Use of OR Systems in the Chilean Forest Industries
Published Online:1 Feb 1999https://doi.org/10.1287/inte.29.1.7
References
- A problem of forest harvesting and road building. (1998) . Working paperGoogle Scholar
- A dual-ascent procedure for largescale uncapacitated network design. Oper. Res. (1989) 37(5):716–740Link, Google Scholar
- Planning and control of short-term log allocation in New Zealand. Integrated Decision-Making in Planning and Control of Forest Oper, Proc. IUFRO Conf.(School of Forestry, University of Canterbury, Christchurch, New Zealand) 46–56Google Scholar
- A system for short term harvesting. Eur. J. Oper. Res. (1992) . ForthcomingGoogle Scholar
- Simultaneous planning and wildland transportation alternatives. TIMS Studies in the Management Sciences (1986) 21(Elsevier Science Publishers, New York) 371–387Google Scholar
- Preliminary logging analysis system (PLANS): Overview. (1987) . Technical report, USDA Forest Service, PNW-199, Portland, OregonGoogle Scholar
- New issues in forest land management from an operations research perspective. Interfaces (1996) 26(5):9–25Link, Google Scholar
- A truck scheduling system improves efficiency in the forest industries. Interfaces (1996) 26(4):1–12Link, Google Scholar
- A heuristic system to solve mixed-integer forest planning models. Oper. Res. (1994) 42(6):1010–1024Link, Google Scholar

