Product Recovery at the Norwegian National Insurance Administration

References

  • Axsäter S. Simple solution procedures for a class of two-echelon inventory problems. Operations Research (1990) 38 1 64 69 LinkGoogle Scholar
  • Axsäter S. Exact and approximate evaluation of batch-ordering policies for two-level inventory systems. Operations Research (1993) 41 4 777 785 LinkGoogle Scholar
  • Cohen M. A. , Zheng Y.-S. , Wang Y. Identifying opportunities for improving Teradyne's service-parts logistics system. Interfaces (1999) . forthcoming LinkGoogle Scholar
  • Demmy W. S. , Presutti V.J. , Schwarz L.B. Multi-echelon inventory theory in the Air Force logistics command in. Multi-Level Production/Inventory Control Systems: Theory and Practice (1981) 16 (North Holland Publishing Company, Amsterdam) 279 297 Google Scholar
  • Diks E. B. , de Kok A. G. , Lagodimos A. G. Multi-echelon systems: A service measure perspective. European Journal of Operational Research (1996) 95 2 241 263 CrossrefGoogle Scholar
  • Ferrer G. Parts recovery problem: The value of information in remanufacturing. (1995) . Working paper, Technology Management Area, INSEAD, France Google Scholar
  • Fleischmann M. , Bloemhof-Ruwaard J.M., Dekker R. , van der Laan E. , van Nunen J. A. E. E. , Van Wassenhove L. N. Quantitative models for reverse logistics: A review. European Journal of Operational Research (1997) 103 1 1 17 CrossrefGoogle Scholar
  • Graves S. C. A multi-echelon inventory model for a reparable item with one-for-one replenishment. Management Science (1985) 31 10 1247 1256 LinkGoogle Scholar
  • Guide V. D. R. , Spencer M. S. Rough-cut capacity planning for remanufacturing firms. Production Planning and Control (1997) 8 3 237 244 CrossrefGoogle Scholar
  • Gustafson H. W. Combat support command, control, and communications (CSC3): Robust methods to mitigate communications disruptions. (1991) (RAND, Santa Monica, California) . R-3942-AF Google Scholar
  • Hausman W. H. , Scudder G. D. Priority scheduling rules for repairable inventory systems. Management Science (1982) 28 11 1215 1232 LinkGoogle Scholar
  • Heyman D. P. Optimal disposal policies for a single-item inventory system with returns. Naval Research Logistics (1977) 24 3 385 405 CrossrefGoogle Scholar
  • Inderfurth K. Modeling periodic review control for a stochastic product recovery problem with remanufacturing and procurement leadtimes. (1996) . Working paper, Faculty of Economics and Management, University of Magdeburg, Germany Google Scholar
  • Inderfurth K. Simple optimal replenishment and disposal policies for a product recovery system with lead times. OR Spektrum (1997) 19 2 111 122 CrossrefGoogle Scholar
  • Mabini M. C. , Gelders L. F. Repairable item inventory systems: A literature review. Belgian Journal of Operations Research, Statistics and Computer Science (1990) 30 4 57 69 Google Scholar
  • Muckstadt J. A. A model for a multi-item, multi-echelon, multi-indenture inventory system. Management Science (1973) 20 4 472 481 LinkGoogle Scholar
  • Muckstadt J. A. , Isaac M. H. An analysis of single item inventory systems with returns. Naval Research Logistics (1981) 28 2 237 254 CrossrefGoogle Scholar
  • Nahmias S. , Schwarz L. B. Managing repairable item inventory systems: A review in. Multi-Level Production/Inventory Control Systems: Theory and Practice (1981) 16 (North Holland Publishing Company, Amsterdam) 253 277 Google Scholar
  • Parliament Proposition No. 1 Stortingsproposisjon nr. 1 for budsjetterminen 1999 Folketrygden. (1998) . pkt 4.3.3 Google Scholar
  • Penev K. D. , de Ron A. J. Determination of a disassembly strategy. International Journal of Production Research (1996) 34 2 495 506 CrossrefGoogle Scholar
  • Pyke D. F. Priority repair and dispatch policies for reparable item logistics systems. Naval Research Logistics (1990) 37 1 1 30 CrossrefGoogle Scholar
  • Pyles R. A. The Dyna-METRIC readiness assessment model: Motivation, capabilities, and use. (1984) (RAND, Santa Monica, California) . R-2886-AF Google Scholar
  • Richter K. The EOQ repair and waste disposal model with variable setup numbers. European Journal of Operational Research (1996) 95 2 313 324 CrossrefGoogle Scholar
  • Salomon M. , van der Laan E. , Dekker R. , Thierry M. , Ridder A. Product remanufacturing and its effects on production and inventory control. (1994) . Working paper, Erasmus University, Rotterdam, The Netherlands Google Scholar
  • Sherbrooke C. C. METRIC - A multi-echelon technique for recoverable item control. Operations Research (1968) 16 1 103 121 LinkGoogle Scholar
  • Sherbrooke C. C. Optimal Inventory Modeling of Systems, Multi-Echelon Techniques (1992) (John Wiley and Sons, New York) Google Scholar
  • Silver E. A. , Pyke D. F. , Peterson R. Inventory Management and Production Planning and Scheduling (1998) third edition (John Wiley and Sons, New York) Google Scholar
  • Svoronos A. , Zipkin P. Estimating the performance of multi-level inventory systems. Operations Research (1988) 36 1 57 72 LinkGoogle Scholar
  • Taleb K. N. , Gupta S. M. , Brennan L. Disassembly of complex product structures with parts and materials commonality. Production Planning and Control (1997) 8 3 255 269 CrossrefGoogle Scholar
  • Thierry M. , Salomon M. , Van Nunen J. , Van Wassenhove L. V. Strategic issues in product recovery management. California Management Review (1995) 37 2 114 135 CrossrefGoogle Scholar
  • Tripp R. S. , Cohen I. K. , Pyles R. A. , Hillestad R. J. , Clarke R. W. , Limpert S. B. , Kassicieh S. K. A decision support system for assessing and controlling the effectiveness of multi-echelon logistics actions. Interfaces (1991) 21 4 11 25 LinkGoogle Scholar
  • van der Laan E. , Dekker R. , Salomon M. , Ridder A. An (s,Q) inventory model with remanufacturing and disposal. International Journal of Production Economics (1996) 46–47 339 350 CrossrefGoogle Scholar
  • van der Laan E. A. , Salomon M. , Dekker R. Production planning and inventory control for remanufacturable durable products. European Journal of Operational Research (1997) 102 2 264 278 CrossrefGoogle Scholar
  • Verrijdt J. H. C. M. Design and control of service part distribution systems. (1997) . PhD dissertation, Technical University of Eindhoven, The Netherlands Google Scholar
  • Wang Y. , Cohen M. A. , Zheng Y.-S. A two-echelon repairable inventory system with stocking-center-dependent depot replenishment lead times. (1998) . Working paper, OPIM Department, The Wharton School, University of Pennsylvania Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.