A Decision Support System for Brewery Production Planning at Feldschlösschen

Published Online:https://doi.org/10.1287/inte.2021.1101

References

  • Baldo TA, Morabito R, Santos MO, Guimarães L (2017) Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: Analyzing two different situations. Math. Problems Engrg. 2017:6754970.Google Scholar
  • Baldo TA, Santos MO, Almada-Lobo B, Morabito R (2014) An optimization approach for the lot sizing and scheduling problem in the brewery industry. Comput. Indust. Engrg. 72:58–71.Google Scholar
  • Billington PJ, McClain JO, Thomas LJ (1983) Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction. Management Sci. 29(10):1126–1141.LinkGoogle Scholar
  • Briskorn D, Zeise P (2019) A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand. OR Spectrum 41(4):895–942.Google Scholar
  • Ferreira D, Morabito R, Rangel S (2009) Solution approaches for the soft drink integrated production lot sizing and scheduling problem. Eur. J. Oper. Res. 196(2):697–706.Google Scholar
  • Ferreira D, Morabito R, Rangel S (2010) Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants. Comput. Oper. Res. 37(4):684–691.Google Scholar
  • Ferreira D, Clark AR, Almada-Lobo B, Morabito R (2012) Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. Internat. J. Production Econom. 136(2):255–265.Google Scholar
  • Förster A, Haase K, Tönnies M (2006) Ein modellgestützter Ansatz zur mittelfristigen Produktions- und Ablaufplanung für eine Brauerei. J. Bus. Econom. 76(12):1255–1274.Google Scholar
  • Georgiadis GP, Elekidis AP, Georgiadis MC (2021) Optimal production planning and scheduling in breweries. Food Bioproducts Processing 125:204–221.Google Scholar
  • Helber S, Sahling F (2010) A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Internat. J. Production Econom. 123(2):247–256.Google Scholar
  • Sáenz-Alanís CA, Jobish VD, Salazar-Aguilar MA, Boyer V (2016) A parallel machine batch scheduling problem in a brewing company. Internat. J. Advanced Manufacturing Tech. 87(1–4):65–75.Google Scholar
  • Stadtler H (2003) Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows. Oper. Res. 51(3):487–502.LinkGoogle Scholar
  • Stadtler H, Sahling F (2013) A lot-sizing and scheduling model for multi-stage flow lines with zero lead times. Eur. J. Oper. Res. 225(3):404–419.Google Scholar
  • Statista (2020) Brauwirtschaft in der Schweiz, https://de.statista.com/statistik/studie/id/28961/dokument/brauwirtschaft-in-der-schweiz-statista-dossier/.Google Scholar
  • Toledo C, França P, Morabito R, Kimms A (2009)555 Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem. Internat. J. Production Res. 47(11):3097–3119.Google Scholar
  • Toledo CFM, Kimms A, França PM, Morabito R (2006) A mathematical model for the synchronized and integrated two-level lot sizing and scheduling problem. Working paper.Google Scholar
  • Toledo CFM, de Oliveira L, de Freitas Pereira R, França PM, Morabito R (2014) A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem. Comput. Oper. Res. 48:40–52.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.