Technical Systems Development Risk Factors: The Role of Empowering Leadership in Lowering Developers’ Stress

Published Online:https://doi.org/10.1287/isre.2017.0716

References

  • Ahuja MK, Chudoba KM, Kacmar CJ, McKnight DH, George JF (2007) ICT road warriors: Balancing work-family conflict, job autonomy, and work overload to mitigate turnover intentions. MIS Quart. 31(1):1–17.CrossrefGoogle Scholar
  • Aiken LS, West SG (1991) Multiple Regression: Testing and Interpreting Interactions (Sage Publications, Newbury Park, CA).Google Scholar
  • Akaike H (1974) A new look at the statistical model identification. IEEE Trans. Automatic Control 19(6):716–723.CrossrefGoogle Scholar
  • Ancona DG, Caldwell DF (1992) Demography and design: Predictors of new product team performance. Organ. Sci. 3(3):321–341.LinkGoogle Scholar
  • Arnold JA, Arad S, Rhoades JA, Drasgow F (2000) The empowering leadership questionnaire: The construction and validation of a new scale for measuring leader behaviors. J. Organ. Behav. 21(3):249–269.CrossrefGoogle Scholar
  • Babin BJ, Boles JS (1996) The effects of perceived co-worker involvement and supervisor support on service provider role stress, performance and job satisfaction. J. Retailing 72(1):57–75.CrossrefGoogle Scholar
  • Bandura A (1997) Self-Efficacy: The Exercise of Control (W.H. Freeman, New York).Google Scholar
  • Banker RD, Davis GB, Slaughter SA (1998) Software development practices, software complexity, and software maintenance performance: A field study. Management Sci. 44(4):433–450.LinkGoogle Scholar
  • Barki H, Rivard S, Talbot J (1993) Toward an assessment of software development risk. J. Management Inform. Systems 10(2):203–225.CrossrefGoogle Scholar
  • Baroudi JJ (1985) The impact of role variables on IS personnel work attitudes and intentions. MIS Quart. 9(4):341–356.CrossrefGoogle Scholar
  • Bass BM, Bass R (2008) The Bass Handbook of Leadership: Theory, Research, and Managerial Applications (Free Press, New York).Google Scholar
  • Beauchamp MR, Bray SR, Eys MA, Carron AV (2002) Role ambiguity, role efficacy, and role performance: Multidimensional and mediational relationships within interdependent sport teams. Group Dynam. 6(3):229–242.CrossrefGoogle Scholar
  • Bentler PM (1990) Comparative fit indexes in structural models. Psych. Bull. 107(2):238–246.CrossrefGoogle Scholar
  • Bettin PJ, Kennedy JK (1991) Leadership experience and leader performance: Some empirical support at last. Leadership Quart. 1(4):219–228.CrossrefGoogle Scholar
  • Blau PM (1977) Inequality and Heterogeneity: A Primitive Theory of Social Structure (Free Press, New York).Google Scholar
  • Bliese PD (2000) Within-group agreement, non-independence, and reliability: Implications for data aggregation and analysis. Klein KJ, Kozlowski SW, eds. Multilevel Theory, Research, and Methods in Organizations: Foundations, Extensions, and New Directions (Jossey-Bass, San Francisco), 349–381.Google Scholar
  • Bliese PD, Hanges PJ (2004) Being both too liberal and too conservative: The perils of treating grouped data as though they were independent. Organ. Res. Methods 7(4):400–417.CrossrefGoogle Scholar
  • Bray SR, Brawley LR (2002) Role efficacy, role clarity, and role performance effectiveness. Small Group Res. 33(2):233–253.CrossrefGoogle Scholar
  • Burton-Jones A, Gallivan MJ (2007) Toward a deeper understanding of system usage in organizations: A multilevel perspective. MIS Quart. 31(4):657–679.CrossrefGoogle Scholar
  • Chebat JC, Kollias P (2000) The impact of empowerment on customer contact employees’ roles in service organizations. J. Service Res. 3(1):66–81.CrossrefGoogle Scholar
  • Chen G, Mathieu JE, Bliese PD (2004) A framework for conducting multi-level construct validation. Yammarino FJ, Dansereau F, eds. Research in Multi-Level Issues: Multi-Level Issues in Organizational Behavior and Processes, Vol. 3 (Elsevier, Oxford, UK), 273–303.CrossrefGoogle Scholar
  • CIO Magazine (2012) Employees rate satisfaction, security, and stress. (April 9), http://www.cio.com/article/2397441/careers-staffing/employees-rate-satisfaction–security-and-stress.html.Google Scholar
  • Computerworld (2011) Employees rate satisfaction, security and stress. http://www.computerworld.com/s/article/9214742/Employees_Rate_Satisfaction_Security_and_Stress.Google Scholar
  • Cramton CD (2001) The mutual knowledge problem and its consequences for dispersed collaboration. Organ. Sci. 12(3):346–371.LinkGoogle Scholar
  • Cramton CD (2002) Finding common ground in dispersed collaboration. Organ. Dynam. 30(4):356–367.CrossrefGoogle Scholar
  • Curral LA, Forrester RH, Dawson JF, West MA (2001) It’s what you do and the way that you do it: Team task, team size, and innovation-related group processes. Eur. J. Work Organ. Psych. 10(2):187–204.CrossrefGoogle Scholar
  • Deci EL, Ryan RM (1985) Intrinsic Motivation and Self-Determination in Human Behavior (Plenum, New York).CrossrefGoogle Scholar
  • Denison DR, Hooijberg R, Quinn RE (1995) Paradox and performance: Toward a theory of behavioral complexity in managerial leadership. Organ. Sci. 6(5):524–540.LinkGoogle Scholar
  • Diamantopoulos A, Winklhofer H (2001) Index construction with formative indicators: An alternative to scale development. J. Marketing Res. 38(2):269–277.CrossrefGoogle Scholar
  • Druskat VU, Wheeler JV (2003) Managing from the boundary: The effective leadership of self-managing work teams. Acad. Management J. 46(4):435–457.CrossrefGoogle Scholar
  • Ewusi-Mensah K (1997) Critical issues in abandoned information systems development projects. Comm. ACM 40(9):74–80.CrossrefGoogle Scholar
  • Ewusi-Mensah K, Przasnyski ZH (1991) On information systems project abandonment: An exploratory study of organizational practices. MIS Quart. 15(1):67–86.CrossrefGoogle Scholar
  • Faraj S, Sambamurthy V (2006) Leadership of information systems development projects. IEEE Trans. Engrg. Management 53(2):238–249.CrossrefGoogle Scholar
  • Faraj S, Sproull L (2000) Coordinating expertise in software development teams. Management Sci. 46(12):1554–1568.LinkGoogle Scholar
  • Fayol H (1949) General and Industrial Management (Pitman and Sons, Ltd., London). [Translated from French edition by Storrs C.]Google Scholar
  • Fornell C, Larcker DF (1981) Evaluating structural equation models with unobservable variables and measurement error. J. Marketing Res. 18(1):39–50.CrossrefGoogle Scholar
  • Fowler M, Highsmith J (2001) The agile manifesto. Software Development 9(8):28–35.Google Scholar
  • Furuyama T, Arai Y, Iio K (1994) Fault generation model and mental stress effect analysis. J. Systems Software 26(1):31–42.CrossrefGoogle Scholar
  • Furuyama T, Arai Y, Iio K (1997) Analysis of fault generation caused by stress during software development. J. Systems Software 38(1):13–25.CrossrefGoogle Scholar
  • Gefen D, Straub DW, Boudreau MC (2000) Structural equation modeling and regression: Guidelines for research practice. Comm. AIS 4(1):1–79.Google Scholar
  • Gemino A, Reich BH, Sauer C (2008) A temporal model of information technology project performance. J. Management Inform. Systems 24(3):9–44.CrossrefGoogle Scholar
  • Glass RL (1997) The ups and downs of programmer stress. Comm. ACM 40(4):17–19.CrossrefGoogle Scholar
  • Gopal A, Mukhopadhyay T, Krishnan MS (2002) The role of software processes and communication in offshore software development. Comm. ACM 45(4):193–200.CrossrefGoogle Scholar
  • Guinan PJ, Cooprider JG, Faraj S (1998) Enabling software development team performance during requirements definition: A behavioral versus technical approach. Inform. Systems Res. 9(2):101–125.LinkGoogle Scholar
  • Hancock PA, Szalma JL (2008) Stress and performance. Hancock PA, Szalma JL, eds. Performance Under Stress (Ashgate Publishing, Burlington, VT), 1–18.Google Scholar
  • Häusser JA, Mojzisch A, Niesel M, Schulz-Hardt S (2010) Ten years on: A review of recent research on the job demand–control (support) model and psychological well-being. Work Stress 24(1):1–35.CrossrefGoogle Scholar
  • Hertel G, Geister S, Konradt U (2005) Managing virtual teams: A review of current empirical research. Human Resource Management Rev. 15(1):69–95.CrossrefGoogle Scholar
  • Hinds PJ, Bailey DE (2003) Out of sight, out of sync: Understanding conflict in distributed teams. Organ. Sci. 14(6):615–632.LinkGoogle Scholar
  • Hofmann DA (1997) An overview of the logic and rationale of hierarchical linear models. J. Management 23(6):723–744.CrossrefGoogle Scholar
  • Hofmann DA, Gavin MB (1998) Centering decisions in hierarchical linear models: Implications for research in organizations. J. Management 24(5):623–641.Google Scholar
  • Hofmann DA, Morgeson FP, Gerras SJ (2003) Climate as a moderator of the relationship between leader-member exchange and content specific citizenship: Safety climate as an exemplar. J. Appl. Psych. 88(1):170–178.CrossrefGoogle Scholar
  • House RJ, Schuler RS, Levanoni E (1983) Role conflict and ambiguity scales: Reality or artifacts. J. Appl. Psych. 68(2):334–337.CrossrefGoogle Scholar
  • Hu L, Bentler PM (1999) Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives. Structural Equation Model. 6(1):1–55.CrossrefGoogle Scholar
  • Huckman RS, Staats BR, Upton DM (2009) Team familiarity, role experience, and performance: Evidence from Indian software services. Management Sci. 55(1):85–100.LinkGoogle Scholar
  • James LR, Demaree RG, Wolf G (1984) Estimating within-group interrater reliability with and without response bias. J. Appl. Psych. 69(1):219–229.CrossrefGoogle Scholar
  • Joseph D, Ng K, Koh C, Ang S (2007) Turnover of IT professionals: A narrative review, meta-analytic structural equation modeling, and model development. MIS Quart. 31(3):1–31.CrossrefGoogle Scholar
  • Karasek RA (1979) Job demands, job decision latitude, and mental strain: Implications for job redesign. Admin. Sci. Quart. 24(2):285–308.CrossrefGoogle Scholar
  • Keil M, Tiwana A, Bush A (2002) Reconciling user and project manager perceptions of IT project risk: A Delphi study. Inform. Systems J. 12(2):103–119.CrossrefGoogle Scholar
  • Kelloway EK, Sivanathan N, Francis L, Barling J (2005) Poor leadership. Barling J, Kelloway EK, Frone MR, eds. Handbook of Work Stress (Sage Publications, Thousand Oaks, CA), 89–112.CrossrefGoogle Scholar
  • Kirkman BL, Rosen B (1999) Beyond self-management: Antecedents and consequences of team empowerment. Acad. Management J. 42(1):58–74.CrossrefGoogle Scholar
  • Kirsch LJ, Ko DG, Haney MH (2010) Investigating the antecedents of team-based clan control: Adding social capital as a predictor. Organ. Sci. 21(2):469–489.LinkGoogle Scholar
  • Kirsch LS (1997) Portfolios of control modes and IS project management. Inform. Systems Res. 8(3):215–239.LinkGoogle Scholar
  • Klein R, Rai A (2009) Interfirm strategic information flows in logistics supply chain relationships. MIS Quart. 33(4):735–762.CrossrefGoogle Scholar
  • Kline RB (2005) Principles and Practice of Structural Equation Modeling (Guilford Press, New York).Google Scholar
  • Kozlowski SW, Klein KJ (2000) A multilevel approach to theory and research in organizations: Contextual, temporal, and emergent processes. Klein KJ, Kozlowski SW, eds. Multilevel Theory, Research, and Methods in Organizations: Foundations, Extensions, and New Directions (Jossey-Bass, San Francisco), 3–90.Google Scholar
  • Lamb R, Kling R (2003) Reconceptualizing users as social actors in information systems research. MIS Quart. 27(2):197–236.CrossrefGoogle Scholar
  • Lander MC, Purvis RL, McCray GE, Leigh W (2004) Trust-building mechanisms utilized in outsourced IS development projects: A case study. Inform. Management 41(4):509–528.CrossrefGoogle Scholar
  • Lee PCB (2000) Turnover of information technology professionals: A contextual model. Accounting, Management, Inform. Tech. 10(2):101–124.CrossrefGoogle Scholar
  • Magni M, Maruping L (2013) Sink or swim: Empowering leadership and overload in teams’ ability to deal with the unexpected. Human Resource Management 52(5):715–739.CrossrefGoogle Scholar
  • Malhotra NK, Kim SS, Patil A (2006) Common method variance in IS research: A comparison of alternative approaches and a reanalysis of past research. Management Sci. 52(12):1865–1883.LinkGoogle Scholar
  • Marrone JA, Tesluk PE, Carson JB (2007) A multilevel investigation of antecedents and consequences of team member boundary-spanning behavior. Acad. Management J. 50(6):1423–1439.CrossrefGoogle Scholar
  • Marsh HW, Hocevar D (1985) Application of confirmatory factor analysis to the study of self-concept: First- and higher order factor models and their invariance across groups. Psych. Bull. 97(3):562–582.CrossrefGoogle Scholar
  • Maruping LM, Venkatesh V, Agarwal R (2009a) A control theory perspective on agile methodology use and changing user requirements. Inform. Systems Res. 20(3):377–399.LinkGoogle Scholar
  • Maruping LM, Zhang X, Venkatesh V (2009b) Role of collective ownership and coding standards in coordinating expertise in software project teams. Eur. J. Inform. Systems 18(4):355–371.CrossrefGoogle Scholar
  • Müller R, Turner JR (2007) Matching the project manager’s leadership style to project type. Internat. J. Project Management 25(1):21–32.CrossrefGoogle Scholar
  • Napier NP, Keil M, Tan FB (2009) IT project managers’ construction of successful project management practice: A repertory grid investigation. Inform. Systems J. 19(3):255–282.CrossrefGoogle Scholar
  • Nelson RR (2007) IT project management: Infamous failures, classic mistakes, and best practices. MIS Quart. Executive 6(2):67–78.Google Scholar
  • Pee LG, Kankanhalli A, Kim HW (2010) Knowledge sharing in information systems development: A social interdependence perspective. J. Assoc. Inform. Systems 11(10):550–575.Google Scholar
  • Pennington R, Tuttle B (2007) The effects of information overload on software project risk assessment. Decision Sci. 38(3):489–526.CrossrefGoogle Scholar
  • Perrewé PL, Zellars KL, Ferris GR, Rossi AM, Kacmar CJ, Ralston DA, Rossi AM (2004) Neutralizing job stressors: Political skill as an antidote to the dysfunctional consequences of role conflict. Acad. Management J. 47(1):141–152.CrossrefGoogle Scholar
  • Petter S, Straub D, Rai A (2007) Specifying formative constructs in information systems research. MIS Quart. 31(4):623–656.CrossrefGoogle Scholar
  • Pettey C, van der Meulen R (2016) Gartner says global IT spending to reach $3.5 trillion in 2017. Press release, Gartner Group, Stamford, CT, http://www.gartner.com/newsroom/id/3482917.Google Scholar
  • Pettijohn C, Pettijohn LS, Taylor AJ, Keillor BD (2001) Are performance appraisals a bureaucratic exercise or can they be used to enhance sales force satisfaction and commitment? Psych. Marketing 18(4):337–364.CrossrefGoogle Scholar
  • Ply JK, Moore JE, Williams CK, Thatcher JB (2012) IS employee attitudes and perceptions at varying levels of software process maturity. MIS Quart. 36(2):601–624.CrossrefGoogle Scholar
  • Polzer JT, Crisp CB, Jarvenpaa SL, Kim JW (2006) Extending the faultline model to geographically dispersed teams: How colocated subgroups can impair group functioning. Acad. Management J. 49(4):679–692.CrossrefGoogle Scholar
  • Rahim MA (2011) Managing Conflict in Organizations (Transaction Publishers, New Brunswick, NJ).Google Scholar
  • Rai A, Tang X (2010) Leveraging IT capabilities and competitive process capabilities for the management of interorganizational relationship portfolios. Inform. Systems Res. 21(3):516–542.LinkGoogle Scholar
  • Rai A, Maruping LM, Venkatesh V (2009) Offshore information systems project success: The role of social embeddedness and cultural characteristics. MIS Quart. 33(3):617–641.CrossrefGoogle Scholar
  • Rai A, Patnayakuni R, Seth N (2006) Firm performance impacts of digitally enabled supply chain integration capabilities. MIS Quart. 30(2):225–246.CrossrefGoogle Scholar
  • Rizzo JR, House RJ, Lirtzman SI (1970) Role conflict and ambiguity in complex organizations. Admin. Sci. Quart. 15(2):150–163.CrossrefGoogle Scholar
  • Rozeboom WW (1979) Sensitivity of a linear composite predictor items to differential item weighting. Psychometrika 44(3):289–296.CrossrefGoogle Scholar
  • Sarker S, Sarker S (2009) Exploring agility in distributed information systems development teams: An interpretive study in an offshoring context. Inform. Systems Res. 20(3):440–461.LinkGoogle Scholar
  • Sauer C, Reich BH (2009) Rethinking IT project management: Evidence of a new mindset and its implications. Internat. J. Project Management 27(2):182–193.CrossrefGoogle Scholar
  • Sauer C, Gemino A, Reich BH (2007) The impact of size and volatility on IT project performance. Comm. ACM 50(11):79–84.CrossrefGoogle Scholar
  • Savelsbergh C, Gevers JM, van der Heijden B, Poell RF (2012) Team role stress: Relationships with team learning and performance in project teams. Group Organ. Management 37(1):67–100.CrossrefGoogle Scholar
  • Schmidt R, Lyytinen K, Keil M, Cule P (2001) Identifying software project risks: An international Delphi study. J. Management Inform. Systems 17(4):5–36.CrossrefGoogle Scholar
  • Schwarz G (1978) Estimating the dimension of a model. Ann. Statist. 6(2):461–464.CrossrefGoogle Scholar
  • Sonnentag S, Kruel U (2006) Psychological detachment from work during off-job time: The role of job stressors, job involvement, and recovery-related self-efficacy. Eur. J. Work Organ. Psych. 15(2):197–217.CrossrefGoogle Scholar
  • Speier C, Venkatesh V (2002) The hidden minefields in the adoption of sales force automation technologies. J. Marketing 66(3):98–111.CrossrefGoogle Scholar
  • Spreitzer GM, De Janasz SC, Quinn RE (1999) Empowered to lead: The role of psychological empowerment in leadership. J. Organ. Behav. 20(4):511–526.CrossrefGoogle Scholar
  • Srivastava A, Bartol KM, Locke EA (2006) Empowering leadership in management teams: Effects of knowledge sharing, efficacy, and performance. Acad. Management J. 49(6):1239–1251.CrossrefGoogle Scholar
  • Stanton JM, Balzer WK, Smith PC, Parra LF, Ironson G (2001) A general measure of work stress: The stress in general scale. Ed. Psych. Measurement 61(5):866–888.CrossrefGoogle Scholar
  • Sun Y, Fang Y, Lim K (2012) Understanding sustained participation in transactional virtual communities. Decision Support Systems 53(1):12–22.CrossrefGoogle Scholar
  • Swanson V, Power K (2001) Employees’ perceptions of organizational restructuring: The role of social support. Work Stress 15(2):161–178.CrossrefGoogle Scholar
  • Tanriverdi H, Uysal VB (2011) Cross-business information technology integration and acquirer value creation in corporate mergers and acquisitions. Inform. Systems Res. 22(4):703–720.LinkGoogle Scholar
  • Taylor S (2011) Contemporary Issues in Human Resource Management (Chartered Institute of Personnel and Development, London).Google Scholar
  • Thamhain HJ (2004) Linkages of project environment to performance: Lessons for team leadership. Internat. J. Project Management 22(7):533–544.CrossrefGoogle Scholar
  • Thite M (2000) Leadership styles in information technology projects. Internat. J. Project Management 18(4):235–241.CrossrefGoogle Scholar
  • Thompson JD (1967) Organizations in Action (McGraw-Hill, New York).Google Scholar
  • Tippins MJ, Sohi RS (2003) IT competency and firm performance: Is organizational learning a missing link? Strategic Management J. 24(8):745–761.CrossrefGoogle Scholar
  • Tiwana A, Keil M (2010) Control in internal and outsourced software projects. J. Management Inform. Systems 26(3):9–44.CrossrefGoogle Scholar
  • Tsang EWK, Williams JN (2012) Generalization and induction: Misconceptions, clarifications, and a classification of induction. MIS Quart. 36(3):729–749.CrossrefGoogle Scholar
  • Tubre TC, Collins JM (2000) Jackson and Schuler (1985) revisited: A meta-analysis of the relationships between role ambiguity, role conflict, and job performance. J. Management 26(1):155–169.Google Scholar
  • Van der Doef M, Maes S (1999) The job demand-control (-support) model and psychological well-being: A review of 20 years of empirical research. Work Stress 13(2):87–114.CrossrefGoogle Scholar
  • Vecchio RP, Justin JE, Pearce CL (2010) Empowering leadership: An examination of mediating mechanisms within a hierarchical structure. Leadership Quart. 21(3):530–542.CrossrefGoogle Scholar
  • Volkoff O, Elmes MB, Strong DM (2004) Enterprise systems, knowledge transfer and power users. J. Strategic Inform. Systems 13(4):279–304.CrossrefGoogle Scholar
  • Wallace L, Keil M, Rai A (2004) How software project risk affects project performance: An investigation of the dimensions of risk and an exploratory model. Decision Sci. 35(2):289–321.CrossrefGoogle Scholar
  • Warwick DP, Lininger CA (1975) The Sample Survey: Theory and Practice (McGraw-Hill, New York).Google Scholar
  • Wong SS, DeSanctis G, Staudenmayer N (2007) The relationship between task interdependency and role stress: A revisit of the job demands–control model. J. Management Stud. 44(2):284–303.CrossrefGoogle Scholar
  • Xu SX, Zhang X (2013) Impact of Wikipedia on market information environment: Evidence on management disclosure and investor reaction. MIS Quart. 37(4):1043–1068.CrossrefGoogle Scholar
  • Zafiropoulos I, Metaxiotis K, Askounis D (2005) Dynamic risk management system for the modeling, optimal adaptation and implementation of an ERP system. Inform. Management Comput. Security 13(3):212–234.CrossrefGoogle Scholar
  • Zhang X, Bartol KM (2010) Linking empowering leadership and employee creativity: The influence of psychological empowerment, intrinsic motivation, and creative process engagement. Acad. Management J. 53(1):1–58.CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.