A Decision Support System for Brewery Production Planning at Feldschlösschen
References
- (2017) Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: Analyzing two different situations. Math. Problems Engrg. 2017:6754970.Google Scholar
- (2014) An optimization approach for the lot sizing and scheduling problem in the brewery industry. Comput. Indust. Engrg. 72:58–71.Google Scholar
- (1983) Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction. Management Sci. 29(10):1126–1141.Link, Google Scholar
- (2019) A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand. OR Spectrum 41(4):895–942.Google Scholar
- (2009) Solution approaches for the soft drink integrated production lot sizing and scheduling problem. Eur. J. Oper. Res. 196(2):697–706.Google Scholar
- (2010) Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants. Comput. Oper. Res. 37(4):684–691.Google Scholar
- (2012) Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. Internat. J. Production Econom. 136(2):255–265.Google Scholar
- (2006) Ein modellgestützter Ansatz zur mittelfristigen Produktions- und Ablaufplanung für eine Brauerei. J. Bus. Econom. 76(12):1255–1274.Google Scholar
- (2021) Optimal production planning and scheduling in breweries. Food Bioproducts Processing 125:204–221.Google Scholar
- (2010) A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Internat. J. Production Econom. 123(2):247–256.Google Scholar
- (2016) A parallel machine batch scheduling problem in a brewing company. Internat. J. Advanced Manufacturing Tech. 87(1–4):65–75.Google Scholar
- (2003) Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows. Oper. Res. 51(3):487–502.Link, Google Scholar
- (2013) A lot-sizing and scheduling model for multi-stage flow lines with zero lead times. Eur. J. Oper. Res. 225(3):404–419.Google Scholar
- Statista (2020) Brauwirtschaft in der Schweiz, https://de.statista.com/statistik/studie/id/28961/dokument/brauwirtschaft-in-der-schweiz-statista-dossier/.Google Scholar
- (2009)555 Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem. Internat. J. Production Res. 47(11):3097–3119.Google Scholar
- (2006) A mathematical model for the synchronized and integrated two-level lot sizing and scheduling problem. Working paper.Google Scholar
- (2014) A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem. Comput. Oper. Res. 48:40–52.Google Scholar

