An Integrated Labor-Management System for Taco Bell

Published Online:https://doi.org/10.1287/inte.28.1.75

References

  • Everett H. Generalized Lagrangean multiplier method for solving problems of optimum allocation of resources. Operations Research (1963) 11 3 399 417 LinkGoogle Scholar
  • Ford L. R. , Fulkerson D. R. Flows in Networks (1962) (Princeton University Press, Princeton, New Jersey) CrossrefGoogle Scholar
  • Godward M. , Swart W. , Tew Jeffrey D. , Manivannan S. , Sadowski Deborah A. , Seila Andrew F. An object oriented simulation model for determining labor requirements at Taco Bell. Proceedings of the 1994 Winter Simulation Conference (1994) Google Scholar
  • Loucks J. S. , Jacobs F. R. Tour scheduling and task assignment of a heterogeneous work force. Decision Sciences (1991) 22 4 719 738 CrossrefGoogle Scholar
  • Makridakis S. , Wheelwright S. Interactive Forecasting (1978) (Holden-Day, Inc., San Francisco, California) Google Scholar
  • Mishra D. , Salvendy G. Computerized work measurement. Handbook of Industrial Engineering (1982) (John Wiley and Sons, New York) Google Scholar
  • Solomon S. L. Simulation of Waiting Line Systems (1982) (Prentice Hall, Inc., Englewood Cliffs, New Jersey) Google Scholar
  • Swart W. , Donno L. Simulation modeling improves operations, planning, and productivity of fast food restaurants. Interfaces (1981) 11 6 35 47 LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.