The Impact of New Product Introduction on Plant Productivity in the North American Automotive Industry

Published Online:https://doi.org/10.1287/mnsc.2013.1709

References

  • Abadie A, Imbens GW (2002) Simple and bias-corrected matching estimators for average treatment effects. NBER Working Paper 283, National Bureau of Economic Research, Cambridge, MA. http://www.nber.org/papers/t0283.CrossrefGoogle Scholar
  • Alden JM, Burns LD, Costy T, Hutton RD, Jackson CA, Kim DS, Kohls KA, Owen JH, Turnquist MA, Veen DJV (2006) General Motors increases its production throughput. Interfaces 36(1):6–25.LinkGoogle Scholar
  • Argote L, Epple D (1990) Learning curves in manufacturing. Science 247(4945):920–924.CrossrefGoogle Scholar
  • Argote L, Beckman SL, Epple D (1990) The persistence and transfer of learning in industrial settings. Management Sci. 36(2):140–154.LinkGoogle Scholar
  • Barnow BS, Cain G, Goldberger A (1981) Issues in the analysis of selectivity bias. Stromsdorfer E, Farkas G, eds. Evaluation Studies Review, Vol. 5 (Sage, Thousand Oaks, CA).Google Scholar
  • Benkard CL (2000) Learning and forgetting: The dynamics of aircraft production. Amer. Econom. Rev. 90:1034–1054.CrossrefGoogle Scholar
  • Bresnahan TF, Ramey VA (1994) Output fluctuations at the plant level. Quart. J. Econom. 109(3):593–624.CrossrefGoogle Scholar
  • Cachon G, Gallino S, Olivares M (2011) Severe weather and automobile assembly productivity. Working paper, University of Pennsylvania, Philadelphia.Google Scholar
  • Cachon GP, Olivares M (2010) Drivers of finished-goods inventory in the U.S. automotive industry. Management Sci. 56(1):202–216.LinkGoogle Scholar
  • Clark KB, Fujimoto T (1991) Product Development Performance: Strategy, Organization, and Management in the World Auto Industry (Harvard Business School Press, Cambridge, MA).Google Scholar
  • Cohen WM, Levinthal DA (1990) Absorptive capacity: A new perspective on learning and innovation. Admin. Sci. Quart. 35(1):128–152.CrossrefGoogle Scholar
  • De Groote X (1994) The flexibility of production processes: A general framework. Management Sci. 40(7):933–945.LinkGoogle Scholar
  • Dehejia RH, Wahba S (2002) Propensity score-matching methods for nonexperimental causal studies. Rev. Econom. Statist. 84(1):151–161.CrossrefGoogle Scholar
  • Epple D, Argote L, Murphy K (1996) An empirical investigation of the microstructure of knowledge acquisition and transfer through learning by doing. Oper. Res. 44(1):77–86.LinkGoogle Scholar
  • Fisher ML, Ittner CD (1999) The impact of product variety on automobile assembly operations: Empirical evidence and simulation analysis. Management Sci. 45(6):771–786.LinkGoogle Scholar
  • Fleischmann B, Ferber S, Henrich P (2006) Strategic planning of BMW's global production network. Interfaces 36(3):194–208.LinkGoogle Scholar
  • Gerwin D (1989) Manufacturing flexibility in the cam era. Bus. Horizons 32(1):78–84.CrossrefGoogle Scholar
  • Goyal M, Netessine S (2007) Strategic technology choice and capacity investment under demand uncertainty. Management Sci. 53(2):192–207.LinkGoogle Scholar
  • Goyal M, Netessine S (2011) Volume flexibility, product flexibility, or both: The role of demand correlation and product substitution. Manufacturing Service Oper. Management 13(2):180–193.LinkGoogle Scholar
  • Goyal M, Netessine S, Randall T (2006) Deployment of manufacturing flexibility: An empirical analysis of the North American automotive industry. Working paper, University of Utah, Salt Lake City.Google Scholar
  • Grant RM (1996) Toward a knowledge-based theory of the firm. Strategic Management J. 17:109–122.CrossrefGoogle Scholar
  • Hall GJ (2000) Non-convex costs and capital utilization: A study of production scheduling at automobile assembly plants. J. Monetary Econom. 45:681–716.CrossrefGoogle Scholar
  • Harbour Consulting (1995) 1995 Harbour Report (Harbour Consulting, Troy, MI).Google Scholar
  • Harbour Consulting (1999) 1999 Harbour Report (Harbour Consulting, Troy, MI).Google Scholar
  • Harbour Consulting (2000) 2000 Harbour Report (Harbour Consulting, Troy, MI).Google Scholar
  • Hatch NW, Mowery DC (1998) Process innovation and learning by doing in semiconductor manufacturing. Management Sci. 44(11):1461–1477.LinkGoogle Scholar
  • Haviland A, Nagin D (2005) Causal inferences with group based trajectory models. Psychometrika 70(3):557–578.CrossrefGoogle Scholar
  • Heckman JJ (1979) Sample selection bias as a specification error. Econometrica 47(1):153–161.CrossrefGoogle Scholar
  • Hendriks KB, Singhal VR (1997) Delays in the product introductions and the market value of the firm: The consequences of being late to the market. Management Sci. 43(4):422–436.LinkGoogle Scholar
  • Hopp W, Spearman ML (2008) Factory Physics, 3rd ed. (McGraw Hill Higher Education, New York).Google Scholar
  • Huber GP (1991) Organizational learning: The contributing processes and the literatures. Organ. Sci. 2(1):88–115.LinkGoogle Scholar
  • Jensen MC, Meckling WH (1995) Specific and general knowledge, and organizational structure. J. Appl. Corporate Finance 8(2):4–18.CrossrefGoogle Scholar
  • Jordan WC, Graves SC (1995) Principles on the benefits of manufacturing process flexibility. Management Sci. 41(4):577–594.LinkGoogle Scholar
  • Krishnan V, Ulrich KT (2001) Product development decisions: A review of the literature. Management Sci. 47(1):1–21.LinkGoogle Scholar
  • Levitt B, March JG (1988) Organizational learning. Annual Rev. Sociol. 14:319–340.CrossrefGoogle Scholar
  • Levitt SD, List JA, Syverson C (2011) How does learning by doing happen? Working paper, University of Chicago, Chicago.Google Scholar
  • Levy FK (1965) Adaption in the production process. Management Sci. 11(6):B136–B154.LinkGoogle Scholar
  • Lieberman MB, Demeester L (1999) Inventory reduction and productivity growth: Linkages in the Japanese automotive industry. Management Sci. 45(4):466–485.LinkGoogle Scholar
  • Lieberman MB, Lau LJ, Williams MD (1990) Firm-level productivity and management influence: A comparison of U.S. and Japanese automobile producers. Management Sci. 36(10):1193–1215.LinkGoogle Scholar
  • Luellen JK, Shadish WR, Clark MH (2005) Propensity scores: An introduction and experimental test. Eval. Rev. 29(6):530–558.CrossrefGoogle Scholar
  • MacDuffie JP, Sethuraman K, Fisher ML (1996) Product variety and manufacturing performance: Evidence from the international automotive assembly plant study. Management Sci. 42(3):350–369.LinkGoogle Scholar
  • Maddala GS (1983) Limited-Dependent and Qualitative Variables in Econometrics (Cambridge University Press, Cambridge, UK).CrossrefGoogle Scholar
  • Moreno A, Terwiesch C (2012) Pricing and production flexibility: An empirical analysis of the U.S. automotive industry. Working paper, University of Pennsylvania, Philadelphia.Google Scholar
  • Muffatto M (1999) Introducing a platform strategy in product development. Internat. J. Production Econom. 60–61:145–153.CrossrefGoogle Scholar
  • Muffatto M, Roveda M (2002) Product architecture and platforms: A conceptual framework. Internat. J. Tech. Management 24(1):1–16.CrossrefGoogle Scholar
  • Nelson RR, Winter SG (1982) An Evolutionary Theory of Economic Change (Harvard University Press, Cambridge, MA).Google Scholar
  • Ramachandran K, Krishnan V (2008) Design architecture and introduction timing for rapidly improving industrial products. Manufacturing Service Oper. Management 10(1):149–171.LinkGoogle Scholar
  • Ramdas K, Randall T (2008) Does component sharing help or hurt reliability? An empirical study in the automotive industry. Management Sci. 54(5):1922–1938.LinkGoogle Scholar
  • Röller L-H, Tombak MM (1993) Competition and investment in flexible technologies. Management Sci. 39(1):107–114.LinkGoogle Scholar
  • Rosenbaum PR, Rubin DB (1983) The central role of the propensity score in observational studies for causal effects. Biometrika 70(1):41–55.CrossrefGoogle Scholar
  • Rosenzweig ED, Easton GS (2010) Tradeoffs in manufacturing? A meta-analysis and critique of the literature. Production Oper. Management 19(2):127–141.CrossrefGoogle Scholar
  • Roumiantsev S, Netessine S (2007) What can be learned from classical inventory models? A cross-industry exploratory investigation. Manufacturing Service Oper. Management 9(4):409–429.LinkGoogle Scholar
  • Rubin DB (1973) Matching to remove bias in observational studies. Biometrics 29(1):159–183.CrossrefGoogle Scholar
  • Sethi AK, Sethi SP (1990) Flexibility in manufacturing: A survey. Internat. J. Flexible Manufacturing Systems 2(4):289–328.CrossrefGoogle Scholar
  • Smith BC, McAlinden S, Swiecki B (1998) World class vehicle launch timing. Automotive Design and Production (February 15), http://www.autofieldguide.com/articles/world-class-vehicle-launch-timing-part-1-of-6.Google Scholar
  • Stoll JD (2004) Krygier vows better productivity in 2004. WardsAuto (June 11), http://wardsauto.com/news-amp-analysis/krygier-vows-better-productivity-2004.Google Scholar
  • Syverson C (2011) What determines productivity? J. Econom. Literature 49(2):326–365.CrossrefGoogle Scholar
  • Szulanski G (1996) Exploring internal stickiness: Impediments to the transfer of best practice within the firm. Strategic Management J. 17:27–43.CrossrefGoogle Scholar
  • Terwiesch C, Bohn RE (2001) Learning and process improvement during production ramp-up. Internat. J. Production Econom. 70(1):1–19.CrossrefGoogle Scholar
  • Terwiesch C, Xu Y (2004) The copy-exactly ramp-up strategy: Trading-off learning with process change. IEEE Trans. Engrg. Management 51(1):70–84.CrossrefGoogle Scholar
  • Terwiesch C, Bohn RE, Chea KC (2001) International product transfer and production ramp-up: A case study from the data storage industry. R&D Management 31(4):435–451.CrossrefGoogle Scholar
  • Thornton RA, Thompson P (2001) Learning from experience and learning from others: An exploration of learning and spillovers in wartime shipbuilding. Amer. Econom. Rev. 91(5):1350–1368.CrossrefGoogle Scholar
  • Ulrich KT, Eppinger S (2007) Product Design and Development, 4th ed. (McGraw-Hill/Irvin, New York).Google Scholar
  • Van Biesebroeck J (2007) The cost of flexibility. Assembly Automation 27(1):55–64.CrossrefGoogle Scholar
  • Van Mieghem JA (1998) Investment strategies for flexible resources. Management Sci. 44(8):1071–1078.LinkGoogle Scholar
  • Vasilash GS (2004) GM's drive for flexibility. Automotive Design and Production (July 6), http://www.autofieldguide.com/articles/gm's-drive-for-flexibility.Google Scholar
  • von Hippel E (1994) “Sticky information” and the locus of problem solving: Implications for innovation. Management Sci. 40(4):429–439.LinkGoogle Scholar
  • Wooldridge JM (2002) Econometric Analysis of Cross-Section and Panel Data (MIT Press, Cambridge, MA).Google Scholar
  • Wright TP (1936) Factors affecting the cost of airplanes. J. Aeronautical Sci. 3(4):122–128.CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.