Incentive Alignment and Coordination of Project Supply Chains
Published Online:23 Mar 2016https://doi.org/10.1287/mnsc.2015.2373
References
- (1997) Incentive/disincentive provisions in highway contracts. J. Construction Engrg. Management 123(3):302–307.Crossref, Google Scholar
- (2005) Planning order releases for an assembly system with random operation times. OR Spectrum 27(2):459–470.Crossref, Google Scholar
- (2001) Incentives versus transaction costs: A theory of procurement contracts. RAND J. Econom. 32(3):387–407.Crossref, Google Scholar
- (2009) Auctions versus negotiations in procurement: An empirical analysis. J. Law, Econom., Organ. 25(2):372–399.Crossref, Google Scholar
- (1990) Sequencing with earliness and tardiness penalties: A review. Oper. Res. 38(1):22–36.Link, Google Scholar
- (2005) Coordination and incentive contracts in project management under asymmetric information. Working paper, University of Southern California, Los Angeles.Google Scholar
- (2007) Incentives and commonality in a decentralized multiproduct assembly system. Oper. Res. 55(4):630–646.Link, Google Scholar
- (2005) Contract Theory (MIT Press, Cambridge, MA).Google Scholar
- (2002) Incentive mechanisms for project succcess. J. Management Engrg. 18(1):37–43.Crossref, Google Scholar
- (2003) Supply chain coordination with contracts. Graves S, De Kok T, eds. Handbooks in Operations Research and Management Science: Supply Chain Management (Elsevier, Amsterdam), 227–339.Crossref, Google Scholar
- (2015) Incentive contracts in serial stochastic projects. Manufacturing Service Oper. Management 17(3):290–301.Link, Google Scholar
- (1993) Supply management in assembly systems. Naval Res. Logist. 40(7):933–950.Crossref, Google Scholar
- (1987) Pricing policies for quantity discounts. Management Sci. 33(10):1247–1252.Link, Google Scholar
- (2001) Project contracts and payment schedules: The client’s problem. Management Sci. 47(12):1654–1667.Link, Google Scholar
- (2002) Project Scheduling: A Research Handbook (Kluwer Academic Publishers, Norwell, MA).Google Scholar
- (1990) Project bidding under deterministic and probabilistic activity durations. Eur. J. Oper. Res. 49(1):14–34.Crossref, Google Scholar
- (2014) Optimal procurement design of an assembly supply chain with information asymmetry. Production Oper. Management 23(12):2075–2088.Crossref, Google Scholar
- (2008) Component procurement strategies in decentralized assemble-to-order systems with time-dependent pricing. Naval Res. Logist. 54(12):1997–2011.Google Scholar
- (2004) Revenue-sharing vs. wholesale-price contracts in assembly systems with random demand. Production Oper. Management 13(1):23–33.Crossref, Google Scholar
- (2002) A survey of the state-of-the-art of common due date assignment and scheduling research. Eur. J. Oper. Res. 139(1):1–25.Crossref, Google Scholar
- (1991) Parkinson’s law and its implications for project management. Management Sci. 37(8):990–1001.Link, Google Scholar
- (2000) Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Oper. Res. 48(6):927–938.Link, Google Scholar
- (2005) Project scheduling under uncertainty: Survey and research potentials. Eur. J. Oper. Res. 165(2):289–306.Crossref, Google Scholar
- (1993) Setting safety lead times for purchased components in assembly systems. IIE Trans. 25(2):2–11.Crossref, Google Scholar
- (2003) Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes. J. Comput. Civil Engrg. 17(1):10–18.Crossref, Google Scholar
- (1989) Component inventory costs in an assembly problem with uncertain supplier lead-times. IIE Trans. 21(2):112–121.Crossref, Google Scholar
- (2010a) Optimal time-based and cost-based coordinated project contracts with unobservable work rates. Internat. J. Production Econom. 126(2):247–254.Crossref, Google Scholar
- (2010b) Project management contracts with delayed payments. Manufacturing Service Oper. Management 12(4):692–707.Link, Google Scholar
- (2002) The Theory of Incentives: The Principal-Agent Model (Princeton University Press, Princeton, NJ).Crossref, Google Scholar
- (1993) A Theory of Incentive in Procurement and Regulation (MIT Press, Cambridge, MA).Google Scholar
- (1998) Supply chain contracting and coordination with stochastic demand. Tayur S, Ganeshan R, Magazine M, eds. Quantitative Models for Supply Chain Management (Kluwer Academic Publishers, Norwell, MA), 233–268.Google Scholar
- (1986) A generalized quantity discount pricing model to increase supplier’s profits. Management Sci. 32(9):1179–1187.Link, Google Scholar
- (1999) Decentralized multi-echelon supply chains: Incentives and information. Management Sci. 45(5):633–640.Link, Google Scholar
- (2000) Price protection in the personal computer industry. Management Sci. 46(4):467–482.Link, Google Scholar
- (2014) Moral hazard, incentive contracts, and risk: Evidence from procurement. Rev. Econom. Stud. 81(3):1201–1228.Crossref, Google Scholar
- (2011) Risk/Reward compensation model for civil engineering infrastructure alliance projects. J. Construction Engrg. Management 137(2):127–136.Crossref, Google Scholar
- (2003) Aligning the lean organization: A contractual approach. Martinez J, Formoso C, eds. 11th Annual Conf. Lean Construction, July 2003 (Virginia Polytechnic Institute and State University, Blacksburg).Google Scholar
- (2012) The impact of incentive mechanisms on project performance. Internat. J. Project Management 30(3):352–362.Crossref, Google Scholar
- (1984) A quantitative discount pricing model to increase vendor profits. Management Sci. 30(6):720–726.Link, Google Scholar
- (2000) Importance of capacity constraints to construction cost and schedule. J. Construction Engrg. Management 126(5):366–373.Crossref, Google Scholar
- (1985) Optimal pricing and return policies for perishable commodities. Marketing Sci. 4(2):166–176.Link, Google Scholar
- (2005) Simple probability models for project contracting. Eur. J. Oper. Res. 165(2):329–338.Crossref, Google Scholar
- (2012) Scheduling: Theory, Algorithms, and Systems (Springer, New York).Crossref, Google Scholar
- (2011) Motivation toward financial incentive goals on construction projects. J. Bus. Res. 64(7):765–773.Crossref, Google Scholar
- (2013) Supplier capabilities in large shipbuilding projects. Internat. J. Project Management 31(4):542–553.Crossref, Google Scholar
- (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management Econom. 24(8):869–881.Crossref, Google Scholar
- (1986) Bidding for contracts. Management Sci. 32(12):1533–1550.Link, Google Scholar
- (1995) Setting safety lead-times for purchased components in assembly systems: A general solution procedure. IIE Trans. 27(5):638–645.Crossref, Google Scholar
- (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. J. Construction Engrg. Management 130(1):84–93.Crossref, Google Scholar
- (2003) Supply chain operations: Assemble-to-order systems. Graves SC, De Kok T, eds. Handbooks in Operations Research and Management Science, Supply Chain Management: Design, Coordination and Operation, Vol 11 (Elsevier, Amsterdam), 561–596.Crossref, Google Scholar
- (2000) Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing Service Oper. Management 2(3):287–296.Link, Google Scholar
- (2006) Perspectives in supply chain risk management. Internat. J. Production Econom. 103(2):451–488.Crossref, Google Scholar
- (2009) Managing new product development and supply chain risks: The Boeing 787 case. Supply Chain Forum: An Internat. J. 10(2):74–86.Google Scholar
- (1998) Modeling supply chain contracts: A review. Tayur S, Ganeshan R, Magazine M, eds. Quantitative Models for Supply Chain Management (Springer, New York), 299–336.Google Scholar
- (2006) Prime contractor performance report. Publication M 41-40, Washington State Department of Transportation, Olympia, WA.Google Scholar
- (2006) Joint pricing-production decisions in supply chains of complementary products with uncertain demand. Oper. Res. 54(6):1110–1127.Link, Google Scholar
- (1987a) Setting planned lead times in serial production systems with tardiness costs. Management Sci. 33(1):95–106.Link, Google Scholar
- (1987b) Stochastic lead times in two-level assembly systems. IIE Trans. 19(4):371–378.Crossref, Google Scholar
- (2006) Competition, cooperation, and information sharing in a two-echelon assembly system. Manufacturing Service Oper. Management 8(3):273–291.Link, Google Scholar
- (2012) Kaibo engineering group corporation: Project procurement in libya, 2010. Case study, September 2012, Duke University, Durham, NC.Google Scholar

