Spicer Off-Highway Products Division-Brugge Improves its Lead-Time and Scheduling Performance
Published Online:1 Feb 2000https://doi.org/10.1287/inte.30.1.83.11613
References
- The shifting bottleneck procedure for job shop scheduling. Management Science (1988) 34 3 391 401 Link, Google Scholar
- Factory Physics, Foundations of Manufacturing Management (1996) (Richard D. Irwin, Homewood, Illinois) Google Scholar
- Extending the shifting bottleneck procedure to real-life applications. European Journal of Operational Research (1996) 90 2 252 268 Crossref, Google Scholar
- An integrated shifting bottleneck procedure for scheduling. (1997) . PhD thesis draft, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium Google Scholar
- A lot sizing model with queueing delays: The issue of safety time. European Journal of Operations Research (1996) 89 2 269 276Crossref, Google Scholar
- ACLIPS: A capacity and lead time integrated procedure for scheduling. Management Science (1998) 44 11 1548 1561Link, Google Scholar
- A general approximation for the single product lot sizing model with queueing delays. European Journal of Operations Research (1996) 95 1 73 88 Crossref, Google Scholar
- . Personal interview. (1997) Google Scholar
- The impact of lot sizing on queueing delays: Multi product, multi machine models. (1996) . PhD thesis, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium Google Scholar

