Managing Increasing Product Variety at Integrated Steel Mills

References

  • Axs΀ter S.Inventory Control (2000) (Kluwer International Series in Operations Research and Management Science. Kluwer Academic Publishers, Boston, A) CrossrefGoogle Scholar
  • Balakrishnan A., Brown S. Process planning for aluminium tubes: An engineering-operations perspective. Oper. Res. (1996) 44(1):7–20LinkGoogle Scholar
  • Bielefeld F. W., Walter K., Wartmann R. A computer-based strategic planning system for steel production. Interfaces (1986) 16(4):41–46LinkGoogle Scholar
  • Boukas E. K., Haurie A., Soumis F. Hierarchical approach to steel production scheduling under a global energy constraint. Ann. Oper. Res. (1990) 26(12):289–311Google Scholar
  • Box R. E., Herbe D. G. A scheduling model for LTV Steel's Cleveland Works' twin strand continuous slab caster. Interfaces (1988) 18(1):42–56LinkGoogle Scholar
  • Chen M., Wang W. A linear programming model for integrated steel production and distribution planning. Internat. J. Oper. Production Management (1997) 17(6):592–610CrossrefGoogle Scholar
  • Cornuejols G., Fisher M. L., Nemhauser G. L. Location of bank accounts to optimize float. Management Sci (1977) 23(8):789–810LinkGoogle Scholar
  • Diaz A., Sancho L., Garcia R., Larraneta J. A dynamic scheduling and control algorithm in an ENSIDESA steel plant. Interfaces (1991) 21(5):53–62LinkGoogle Scholar
  • Dutta G., Fourer R. A survey of mathematical programming application in integrated steel plants. (1995) Presented at the INFORMS New Orleans meeting, New Orleans, LA, November 1995 http://iems.nwu.edu/~4er/steel/survey.htmlGoogle Scholar
  • Gallego G., Zipkin P. Stock positioning and performance in serial production-transportation systems. Manufacturing Service Oper. Management (1999) 1(1):77–88LinkGoogle Scholar
  • Garg A., Tang C. S. On postponement strategies for product families with multiple points of differentiation. IIE Trans (1997) 29(1):641–650Google Scholar
  • Graman G. A., Magazine M. J. An analysis of packaging postponement. Proc. 1998 MSOM Conf. (1998) School of Business Administration, University of Washington, Seattle, WA:67–72June 29–30Google Scholar
  • Gupta D., Benjaafar S. Make-to-order, make-to-stock, or delay product differentiation?—A common framework for modeling and analysis. (2001) . Working paper, Department of Mechanical Engineering, University of Minnesota, Minneapolis, MNGoogle Scholar
  • Hafeez K., Griffiths M., Griffiths J., Naim M. Systems design of a two-echelon steel industry supply chain. Internat. J. Production Econom. (1996) 45(1–3):121–130CrossrefGoogle Scholar
  • Jacobs T. L., Wright J. R., Cobbs A. E. Optimal inter-process steel production scheduling. Comput. Oper. Res. (1988) 15(6):497–507CrossrefGoogle Scholar
  • Kalagnanam J. R., Dawande M. W., Trumbo M., Lee H. S. The surplus inventory matching problem in the process industry. Oper. Res. (2000) 48(4):505–516LinkGoogle Scholar
  • Kisperska-Moron D. Analysis of the logistic system of steel products in Poland. Engrg. Costs Production Econom. (1990) 19(1–3):47–55CrossrefGoogle Scholar
  • Lee H. L. Effective inventory and service management through product and process redesign. Oper. Res. (1996) 44(4):151–159LinkGoogle Scholar
  • Lee H. L., Billington C., Dasu S., Eastman C. Designing products and processes for postponement. Management of Design: Engineering and Management Perspectives (1994) (Kluwer Academic Publishers, Boston, MA) 105–122CrossrefGoogle Scholar
  • Lee H. L., Tang C. S. Modeling the costs and benefits of delayed product differentiation. Management Sci (1997) 43(1):40–53LinkGoogle Scholar
  • Lin C. W., Moodie C. L. Hierarchical production planning for a modern steel manufacturing system. Internat. J. Production Res. (1989) 27(4):613–628CrossrefGoogle Scholar
  • Mirchandani P. B., Francis R. L.Discrete Location Theory (1990) (John Wiley and Sons, New York) Google Scholar
  • Nemhauser G. L., Wolsey L. A.Integer and Combinatorial Optimization (1999) (John Wiley and Sons, New York) Google Scholar
  • Sasidhar B., Achary K. K. A multiple arc network model of production planning in a steel mill. Internat. J. Production Econom. (1991) 22(3):195–202CrossrefGoogle Scholar
  • Silver S. A., Pyke D. F., Peterson R.Inventory Management and Production Planning and Scheduling (1998) 3rd ed.(John Wiley and Sons, New York) Google Scholar
  • Sinha G. P., Chandrasekaran B. S., Mitter N., Dutta G., Singh S. B., Choudhury A. R., Roy P. N. Strategic and operational management with optimization at Tata Steel. Interfaces (1995) 25(1):6–19LinkGoogle Scholar
  • Swaminathan J. M., Tayur S. R. Managing broader product lines through delayed differentiation using vanilla boxes. Management Sci (1998) 44(12):161–S172LinkGoogle Scholar
  • Teitz M. B., Bart P. Heuristic methods for estimating the generalized vertex median of a weighted graph. Oper. Res. (1968) 16((September-October)):955–961LinkGoogle Scholar
  • Vasko F. J., Wolf F. E., Pflugrad J. A. An efficient heuristic for planning mother plate requirements at Bethlehem Steel. Interfaces (1991) 21(2):1–7LinkGoogle Scholar
  • Vasko F. J., Wolf F. E., Stott K. L., Ehrsam O. Bethlehem Steel combines cutting stock and set covering to enhance customer service. Math. Comput. Modelling (1992) 16(1):19–17CrossrefGoogle Scholar
  • Vasko F. J., Wolf F. E., Stott K. L., Scheirer J. W. Selecting optimal ingot sizes for Bethlehem Steel. Interfaces (1989) 19(1):68–84LinkGoogle Scholar
  • Vonderembse M. A. Selecting master slab width(s) for continuous steel casting. J. Oper. Management (1984) 4(3):231–244CrossrefGoogle Scholar
  • Vonderembse M. A., Haessler R. W. A mathematical programming approach to schedule master slab casters in the steel industry. Management Sci (1982) 28(12):1450–1461LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.