Optimizing Plant-Line Schedules and an Application at Hidden Valley Manufacturing Company

Published Online:https://doi.org/10.1287/inte.32.3.1.44

References

  • Brown G. G., Dell R. F., Wood R. K. Optimization and persistence. Interfaces (1997) 27(5):15–37LinkGoogle Scholar
  • Brown G. G., Geoffrion A.M., Bradley G. H. Seasonal production and sales planning with limited shared tooling at the key operation. Management Sci. (1981) 27(3):247–259LinkGoogle Scholar
  • Brown G. G., Olson M.P. Dynamic factorization in large-scale optimization. Math. Programming (1994) 64(1):17–51CrossrefGoogle Scholar
  • Clark W.The Gantt Chart (1922) (Ronald Press, New York) Google Scholar
  • Geoffrion A. M., Graves G. W. Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach. Oper. Res. (1976) 24(4):595–610LinkGoogle Scholar
  • Glover F., Laguna M.Tabu Search (1997) (Kluwer Academic Publishers, Boston, MA) CrossrefGoogle Scholar
  • Hoffman K. L., Padberg M. Solving airline crew scheduling problems by branch-and-cut. Management Sci. (1993) 39(6):657–682LinkGoogle Scholar
  • Kang S., Malik K., Thomas L. J. Lotsizing and scheduling on parallel machines with sequence-dependent setup costs. Management Sci. (1999) 45(2):273–289LinkGoogle Scholar
  • Kuik R., Salomon M. Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic. Euro. J. Oper. Res. (1990) 45(1):25–37CrossrefGoogle Scholar
  • Lawrence K. D., Zanakis S. H.Production Planning and Scheduling: Mathematical Programming Applications (1984) (Industrial Engineering and Management Press, Norcross, GA) Google Scholar
  • Nicholson T. A. J., Pullen R. D. A linear programming model for integrating annual planning of production and marketing. Internat. J. Production Res. (1971) 9(3):361–369CrossrefGoogle Scholar
  • PowerVista PowerVista Bridge Graphical Application Toolkit. (2001) . Conifer, CO www.powervista.comGoogle Scholar
  • Sibre C. E. A quadratic assignment/linear programming approach to ship scheduling for the U.S. Coast Guard. (1977) . M.S. thesis, Naval Postgraduate School, Monterey, CAGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.