Dynamic Workforce Scheduling for British Telecommunications plc
Published Online:1 Feb 2000https://doi.org/10.1287/inte.30.1.45.11615
References
- Stochastic techniques for resource management. Stochastic techniques for resource management (1995) 13(1):55–63Google Scholar
- Work Manager. Work Manager (1997) 15(1):58–68Google Scholar
- Tractable constraints on ordered domains. Tractable constraints on ordered domains (1995) 79(2):327–339Google Scholar
- Optimisation by simulated annealing. Optimisation by simulated annealing (1983) 220(4598):671–680Google Scholar
- Work allocation challenges and solutions in a large-scale work management environment. Work allocation challenges and solutions in a large-scale work management environment (1995) 13(1):46–54Google Scholar
- Routing problems: A bibliography. Annals of Operations Research (1995) 61:227–262Crossref, Google Scholar
- Engineering Dynamic Scheduler for Work Manager. Engineering Dynamic Scheduler for Work Manager (1998) 16(3):16–29Google Scholar
- Experience in applying OR techniques to the solution of practical resource management problems. Experience in applying OR techniques to the solution of practical resource management problems (1995) 13(1):38–45Google Scholar
- Foundations of Constraint Satisfaction (1993) (Academic Press, London and San Diego) Google Scholar

