Traore I (2018) Open pit transition depth determination through global analysis of open pit and underground mine production scheduling. Dimitrakopoulos R, ed. Advances in Applied Strategic Mine Planning (Springer, Cham, Switzerland), 287–296.Google Scholar
  • Dehghani H, Siami A, Haghi P (2017) A new model for mining method selection based on grey and TODIM methods. J. Mining Environ. 8(1):49–60.Google Scholar
  • Diering T, Richter O, Villa D (2010) Block cave production scheduling using PCBC. SME Annual Meeting Conf. 2010: Pre-prints (Society for Mining, Metallurgy & Exploration, Englewood, CO), 1–13.Google Scholar
  • Dirkx R, Kazakidis V, Dimitrakopoulos R (2019) Stochastic optimisation of long-term block cave scheduling with hang-up and grade uncertainty. Internat. J. Mining Reclamation Environ. 33(6):371–388.Google Scholar
  • Dowd PA, Xu C, Coward S (2016) Strategic mine planning and design: Some challenges and strategies for addressing them. Mining Tech. 125(1):22–34.Google Scholar
  • Elkington T, Grobler F, Myers P (2010) Supporting robust strategic underground mine decision-making. CIM Conf. 2010 (Canadian Institute of Mining, Metallurgy and Petroleum, Montreal), 1–11.Google Scholar
  • Epstein R, Goic M, Weintraub A, Catalán J, Santibáñez P, Urrutia R, Cancino R, Gaete S, Aguayo A, Caro F (2012) Optimizing long-term production plans in underground and open-pit copper mines. Oper. Res. 60(1):4–17.LinkGoogle Scholar
  • Erdogan G, Cigla M, Topal E, Yavuz M (2017) Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine. Internat. J. Mining Reclamation Environ. 31(6):389–403.Google Scholar
  • Espinoza D, Goycoolea M, Moreno E, Newman A (2013) MineLib: A library of open pit mining problems. Ann. Oper. Res. 206(1):93–114.Google Scholar
  • Fava L, Millar D, Maybee B (2011) Scenario evaluation through mine schedule optimisation. Kuyvenhoven R, Rubio E, Smith M, eds. Proc. 2nd Internat. Seminar Mine Planning (Gecamin, Antofagasta, Chile), 1–10.Google Scholar
  • Finch A, Elkington T (2011) Optimising open pit to underground cut-over. Proc. CIM/ICM Conf. Exhibition 2011 (Canadian Institute of Mining, Metallurgy and Petroleum, Montreal), 88–89.Google Scholar
  • Fioroni MM, dos Santos LCA, Franzese LAG, Santana IR, Telles GD, Seixas JC, Penna B, de Alkmim GM (2014) Logistic evaluation of an underground mine using simulation. REM Rev. Escola Minas 67(4):447–454.Google Scholar
  • Foroughi S, Hamidi JK, Monjezi M, Nehring M (2019) The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II). Resources Policy 63(October):101408.Google Scholar
  • Franceschini F, Maisano D, Mastrogiacomo L (2016) A new proposal for fusing individual preference orderings by rank-ordered agents: A generalization of the Yager’s algorithm. Eur. J. Oper. Res. 249(1):209–223.Google Scholar
  • Fuykschot J (2009) Strategic mine planning—Flexible mine planning to meet changes in the business environment. Presentation, Minex Forum and Expo 2009, September 30, MINEX, Moscow.Google Scholar
  • Gligorić MV, Gligorić ZM, Beljić ČR, Lutovac SM, Damnjanović VM (2019) Long-term room and pillar mine production planning based on fuzzy 0-1 linear programing and multicriteria clustering algorithm with uncertainty. Math. Problems Engrg. 2019:1–26.Google Scholar
  • Gomes ARA, Reyes G, Ulloa JC (2013) Design aspects of the permanent underground infrastructure for the Chuquicamata mine in Chile. Geomech. Tunnelling 6(4):327–337.Google Scholar
  • Gransell F (2016) Decision analysis: Determining the most appropriate drilling method for production drilling in underground mining. Master’s thesis, University of Gävle, Gävle, Sweden.Google Scholar
  • Grossman P, Brazil M, Rubinstein J, Thomas D (2018) Scheduling the construction of value and discount weighted trees for maximum net present value. Comput. Oper. Res. 115(March):104578.Google Scholar
  • Gu X, Wang Q, Chu D, Zhang B (2010) Dynamic optimization of cutoff grade in underground metal mining. J. Central South Univ. Tech. 17(3):492–497.Google Scholar
  • Gupta S, Kumar U (2012) An analytical hierarchy process (AHP)-guided decision model for underground mining method selection. Internat. J. Mining Reclamation Environ. 26(4):324–336.Google Scholar
  • Gurobi Optimization LLC (2019) Gurobi Optimizer. Accessed October 20, 2019, http://www.gurobi.com.Google Scholar
  • Hall BE (2009) Short-term gain for long-term pain—How focusing on tactical issues can destroy long-term value. J. Southern African Inst. Mining Metallurgy 109(3):147–156.Google Scholar
  • Hall B (2014) Cut-off Grades and Optimising the Strategic Mine Plan (Australasian Institute of Mining and Metallurgy, Carlton, VIC, Australia).Google Scholar
  • Hamrin H (1998) Choosing an underground mining method. Gertsch R, Bullock RL, eds. Techniques in Underground Mining - Selections from Underground Mining Methods Handbook (Society for Mining, Metallurgy and Exploration, Littleton, CO), 45–85.Google Scholar
  • Hamrin H (2001) Underground mining methods and applications. Hamrin H, Hustrulid W, Bullock RL, eds. Underground Mining Methods: Engineering Fundamentals and International Case Studies (Society for Mining, Metallurgy and Exploration, Littleton, CO), 3–14.Google Scholar
  • Huang S, Li G, Ben-Awuah E, Afum BO, Hu N (2020) A robust mixed integer linear programming framework for underground cut-and-fill mining production scheduling. Internat. J. Mining Reclamation Environ. 34(6):397–414.Google Scholar
  • IBM Corporation (2019) IBM CPLEX Optimizer. Accessed October 20, 2019, https://www.ibm.com/analytics/cplex-optimizer.Google Scholar
  • Iphar M, Alpay S (2019) A mobile application based on multi-criteria decision-making methods for underground mining method selection. Internat. J. Mining Reclamation Environ. 33(7):480–504.Google Scholar
  • Jakubec J (2016) Caving Cu-Au porphyry. Presentation, International Convention, Trade Show & Investors Exchange, March 7, PDAC, Toronto.Google Scholar
  • Javanshirgiv M, Safari M (2017) The selection of an underground mining method using the fuzzy topsis method: A case study in the Kamar Mahdi II fluorine mine. Mining Sci. 24:161–181.Google Scholar
  • Kabwe E (2017) Optimal mining method selection for Nchanga’s upper orebody using analytic hierarchy process and Yager’s method. Mining Tech. 126(3):151–162.Google Scholar
  • Kenzap SA, Kazakidis VN (2013) Operating risk assessment for underground metal mining systems: Overview and discussion. Internat. J. Mining Mineral Engrg. 4(3):175–200.Google Scholar
  • Khodayari F, Pourrahimian Y (2015) Mathematical programming applications in block-caving scheduling: A review of models and algorithms. Internat. J. Mining Mineral Engrg. 6(3):234–257.Google Scholar
  • Khodayari F, Pourrahimian Y (2019) Long-term production scheduling optimization and 3D material mixing analysis for block caving mines. Mining Tech. 128(2):65–76.Google Scholar
  • King B, Newman A (2018) Optimizing the cutoff grade for an operational underground mine. Interfaces 48(4):357–371.LinkGoogle Scholar
  • King B, Goycoolea M, Newman A (2017) Optimizing the open pit-to-underground mining transition. Eur. J. Oper. Res. 257(1):297–309.Google Scholar
  • Kloppers BJ, Horn CJ, Visser JVZ (2015) Strategic and tactical requirements of a mining long-term plan. J. Southern African Inst. Mining Metallurgy 115(6):515–521.Google Scholar
  • Lambert WB, Brickey AJ, Newman AM, Eurek K (2014) Open-pit block-sequencing formulations: A tutorial. Interfaces 44(2):127–142.LinkGoogle Scholar
  • Lane KF (1988) The Economic Definition of Ore (Mining Communications Ltd., London).Google Scholar
  • Little J, Topal E, Knights P (2012) Simultaneous optimisation of stope layouts and long term production schedules. Mining Tech. 120(3):129–136.Google Scholar
  • Lopes TVF (2017) Underground mine production scheduling using OMP solver: Analysis of modifications to an integer programming model and implementation of a sliding time window heuristic. Master’s thesis, South Dakota School of Mines & Technology, Rapid City.Google Scholar
  • MacNeil JA, Dimitrakopoulos RG (2017) A stochastic optimization formulation for the transition from open pit to underground mining. Optim. Engrg. 18(3):793–813.Google Scholar
  • Malaki S, Khodayari F, Pourrahimian Y, Liu W (2017) An application of mathematical programming and sequential Gaussian simulation for block cave production scheduling. Hudyma M, Potvin Y, eds. Proc. First Internat. Conf. Underground Mining Tech. (Australian Centre for Geomechanics, Crawley, WA), 323–337.Google Scholar
  • Manríquez F, Pérez J, Morales N (2020) A simulation–optimization framework for short-term underground mine production scheduling. Optim. Engrg. 21(3):939–971.Google Scholar
  • Martinelli R, Collard J, Gamache M (2020) Strategic planning of an underground mine with variable cut-off grades. Optim. Engrg. 21(3):803–849.Google Scholar
  • Martinez MA, Newman AM (2011) A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna mine. Eur. J. Oper. Res. 211(1):184–197.Google Scholar
  • Maybee B, Fava L (2011) Risk-based evaluation for underground mine planning. Kuyvenhoven R, Rubio E, Smith M, eds. Proc. 2nd Internat. Seminar Mine Planning (Gecamin, Antofagasta, Chile), 1–7.Google Scholar
  • McCarthy PL (2011) Hard-rock equipment selection and sizing. Darling P, ed. SME Mining Engineering Handbook (Society for Mining, Metallurgy, and Exploration, Littleton, CO), 1143–1155.Google Scholar
  • McIsaac G (2008) Strategic design of an underground mine under conditions of metal price uncertainty. PhD thesis, Queen’s University, Kingston, ON, Canada.Google Scholar
  • Musingwini C (2016) Presidential address: Optimization in underground mine planning- developments and opportunities. J. Southern African Inst. Mining Metallurgy 116(9):809–820.Google Scholar
  • Musingwini C, Minnitt RCA (2008) Ranking the efficiency of selected platinum mining methods using the analytic hierarchy process (AHP). Rogers M, ed. Third Internat. Platinum Conf. Platinum Transformation (Southern African Institute of Mining and Metallurgy, Johannesburg, South Africa), 319–326.Google Scholar
  • Nehring M, Topal E, Kizil M, Knights P (2010) An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling. Drebenstedt C, Singhal R, eds. Mine Planning Equipment Selection Conf. 2010 (Australasian Institute of Mining and Metallurgy, Carlton, VIC, Australia), 141–154.Google Scholar
  • Nehring M, Topal E, Kizil M, Knights P (2012) Integrated short- and medium-term underground mine production scheduling. J. Southern African Inst. Mining Metallurgy 112(5):365–378.Google Scholar
  • Nelis G, Gamache M, Marcotte D, Bai X (2016) Stope optimization with vertical convexity constraints. Optim. Engrg. 17(4):813–832.Google Scholar
  • Nesbitt P, Sipeki L, Flamand T, Newman AM (2020) Optimizing underground mine design with method-dependent precedences. IISE Trans. 53(6):643–656.Google Scholar
  • Nesbitt P, Blake LR, Lamas P, Goycoolea M, Pagnoncelli B, Newman AM, Brickey A (2021) Underground mine scheduling under uncertainty. Eur. J. Oper. Res. 294(1):340–352.Google Scholar
  • Newman AM, Yano CA, Rubio E (2013) Mining above and below ground: Timing the transition. IIE Trans. 45(8):865–882.Google Scholar
  • Newman AM, Rubio E, Caro R, Weintraub A, Eurek K (2010) A review of operations research in mine planning. Interfaces 40(3):222–245.LinkGoogle Scholar
  • Nezhadshahmohammad F, Aghababaei H, Pourrahimian Y (2019) Conditional draw control system in block-cave production scheduling using mathematical programming. Internat. J. Mining Reclamation Environ. 33(4):223–246.Google Scholar
  • Nezhadshahmohammad F, Pourrahimian Y, Aghababaei H (2018) Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling. Internat. J. Mining Sci. Tech. 28(6):941–950.Google Scholar
  • Nicholas DE (1981) Method selection—A numerical approach. Stewart D, ed. Design and Operation of Caving and Sublevel Stoping Mines (American Institute of Mining, Metallurgical, and Petroleum Engineers, New York), 39–53.Google Scholar
  • Nieto A (2011) Key deposit indicators (KDI) and key mining method indicators (KMI) in underground mining method selection. Trans. Soc. Mining Metallurgy Exploration 328(June):381–396.Google Scholar
  • Nikbin V, Ataee-pour M, Shahriar K, Pourrahimian Y (2020) A 3D approximate hybrid algorithm for stope boundary optimization. Comput. Oper. Res. 115(March):104475.Google Scholar
  • Noriega R, Pourrahimian Y, Victor W (2018) Optimisation of the undercut level elevation in block caving mines using a mathematical programming framework. Potvin Y, Jakubec J, eds. Proc. 4th Internat. Sympos. Block Sublevel Caving (Australian Centre for Geomechanics, Crawley, WA, Australia), 363–372.Google Scholar
  • Okubo S, Yamatomi J (2009) Underground mining methods and equipment. Horikawa K, Guo Q, eds. Civil Engineering, vol. II (Encyclopedia of Life Support Systems/UNESCO, Paris), 171–193.Google Scholar
  • Olivares EAB (2019) Stochastic optimization applied to scheduling mining problems. PhD thesis, Universidad de Chile, Santiago.Google Scholar
  • Opoku S, Musingwini C (2013) Stochastic modelling of the open pit to underground transition interface for gold mines. Internat. J. Mining Reclamation Environ. 27(6):407–424.Google Scholar
  • O’Sullivan D, Newman A (2014) Extraction and backfill scheduling in a complex underground mine. Interfaces 44(2):204–221.LinkGoogle Scholar
  • O’Sullivan D, Newman A (2015) Optimization-based heuristics for underground mine scheduling. Eur. J. Oper. Res. 241(1):248–259.Google Scholar
  • O’Sullivan D, Brickey AJ, Newman AM (2015) Is openpit production scheduling “easier” than its underground counterpart? Mining Engrg. 67(4):68–73.Google Scholar
  • Ozfirat PM, Ozfirat MK, Malli T, Kahraman B (2015) Integration of fuzzy analytic hierarchy process and multi-objective fuzzy goal programming for selection problems: An application on roadheader selection. J. Intelligent Fuzzy Systems 29(1):53–62.Google Scholar
  • Park S, Choi Y, Park Hs S (2016) Optimization of truck-loader haulage systems in an underground mine using simulation methods. Geosystem Engrg. 19(5):222–231.Google Scholar
  • Peng S, Vayenas N (2014) Maintainability analysis of underground mining equipment using genetic algorithms: Case studies with an LHD vehicle. J. Mining 2014:1–10.Google Scholar
  • Pérez J, Morales N, Widzyk-capehart E, Rojas V, Vallejos J (2017) Short and medium term mine planning in selective underground mining considering equipment performance. Ghodrati B, Kumar U, Schunnesson H, eds. 26th Internat. Sympos. Mine Planning Equipment Selection (Luleå University of Technology, Luleå, Sweden), 281–286.Google Scholar
  • Peskens T (2013) Underground mining method selection and preliminary techno-economic mine design for the Wombat orebody, Kylylahti deposit, Finland. PhD thesis, Delft University of Technology, Delft, Netherlands.Google Scholar
  • Pourrahimian Y, Askari Nasab H, Tannant DD (2013) A multi-step approach for block-cave production scheduling optimization. Internat. J. Mining Sci. Tech. 23(5):739–750.Google Scholar
  • Rafiee R, Ataei M, KhalooKakaie R, Jalali SE, Sereshki F, Noroozi M (2018) Numerical modeling of influence parameters in cavabililty of rock mass in block caving mines. Internat. J. Rock Mech. Mining Sci. 105(May):22–27.Google Scholar
  • Rendu JM (2014) An Introduction to Cut-off Grade Estimation (Society for Mining, Metallurgy & Exploration, Englewood, CO).Google Scholar
  • Reus L, Belbèze M, Feddersen H, Rubio E (2018) Extraction planning under capacity uncertainty at the Chuquicamata underground mine. Interfaces 48(6):543–555.LinkGoogle Scholar
  • Rivera O, Goycoolea M, Moreno E, Espinoza D (2015) The open mine planner guide. Technical report, Universidad Adolfo Ibáñez.Google Scholar
  • Roberts B, Bloss M (2014) Adaptation of an open pit optimiser for underground strategic planning. Dimitrakopoulos R, ed. Proc. Orebody Model. Strategic Mine Planning Sympos. 2014 (Australasian Institute of Mining and Metallurgy, Carlton, VIC, Australia), 249–256.Google Scholar
  • Rocher W, Rubio E, Morales N (2011) Eight-dimensional planning—Construction of an integrated model for mine planning involving constructability. Baafi EY, Kininmonth RJ, Porter I, eds. 35th APCOM Sympos. Appl. Comput. Oper. Res. Minerals Indust. (Australasian Institute of Mining and Metallurgy, Carlton, VIC, Australia), 393–406.Google Scholar
  • Rubio E, Diering T (2004) Block cave production planning using operations research tools. Karzulovic A, Alvaro M, eds. Proc. MassMin 2004 (Instituto de Ingenieros de Chile, Santiago), 141–149.Google Scholar
  • Salama A, Greberg J, Schunnesson H (2014a) The use of discrete event simulation for underground haulage mining equipment selection. Internat. J. Mining Mineral Engrg. 5(3):256–271.Google Scholar
  • Salama A, Nehring M, Greberg J (2014b) Operating value optimisation using simulation and mixed integer programming. Internat. J. Mining Reclamation Environ. 28(1):25–46.Google Scholar
  • Sandanayake DSS, Topal E, Asad MWA (2015) Designing an optimal stope layout for underground mining based on a heuristic algorithm. Internat. J. Mining Sci. Tech. 25(5):767–772.Google Scholar
  • Sandvik (2019) Sandvik Mining and Rock Technology—Mining equipment. Accesed October 20, 2019, https://www.rocktechnology.sandvik.Google Scholar
  • Sandvik (2020) Du421 articulated in-the-hole production drill rig. Accessed February 8, 2020, https://www.rocktechnology.sandvik/en/products/underground-drill-rigs-and-bolters/in-the-hole-longhole-drills/du421-articulated-in-the-hole-production-drill-rig/.Google Scholar
  • Sebutsoe T (2017) Characterizing a mining production system for decision-making purposes in a platinum mine. J. Southern African Inst. Mining Metallurgy 117(2):199–206.Google Scholar
  • Sharma V (2015) Longterm schedule optimization of an underground mine under geotechnical and ventilation constraints using SOT. Master’s thesis, Laurentian University, Sudbury, ON, Canada.Google Scholar
  • Shekhar G, Gustafson A, Hersinger A, Jonsson K, Schunnesson H (2019) Development of a model for economic control of loading in sublevel caving mines. Mining Tech. 128(2):118–128.Google Scholar
  • Sipeki L, Newman AM, Yano CA (2020) Selecting support pillars in underground mines with ore veins. IISE Trans. 52(10):1173–1188.Google Scholar
  • Sirinanda KG, Brazil M, Grossman PA, Rubinstein JH, Thomas DA (2014) Strategic underground mine access design to maximise the net present value. Dimitrakopoulos R, ed. Advances in Applied Strategic Mine Planning (Springer, Cham, Switzerland), 607–624.Google Scholar
  • Sirinanda KG, Brazil M, Grossman PA, Rubinstein JH, Thomas DA (2016) Gradient-constrained discounted Steiner trees II: Optimally locating a discounted Steiner point. J. Global Optim. 64(3):515–532.Google Scholar
  • Song Z, Rinne M, van Wageningen A (2013) A review of real-time optimization in underground mining production. J. Southern African Inst. Mining Metallurgy 113(12):889–897.Google Scholar
  • Song Z, Schunnesson H, Rinne M, Sturgul J (2015a) An approach to realizing process control for underground mining operations of mobile machines. PLoS ONE 10(6):e0129572.Google Scholar
  • Song Z, Schunnesson H, Rinne M, Sturgul J (2015b) Intelligent scheduling for underground mobile mining equipment. PLoS ONE 10(6):e131003.Google Scholar
  • Sparshott J, Walls M (2009) Copper miners go underground. Wall Street J. (December 14), https://www.wsj.com/articles/SB10001424052748704201404574589941445376718.Google Scholar
  • Sprague M (1953) Money Mountain: The Story of Cripple Creek Gold (CreateSpace Independent Publishing Platform, Boston).Google Scholar
  • Terblanche S, Bley A (2015) An improved formulation of the underground mine scheduling optimisation problem when considering selective mining. ORiON 31(1):1–16.Google Scholar
  • Topal E, Sens J (2010) A new algorithm for stope boundary optimization. J. Coal Sci. Engrg. (China) 16(2):113–119.Google Scholar
  • Ugarte E, Pourrahimian Y, Boisvert J (2017) Determination of optimum drawpoint layout in block caving using sequential Gaussian simulation. Hudyma M, Potvin Y, eds. Proc. 1st Internat. Conf. Underground Mining Tech. (Australian Centre for Geomechanics, Crawley, WA, Australia), 339–349.Google Scholar
  • U.S. Geological Survey (2019) How many pounds of minerals are required by the average person in a year? Accessed January 16, 2020, https://www.usgs.gov/faqs/how-many-pounds-minerals-are-required-average-person-a-year?qt-news_science_products=0#qt-news_science_products.Google Scholar
  • Wang X, Gu X, Liu Z, Wang Q, Xu X, Zheng M (2018) Production process optimization of metal mines considering economic benefit and resource efficiency using an NSGA-II model. Processes 6(11):Article 228.Google Scholar
  • Watson G (2009) An integrated procedural approach that increases value to underground mine planning. Project Evaluation Conf. 2009 (Australasian Institute of Mining and Metallurgy, Carlton South, VIC, Australia), 179–185.Google Scholar
  • Whittle D, Brazil M, Grossman P, Rubinstein J, Thomas D (2018) Combined optimisation of an open-pit mine outline and the transition depth to underground mining. Eur. J. Oper. Res. 268(2):624–634.Google Scholar
  • Yavuz M (2009) Underground mining method selection by using multiple attribute decision making methods. SME Annual Meeting Exhibit CMA’s 111th Natl. Western Mining Conf. 2009, vol. 2 (Society for Mining, Metallurgy & Exploration, Englewood, CO), 797–800.Google Scholar
  • Zarate EU, Pourrahimian Y, Boisvert J (2018) Optimizing block caving drawpoints over multiple geostatistical models. Internat. J. Mining Reclamation Environ. 34(1):55–74.Google Scholar
  • Zuo H, Luo Z, Guan J, Wang Y (2013) Multidisciplinary design optimization on production scale of underground metal mine. J. Central South Univ. 20(5):1332–1340.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.