Australian Sugar Mills Optimize Harvester Rosters to Improve Production
Published Online:1 Jun 2002https://doi.org/10.1287/inte.32.3.15.41
References
- Arouting and scheduling problem for a rail system: A case study. J. Oper. Res. Soc. (1981) 32(9):767–774Crossref, Google Scholar
- Rural participatory research in Alaska: The case of Tanakon Village. J. Rural Stud. (1999) 15(2):171–178Crossref, Google Scholar
- A simulated annealing approach to the cyclic staff scheduling problem. Naval Res. Logistics (1993) 40(1):69–84Crossref, Google Scholar
- Modelling and solving the crew rostering problem. Oper. Res. (1998) 46(6):820–830Link, Google Scholar
- Nurse scheduling with tabu search and strategic oscillation. Euro. J. Oper. Res. (1998) 106(2–3):393–407Crossref, Google Scholar
- A user's guide to tabu search. Ann. Oper. Res. (1993) 41(1):3–28Crossref, Google Scholar
- Cost and service improvements in harvest/transport through optimization modelling. Proc. 19th Australian Society of Sugarcane Technologists (1997) Coirns, Australia:6–13Google Scholar
- Optimizing cane supply decisions within a sugar mill region. J. Scheduling (1999) 2(5):229–244Crossref, Google Scholar
- Participatory research: Methods—implementation, effectiveness and institutional context. Agricultural Systems (1997) 55(2):195–216Crossref, Google Scholar
- Action Learning: A Guide for Professional, Management, and Educational Development (1995) (Kogan Page, London, U.K) Google Scholar
- Towards improved harvest management using a whole industry systems approach. Proc. 22nd Australian Society of Sugar Cane Technologists (2000) Bunduberg, Australia:30–37Google Scholar
- Evaluation of cropping options using a participatory approach with on-farm monitoring and simulation: A case study of spring-sown mungbeans. Australian J. Agricultural Res. (2000) 51(1):1–12Crossref, Google Scholar
- Part type selection problem in flexible manufacturing systems: Tabu search algorithms. Ann. Oper. Res. (1993) 41(1):279–297Crossref, Google Scholar

