Improving Operations and Quoting Accurate Lead Times in a Laminate Plant
Published Online:1 Oct 2000https://doi.org/10.1287/inte.30.5.1.11637
References
- Managing stochastic multi-product systems: Model, measures, and analysis. Operations Research (1998) May–June46(3):98–111Link, Google Scholar
- Application of perturbation analysis to a class of (s,S) inventory systems. Naval Research Logistics (1994) January–February41(1):47–80Crossref, Google Scholar
- Stochastic analysis of cyclic schedules. Operations Research (1993) September–October41(5):947–958Link, Google Scholar
- A Guide to Simulation (1987) (Springer Verlag, New York) Crossref, Google Scholar
- Perturbation analysis for the design of flexible manufacturing system flow controllers. Operations Research (1992) November–December40(6):1107–1125Link, Google Scholar
- The economic lot scheduling problem: Achieving feasibility using time-varying lot sizes. Operations Research (1987) September–October35(5):764–771Link, Google Scholar
- The economic lot scheduling problem (ELSP): Review and extensions. Management Science (1978) 24(5):587–598Link, Google Scholar
- (s,S) inventory systems with random lead times: Harris Recurrence and its implications in sensitivity analysis. Probability in the Engineering and Informational Sciences (1994) 8(3):355–376Crossref, Google Scholar
- Scheduling the production of several items with random demands in a single facility. Management Science (1990) 36(12):1579–1592Link, Google Scholar
- Bounds and asymptotics for planning critical safety stocks (1993) (Graduate School of Business, Columbia University, New York) . working paperGoogle Scholar
- The stability of a capacitated, multi-echelon production-inventory system under a base-stock policy. Operations Research (1994) 42(5):913–925Link, Google Scholar
- Sensitivity analysis for base-stock levels in multi-echelon production-inventory systems. Management Science (1995) 41(2):263–281Link, Google Scholar
- The multi-product production cycling problem. AIIE Transactions (1980) 12:233–240Crossref, Google Scholar
- . A heuristic scheduling policy for multi-item single-machine production systems with time-varying stochastic demands. Management Science (1988) 34(3):377–390Link, Google Scholar
- . Note: An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine. Management Science (1991) 37(9):1201–1205Link, Google Scholar
- The stochastic economic lot scheduling problem: Heavy traffic analysis of dynamic cyclic policies (1995) (Sloan School of Management, Massachusetts Institute of Technology, Cambridge, Massachusetts) . working paperGoogle Scholar
- Production and Operations Analysis (1993) (Richard D. Irwin, New York) Google Scholar
- Analysis of Polling Systems (1986) (MIT Press, Cambridge, Massachusetts) Google Scholar
- Structural properties and a heuristic for kanban controlled serial lines. Management Science (1993) 39(11):1347–1368Link, Google Scholar
- An algebraic geometry algorithm for scheduling in presence of setups and correlated demands. Mathematical Programming (1995) 69(3):369–402Crossref, Google Scholar
- Synchronous Manufacturing (1990) (Southwestern Publishing, Cincinnati, Ohio) Google Scholar
- Approximating optimal threshold values for unreliable manufacturing systems via stochastic optimization (1992) 31st Conference on Decision and Control(New Orleans, Louisiana)Crossref, Google Scholar
- Computing optimal lot sizes in the economic lot scheduling problem. Operations Research (1991) 39(1):56–63Link, Google Scholar

