A Hard-Rock Mining Company Optimizes Schedules for Strategic Decision Making

Published Online:https://doi.org/10.1287/inte.2025.0200

References

  • Abzalov M (2016) Mining methods. Dilek Y, Pirajno F, Windley B, eds. Applied Mining Geology (Springer, Cham, Switzerland), 5–18.Google Scholar
  • Askari-Nasab H, Pourrahimian Y, Ben-Awuah E, Kalantari S (2011) Mixed integer linear programming formulations for open pit production scheduling. J. Mining Sci. 47(3):338–359.Google Scholar
  • Bienstock D, Zuckerberg M (2010) Solving LP relaxations of large-scale precedence constrained problems. Eisenbrand F, Shepherd FB, eds. Integer Programming and Combinatorial Optimization, Lecture Notes in Computer Science, vol. 6080 (Springer, Berlin, Heidelberg), 1–14.Google Scholar
  • Boland N, Dumitrescu I, Froyland G, Gleixner AM (2009) LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity. Comput. Oper. Res. 36(4):1064–1089.Google Scholar
  • Brady BHG, Brown ET (2006) Longwall and caving mining methods. Rock Mechanics for Underground Mining, 3rd ed. (Springer, Dordrecht, Netherlands), 430–483.Google Scholar
  • Brazil M, Grossman P, Rubinstein JH, Thomas D (2014) Improving underground mine access layouts using software tools. Interfaces 44(2):195–203.LinkGoogle Scholar
  • Brickey A, Chowdu A, Newman A, Goycoolea M, Godard R (2021) Barrick’s Turquoise Ridge gold mine optimizes underground production scheduling operations. INFORMS J. Appl. Anal. 51(2):106–118.LinkGoogle Scholar
  • Bucy M, Finlayson A, Kelly G, Moye C (2016) The ‘how’ of transformation. Accessed November 1, 2024, https://www.mckinsey.com/industries/retail/our-insights/the-how-of-transformation.Google Scholar
  • Caccetta L, Hill SP (2003) An application of branch and cut to open pit mine scheduling. J. Global Optim. 27(2):349–365.Google Scholar
  • Carlyle WM, Eaves BC (2001) Underground planning at Stillwater Mining Company. Interfaces 31(4):50–60.LinkGoogle Scholar
  • Chicoisne R, Espinoza D, Goycoolea M, Moreno E, Rubio E (2012) A new algorithm for the open-pit mine production scheduling problem. Oper. Res. 60(3):517–528.LinkGoogle Scholar
  • Chowdu A, Goycoolea M, Brickey A (2019) Mine schedule optimization and mine operational realities: Bridging the gap. Mueller C, Assibey-Bonsu W, Baafi E, Dauber C, Doran C, Jaszczuk M, Nagovitsyn O, eds. Mining Goes Digital: Proceedings of the 39th International Symposium ‘Application of Computers and Operations Research in the Mineral Industry’ (APCOM 2019) (CRC Press, Boca Raton, FL), 412–418.Google Scholar
  • Chowdu A, Nesbitt P, Brickey A, Newman AM (2022) Operations research in underground mine planning: A review. INFORMS J. Appl. Anal. 52(2):109–132.LinkGoogle Scholar
  • Dagdelen K (1985) Optimum multi period open pit mine production scheduling. PhD dissertation, Colorado School of Mines, Golden, CO.Google Scholar
  • Darling P (2011) SME Mining Engineering Handbook, vol. 1 (Society for Mining, Metallurgy & Exploration, Englewood, CO).Google Scholar
  • Fava L, Millar D, Maybee B (2011) Scenario evaluation through mine schedule optimisation. Proc. 2nd Internat. Seminar Mine Planning (Gecamin, Santiago, Chile), 1–10.Google Scholar
  • Goycoolea M, Lamas P, Pagnoncelli BK, Piazza A (2021) Lane’s algorithm revisited. Management Sci. 67(5):3087–3103.LinkGoogle Scholar
  • Hirwa J, Zolan A, Becker W, Flamand T, Newman A (2023) Optimizing design and dispatch of a resilient renewable energy microgrid for a South African hospital. Appl. Energy 348:121438.Google Scholar
  • Huang S, Li G, Ben-Awuah E, Afum BO, Hu N (2020) A robust mixed integer linear programming framework for underground cut-and-fill mining production scheduling. Internat. J. Mining Reclamation Environment 34(6):397–414.Google Scholar
  • Jélvez E, Morales N, Nancel-Penard P, Peypouquet J, Reyes P (2016) Aggregation heuristic for the open-pit block scheduling problem. Eur. J. Oper. Res. 249(3):1169–1177.Google Scholar
  • Johnson TB (1968) Optimum open pit mine production scheduling. PhD dissertation, University of California, Berkeley.Google Scholar
  • King B, Newman A (2018) Optimizing the cutoff grade for an operational underground mine. Interfaces 48(4):357–371.LinkGoogle Scholar
  • Kuchta M, Newman A, Topal E (2004) Implementing a production schedule at LKAB’s Kiruna Mine. Interfaces 34(2):124–134.LinkGoogle Scholar
  • Lambert WB, Newman AM (2014) Tailored Lagrangian Relaxation for the open pit block sequencing problem. Ann. Oper. Res. 222(1):419–438.Google Scholar
  • Lambert WB, Brickey A, Newman AM, Eurek K (2014) Open-pit block-sequencing formulations: A tutorial. Interfaces 44(2):127–142.LinkGoogle Scholar
  • Lerchs H, Grossmann IF (1965) Optimum design of open-pit mines. CIM Bull. 58:47–54.Google Scholar
  • Little J, Topal E, Knights P (2011) Simultaneous optimisation of stope layouts and long term production schedules. Mining Tech. 120(3):129–136.Google Scholar
  • Martinez MA, Newman AM (2011) A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna Mine. Eur. J. Oper. Res. 211(1):184–197.Google Scholar
  • Maybee B, Fava L (2011) Risk-based evaluation for underground mine planning. Proc. 2nd Internat. Seminar Mine Planning (Gecamin, Santiago, Chile).Google Scholar
  • Muñoz G, Espinoza D, Goycoolea M, Moreno E, Queyranne M, Letelier OR (2018) A study of the Bienstock–Zuckerberg algorithm: Applications in mining and resource constrained project scheduling. Comput. Optim. Appl. 69(2):501–534.Google Scholar
  • Musingwini C (2016) Optimization in underground mine planning—Developments and opportunities. J. Southern Africa Inst. Mining Metallurgy 116(9):809–820.Google Scholar
  • Nesbitt P, Blake LR, Lamas P, Goycoolea M, Pagnoncelli BK, Newman A, Brickey A (2021) Underground mine scheduling under uncertainty. Eur. J. Oper. Res. 294(1):340–352.Google Scholar
  • Newman AM, Rubio E, Caro R, Weintraub A, Eurek K (2010) A review of operations research in mine planning. Interfaces 40(3):222–245.LinkGoogle Scholar
  • Ogunmodede O, Lamas P, Brickey A, Bogin G, Newman A (2022) Underground production scheduling with ventilation and refrigeration considerations. Optim. Engrg. 23(3):1677–1705.Google Scholar
  • O’Sullivan D, Newman A (2014) Extraction and backfill scheduling in a complex underground mine. Interfaces 44(2):204–221.LinkGoogle Scholar
  • O’Sullivan D, Brickey A, Newman A (2015) Is openpit production scheduling “easier” than its underground counterpart? Mining Engrg. 67(4):68–73.Google Scholar
  • Ramazan S (2007) The new Fundamental Tree Algorithm for production scheduling of open pit mines. Eur. J. Oper. Res. 177(2):1153–1166.Google Scholar
  • Salman S, Muhammad K, Khan A, Glass HJ (2021) A block aggregation method for short-term planning of open pit mining with multiple processing destinations. Minerals 11(3):288.Google Scholar
  • Sarin SC, West-Hansen J (2005) The long-term mine production scheduling problem. IIE Trans. 37(2):109–121.Google Scholar
  • Smith ML, Wicks SJ (2014) Medium-term production scheduling of the Lumwana mining complex. Interfaces 44(2):176–194.LinkGoogle Scholar
  • Song Z, Rinne M, van Wageningen A (2013) A review of real-time optimization in underground mining production. J. Southern Africa Inst. Mining Metallurgy 113(12):889–897.Google Scholar
  • Topal E (2008) Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling. J. Southern Africa Inst. Mining Metallurgy 108(2):99–107.Google Scholar
  • Wang X, Gu X, Liu Z, Wang Q, Xu X, Zheng M (2018) Production process optimization of metal mines considering economic benefit and resource efficiency using an NSGA-II model. Processes 6(11):228.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.