Practice Summary: General Electric Company Optimizes Wind Turbine Towers Sourcing and Logistics Operations
Published Online:15 Nov 2023https://doi.org/10.1287/inte.2022.0058
References
- (2014) Analysis of transportation and logistics challenges affecting the deployment of larger wind turbines: Summary of results. Technical Report: NREL/TP-5000-61063, National Renewable Energy Laboratory, Golden, CO.Google Scholar
- (2012) A strategic empty container logistics optimization in a major shipping company. Interfaces 42(1):5–16.Link, Google Scholar
- (2020) Vattenfall optimizes off-shore wind farm design. INFORMS J. Appl. Analytics 50(1):80–94.Link, Google Scholar
- (2020) Optimizing the layout of onshore wind farms to minimize noise. Appl. Energy 267:114896.Google Scholar

