Guilt by Association: Strategic Failure Prevention and Recovery Capacity Investments
Published Online:15 Feb 2013https://doi.org/10.1287/mnsc.1120.1658
References
- Airport Logistics Rome: Siemens wins maintenance contract for Fiumicino Airport. Airport Logistics (2010) 4:3Google Scholar
- Alstom Alstom and BrightSource Energy step up solar partnership. (2010) . Press release (October 20), Alstom, Levallois-Perret, FranceGoogle Scholar
- , Kouvelis P, Dong L, Boyabatli O, Li R. Decentralized supply risk management. Handbook of Integrated Risk Management in Global Supply Chains (2012) (John Wiley & Sons, Hoboken, NJ) 389–424Google Scholar
- . Competition and diversification effects in supply chains with supplier default risk? Manufacturing Service Oper. Management (2007) 9(2):123–146Link, Google Scholar
- . Co-opetition and investment for supply-chain resilience. Production Oper. Management (2009) 18(6):583–603Crossref, Google Scholar
- . Statistical Theory of Reliability and Life Testing: Probability Models (1975) (Holt, Rinehart, and Winston, New York) Google Scholar
- . Illusions of safety. (1997) Paper presented at the Workshop on Organizational Analysis in High Hazard Production Systems: An Academy/Industry DialogueDedham, MA http://www.chpra.wisc.edu/pdfs/IllusionsofSafety.pdfGoogle Scholar
- , Wilson A, Limnios N, Keller-McNulty S, Armijo Y. Game-theoretic and reliability methods in counter-terrorism and security. Modern Statistical and Mathematical Methods in Reliability (2005) (World Scientific, Singapore) 17–28Crossref, Google Scholar
- . Investigating the Sayano-Shushenskaya Hydro Power Plant disaster. Power Magazine (2010) December 1). http://www.powermag.com/issues/features/Investigating-the-Sayano-Shushenskaya-Hydro-Power-Plant-Disaster_3229.htmlGoogle Scholar
- British Energy Results for the three months ended 29 June 2008 of the financial year ending 31 March 2009. (2008) PresentationAugust 13(British Energy, East Kilbride, UK) . http://www.british-energy.com/documents/Results_Presentation_Q1_0809_FINAL_WEBSITE.pdfGoogle Scholar
- . Pricing services subject to congestion: Charge per-use fees or sell subscriptions? Manufacturing Service Oper. Management (2011) 13(2):244–260Link, Google Scholar
- . Capacity choice and allocation: Strategic behavior and supply chain performance. Management Sci. (1999) 45(8):1091–1108Link, Google Scholar
- , Simchi-Levi D, Wu SD, Shen Z-J. Game theoretic applications in supply chain analysis. Handbook of Quantitative Supply Chain Analysis: Modeling in the eBusiness Era (2004) (Kluwer Academic Publishers, Boston) 13–66Crossref, Google Scholar
- . Software “glitch” causes baggage chaos at Heathrow. Computer World UK (2008) February 8). http://www.computerworlduk.com/news/security/7592/software-glitch-causes-baggage-chaos-at-heathrowGoogle Scholar
- . The importance of decoupling recurrent and disruption risks in a supply chain. Naval Res. Logist. (2007) 54(5):544–555Crossref, Google Scholar
- . Dyke maintenance and other stories: Some neglected types of public goods. Quart. J. Econom. (1993) 108(1):259–271Crossref, Google Scholar
- . A newsvendor's procurement problem when suppliers are unreliable. Manufacturing Service Oper. Management (2007) 9(1):9–32Link, Google Scholar
- . Adverse outages lead to loan increase. Engineer (2003) November 28). http://www.theengineer.co.uk/news/adverse-outages-lead-to-loan-increase/269044.articleGoogle Scholar
- GE Energy Power generation combined cycle: Bently Nevada asset condition monitoring. (2010) . http://www.ge-mcs.com/download/appsolutions/GEA18239_Combined_Cycle_Broch_r14-LR.pdfGoogle Scholar
- . Probabilistic risk analysis and game theory. Risk Anal. (2002) 22(1):17–27Crossref, Google Scholar
- . From weakest-link to best-shot: The voluntary provision of public goods. Public Choice (1983) 41(3):371–386Crossref, Google Scholar
- . Managing risk of supply disruptions: Incentives for capacity restoration. Production Oper. Management (2013) 22(1):137–150Crossref, Google Scholar
- . Contracting for infrequent restoration and recovery of mission-critical systems. Management Sci. (2010) 56(9):1551–1567Link, Google Scholar
- . Modeling and Analysis of Stochastic Systems (1995) (Chapman & Hall, Boca Raton, FL) Google Scholar
- . Interdependent security. J. Risk Uncertainty (2003) 26(2–3):231–249Crossref, Google Scholar
- . Project management contracts with delayed payments. Manufacturing Service Oper. Management (2010) 12(4):692–707Link, Google Scholar
- . Superjumbo engine fire led to “cascade of failures”. Independent (UK) (2010) November 19). http://www.independent.co.uk/travel/news-and-advice/superjumbo-engine-fire-led-to-cascade-of-failures-2138113.htmlGoogle Scholar
- . A series of preventable events leads to a power plant explosion. EC&M (2004) November 1). http://ecmweb.com/mag/electric_series_preventable_events/Google Scholar
- , Abdellaoui M, Luce RD, Machina MJ, Munier B. Probabilistic risk analysis versus decision analysis: Similarities, differences and illustrations. Uncertainty and Risk (2007) 41(Springer, Berlin) 223–242Theory and Decision Library CCrossref, Google Scholar
- . System Reliability Theory: Models, Statistical Methods, and Applications (2004) 2nd ed.(John Wiley & Sons, Hoboken, NJ) Google Scholar
- . Priority scheduling and spares stocking policies for a repair shop: The multiple failure case. Management Sci. (1984) 30(6):739–749Link, Google Scholar
- Siemens Siemens and Valoriza achieve crucial milestone: Lebrija solar thermal power plant feeds power to grid. (2012) . Press release (January 18), Siemens, Erlangen, Germany. http://www.siemens.com/press/en/feature/2012/energy/2012-01-lebrija.phpGoogle Scholar
- . On the value of mitigation and contingency strategies for managing supply-chain disruption risks. Management Sci. (2006) 52(5):639–657Link, Google Scholar
- . Disruption-management strategies for short life-cycle products. Naval Res. Logist. (2009) 56(4):318–347Crossref, Google Scholar
- , Camp LJ, Lewis S. System reliability and free riding. Economics and Information Security (2004) (Kluwer Academic Publishers, Boston) 1–16Crossref, Google Scholar
- . Mitigiating supply risk: Dual sourcing or process improvement? Manufacturing Service Oper. Management (2010) 12(3):489–510Link, Google Scholar
- . Using a dual-sourcing option in the presence of asymmetric information about supplier reliability: Competition vs. diversification. Manufacturing Service Oper. Management (2012) 14(2):202–217Link, Google Scholar
- . Equity: In Theory and Practice (1994) (Princeton University Press, Princeton, NJ) Google Scholar

