Optimizing Plant-Line Schedules and an Application at Hidden Valley Manufacturing Company
Published Online:1 Jun 2002https://doi.org/10.1287/inte.32.3.1.44
References
- Optimization and persistence. Interfaces (1997) 27(5):15–37Link, Google Scholar
- Seasonal production and sales planning with limited shared tooling at the key operation. Management Sci. (1981) 27(3):247–259Link, Google Scholar
- Dynamic factorization in large-scale optimization. Math. Programming (1994) 64(1):17–51Crossref, Google Scholar
- The Gantt Chart (1922) (Ronald Press, New York) Google Scholar
- Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach. Oper. Res. (1976) 24(4):595–610Link, Google Scholar
- Tabu Search (1997) (Kluwer Academic Publishers, Boston, MA) Crossref, Google Scholar
- Solving airline crew scheduling problems by branch-and-cut. Management Sci. (1993) 39(6):657–682Link, Google Scholar
- Lotsizing and scheduling on parallel machines with sequence-dependent setup costs. Management Sci. (1999) 45(2):273–289Link, Google Scholar
- Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic. Euro. J. Oper. Res. (1990) 45(1):25–37Crossref, Google Scholar
- Production Planning and Scheduling: Mathematical Programming Applications (1984) (Industrial Engineering and Management Press, Norcross, GA) Google Scholar
- A linear programming model for integrating annual planning of production and marketing. Internat. J. Production Res. (1971) 9(3):361–369Crossref, Google Scholar
- PowerVista PowerVista Bridge Graphical Application Toolkit. (2001) . Conifer, CO www.powervista.comGoogle Scholar
- A quadratic assignment/linear programming approach to ship scheduling for the U.S. Coast Guard. (1977) . M.S. thesis, Naval Postgraduate School, Monterey, CAGoogle Scholar

