Resource Allocation Capabilities of Commercial Project Management Software Packages
Published Online:1 Aug 1999https://doi.org/10.1287/inte.29.4.19
References
- Orthogonal main-effect plans for asymmetrical factorial experiments. Technometrics (1962) 4(1):21–58Crossref, Google Scholar
- Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. Advances in Project Scheduling (1989) (Elsevier, Amsterdam) 113–134Google Scholar
- Project management using a microcomputer. Comput. Oper. Res. (1986) 13(2/3):231–260Crossref, Google Scholar
- Scheduling subject to resource constraints: Classification and complexity. Discrete Appl. Math. (1983) 5(1):11–24Crossref, Google Scholar
- Resource levelling with project management software. (1995) . Paper presented at the INFORMS International Meeting, Singapore, 1995Google Scholar
- A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Sci. (1975) 21(8):944–955Link, Google Scholar
- Resource constrained project crashing. OMEGA (1989) 17(1):69–79Crossref, Google Scholar
- A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Sci. (1992) 38(12):1803–1818Link, Google Scholar
- An evaluation of microcomputer-based software packages for project management. Eur. J. Oper. Res. (1990) 49(1):102–139Crossref, Google Scholar
- Activity Networks: Project Planning and Control by Network Models (1977) (John Wiley and Sons, New York) Google Scholar
- Comparative analysis of resource-allocation capabilities of project management software packages. Project Management J. (1996) 24(2):35–44Google Scholar
- Resource constrained scheduling capabilities of commercial project management software. Project Management J. (1992) 22(4):39–43Google Scholar
- Projektmanagementsysteme im Vergleich. c't Magazin für Computertechnik (1997) 7):178–189Google Scholar
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. Eur. J. Oper. Res. (1996a) 90(2):320–333Crossref, Google Scholar
- Efficient priority rules for the resource-constrained project scheduling problem. J. Oper. Management (1996b) 14(3):179–192Crossref, Google Scholar
- Auswahl von Standardsoftware, dargestellt am Beispiel von Programmen für das Projektmanagement. Wirtschaftsinformatik (1996) 38(4):399–410Google Scholar
- Characterization and generation of a general class of resource-constrained project scheduling problems. Management Sci. (1995) 41(10):1693–1703Link, Google Scholar
- An iterative scheduling technique for resource-constrained project scheduling. Eur. J. Oper. Res. (1992) 56(2):370–379Crossref, Google Scholar
- Project management software: Capabilities and efficiency in resource constrained scheduling. (1994) . Paper presented at the 4th International Workshop on Project Management and Scheduling, Leuven, BelgiumGoogle Scholar
- Project management: An evaluation of software quality. Internat. Trans. Oper. Res. (1994) 1(2):209–221Crossref, Google Scholar
- Professional software for resource constrained scheduling: Heuristic and exact methods. (1996) . Paper presented at the 5th International Workshop on Project Management and Scheduling, Poznan, PolandGoogle Scholar
- Project Management—A Managerial Approach (1995) 3rd ed.(John Wiley and Sons, New York) Google Scholar
- The SPSS Guide to Data Analysis (1990) (SPSS Inc., Chicago, Illinois) Google Scholar
- A survey on the resource-constrained project scheduling problem. IIE Trans. (1995) 27(5):574–586Crossref, Google Scholar
- A survey of scheduling rules. Oper. Res. (1977) 25(1):45–61Link, Google Scholar
- A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Sci. (1984) 30(7):854–867Link, Google Scholar
- Project management on the PC: Software, applications, and trends. Interfaces (1983) 18(2):75–84Link, Google Scholar

