Production Scheduling Theory: Just Where Is It Applicable?

References

  • Anthony R. N.Planning and Control Systems: A Framework for Analysis (1965) (Division of Research, Harvard University Graduate School of Business, Boston, Massachusetts) Google Scholar
  • Baker K. R., Scudder G. D. Sequencing with earliness and tardiness penalties: A review. Operations Research (1990) 38(1):22–36LinkGoogle Scholar
  • Beischel M. E., Smith K. R. Linking the shop floor to the top floor. Management Accounting (1991) 73(4):25–29Google Scholar
  • Bertrand J. W. M., Wortmann J. C., Wijngaard J.Production Control: A Structural and Design Oriented Approach (1990) (Elsevier, Amsterdam)Google Scholar
  • Buxey G. Production scheduling: Theory and practice. European Journal of Operational Research (1989) 39(1):17–31CrossrefGoogle Scholar
  • Cheng T. C. E., Gupta M. C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research (1989) 38(2):156–166CrossrefGoogle Scholar
  • Dudek R. A., Panwalker S. S., Smith M. L. The lessons of flow shop scheduling research. Operations Research (1992) 40(1):7–13LinkGoogle Scholar
  • Graves S. C. A review of production scheduling. Operations Research (1981) 29(2):646–675LinkGoogle Scholar
  • Hill T. J.Manufacturing Strategy: Text and Cases (1994) second edition(Richard D. Irwin, Homewood, Illinois) Google Scholar
  • Johnson S. M. Optimal two- and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly (1954) 1(1):61–68CrossrefGoogle Scholar
  • MacCarthy B. L., Liu J. Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research (1993) 31(1):59–79CrossrefGoogle Scholar
  • McKay K. N., Safayeni F. R., Buzacott J. A. Job-shop scheduling theory: What is relevant? Interfaces (1988) 18(4):84–90LinkGoogle Scholar
  • McKay K. N., Safayeni F. R., Buzacott J. A. ‘Common sense’ realities of planning and scheduling in printed circuit board production. International Journal of Production Research (1995) 33(6):1587–1603CrossrefGoogle Scholar
  • Melnyk S. A., Vickery S. K., Carter P. L. Scheduling, sequencing, and dispatching: Alternative perspectives. Production and Inventory Management Journal (1986) second quarter27(2):58–67Google Scholar
  • Morton T. E., Pentico D. W.Heuristic Scheduling Systems: With Applications to Production Systems and Project Management (1993) (John Wiley and Sons, New York) Google Scholar
  • Portougal V., Oliver L.Production Planning System Design (1996) (Dunmore Press, Palmerston North, New Zealand) Google Scholar
  • Sen T., Gupta S. K. A state-of-art survey of static scheduling research involving due dates. OMEGA (1984) 12(1):63–76CrossrefGoogle Scholar
  • Womack J. P., Jones D. T., Roos D.The Machine That Changed the World (1990) (Harper Collins, New York) Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.