Incentive Alignment and Coordination of Project Supply Chains

Published Online:https://doi.org/10.1287/mnsc.2015.2373

References

  • Arditi D, Khisty J, Yasamis F (1997) Incentive/disincentive provisions in highway contracts. J. Construction Engrg. Management 123(3):302–307.CrossrefGoogle Scholar
  • Axsater S (2005) Planning order releases for an assembly system with random operation times. OR Spectrum 27(2):459–470.CrossrefGoogle Scholar
  • Bajari P, Tadelis S (2001) Incentives versus transaction costs: A theory of procurement contracts. RAND J. Econom. 32(3):387–407.CrossrefGoogle Scholar
  • Bajari P, McMillan R, Tadelis S (2009) Auctions versus negotiations in procurement: An empirical analysis. J. Law, Econom., Organ. 25(2):372–399.CrossrefGoogle Scholar
  • Baker K, Scudder G (1990) Sequencing with earliness and tardiness penalties: A review. Oper. Res. 38(1):22–36.LinkGoogle Scholar
  • Bayiz M, Corbett CJ (2005) Coordination and incentive contracts in project management under asymmetric information. Working paper, University of Southern California, Los Angeles.Google Scholar
  • Bernstein F, DeCroix G, Wang Y (2007) Incentives and commonality in a decentralized multiproduct assembly system. Oper. Res. 55(4):630–646.LinkGoogle Scholar
  • Bolton P, Dewatripont M (2005) Contract Theory (MIT Press, Cambridge, MA).Google Scholar
  • Bower D, Ashby G, Gerald K, Smyk W (2002) Incentive mechanisms for project succcess. J. Management Engrg. 18(1):37–43.CrossrefGoogle Scholar
  • Cachon G (2003) Supply chain coordination with contracts. Graves S, De Kok T, eds. Handbooks in Operations Research and Management Science: Supply Chain Management (Elsevier, Amsterdam), 227–339.CrossrefGoogle Scholar
  • Chen T, Klastorin T, Wagner MR (2015) Incentive contracts in serial stochastic projects. Manufacturing Service Oper. Management 17(3):290–301.LinkGoogle Scholar
  • Chu C, Proth J, Xie X (1993) Supply management in assembly systems. Naval Res. Logist. 40(7):933–950.CrossrefGoogle Scholar
  • Dada M, Srikanth K (1987) Pricing policies for quantity discounts. Management Sci. 33(10):1247–1252.LinkGoogle Scholar
  • Dayanand N, Padman R (2001) Project contracts and payment schedules: The client’s problem. Management Sci. 47(12):1654–1667.LinkGoogle Scholar
  • Demeulemeester E, Herroelen W (2002) Project Scheduling: A Research Handbook (Kluwer Academic Publishers, Norwell, MA).Google Scholar
  • Elmaghraby S (1990) Project bidding under deterministic and probabilistic activity durations. Eur. J. Oper. Res. 49(1):14–34.CrossrefGoogle Scholar
  • Fang X, Ru J, Wang Y (2014) Optimal procurement design of an assembly supply chain with information asymmetry. Production Oper. Management 23(12):2075–2088.CrossrefGoogle Scholar
  • Fang X, So K, Wang Y (2008) Component procurement strategies in decentralized assemble-to-order systems with time-dependent pricing. Naval Res. Logist. 54(12):1997–2011.Google Scholar
  • Gerchak Y, Wang Y (2004) Revenue-sharing vs. wholesale-price contracts in assembly systems with random demand. Production Oper. Management 13(1):23–33.CrossrefGoogle Scholar
  • Gordon V, Proth J, Chu C (2002) A survey of the state-of-the-art of common due date assignment and scheduling research. Eur. J. Oper. Res. 139(1):1–25.CrossrefGoogle Scholar
  • Gutierrez G, Kouvelis P (1991) Parkinson’s law and its implications for project management. Management Sci. 37(8):990–1001.LinkGoogle Scholar
  • Gutierrez G, Paul A (2000) Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Oper. Res. 48(6):927–938.LinkGoogle Scholar
  • Herroelen W, Leus R (2005) Project scheduling under uncertainty: Survey and research potentials. Eur. J. Oper. Res. 165(2):289–306.CrossrefGoogle Scholar
  • Hopp W, Spearman M (1993) Setting safety lead times for purchased components in assembly systems. IIE Trans. 25(2):2–11.CrossrefGoogle Scholar
  • Kim K, Paulson B (2003) Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes. J. Comput. Civil Engrg. 17(1):10–18.CrossrefGoogle Scholar
  • Kumar A (1989) Component inventory costs in an assembly problem with uncertain supplier lead-times. IIE Trans. 21(2):112–121.CrossrefGoogle Scholar
  • Kwon H, Lippman S, Tang C (2010a) Optimal time-based and cost-based coordinated project contracts with unobservable work rates. Internat. J. Production Econom. 126(2):247–254.CrossrefGoogle Scholar
  • Kwon H, Lippman S, McCardle K, Tang C (2010b) Project management contracts with delayed payments. Manufacturing Service Oper. Management 12(4):692–707.LinkGoogle Scholar
  • Laffont J, Martimort D (2002) The Theory of Incentives: The Principal-Agent Model (Princeton University Press, Princeton, NJ).CrossrefGoogle Scholar
  • Laffont J, Tirole J (1993) A Theory of Incentive in Procurement and Regulation (MIT Press, Cambridge, MA).Google Scholar
  • Lariviere M (1998) Supply chain contracting and coordination with stochastic demand. Tayur S, Ganeshan R, Magazine M, eds. Quantitative Models for Supply Chain Management (Kluwer Academic Publishers, Norwell, MA), 233–268.Google Scholar
  • Lee H, Rosenblatt M (1986) A generalized quantity discount pricing model to increase supplier’s profits. Management Sci. 32(9):1179–1187.LinkGoogle Scholar
  • Lee H, Whang S (1999) Decentralized multi-echelon supply chains: Incentives and information. Management Sci. 45(5):633–640.LinkGoogle Scholar
  • Lee H, Padmanabhan V, Taylor T, Whang S (2000) Price protection in the personal computer industry. Management Sci. 46(4):467–482.LinkGoogle Scholar
  • Lewis G, Bajari P (2014) Moral hazard, incentive contracts, and risk: Evidence from procurement. Rev. Econom. Stud. 81(3):1201–1228.CrossrefGoogle Scholar
  • Love P, Davis P, Chevis R, Edwards D (2011) Risk/Reward compensation model for civil engineering infrastructure alliance projects. J. Construction Engrg. Management 137(2):127–136.CrossrefGoogle Scholar
  • Mathews O, Howell G, Mitropoulos P (2003) Aligning the lean organization: A contractual approach. Martinez J, Formoso C, eds. 11th Annual Conf. Lean Construction, July 2003 (Virginia Polytechnic Institute and State University, Blacksburg).Google Scholar
  • Meng X, Gallagher B (2012) The impact of incentive mechanisms on project performance. Internat. J. Project Management 30(3):352–362.CrossrefGoogle Scholar
  • Monahan J (1984) A quantitative discount pricing model to increase vendor profits. Management Sci. 30(6):720–726.LinkGoogle Scholar
  • O’Brien W, Fischer M (2000) Importance of capacity constraints to construction cost and schedule. J. Construction Engrg. Management 126(5):366–373.CrossrefGoogle Scholar
  • Pasternack B (1985) Optimal pricing and return policies for perishable commodities. Marketing Sci. 4(2):166–176.LinkGoogle Scholar
  • Paul A, Gutierrez G (2005) Simple probability models for project contracting. Eur. J. Oper. Res. 165(2):329–338.CrossrefGoogle Scholar
  • Pinedo M (2012) Scheduling: Theory, Algorithms, and Systems (Springer, New York).CrossrefGoogle Scholar
  • Rose T, Manley K (2011) Motivation toward financial incentive goals on construction projects. J. Bus. Res. 64(7):765–773.CrossrefGoogle Scholar
  • Ruuska I, Ahola T, Martinsuo M, Westerholm T (2013) Supplier capabilities in large shipbuilding projects. Internat. J. Project Management 31(4):542–553.CrossrefGoogle Scholar
  • Sacks R, Harel M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management Econom. 24(8):869–881.CrossrefGoogle Scholar
  • Samuelson W (1986) Bidding for contracts. Management Sci. 32(12):1533–1550.LinkGoogle Scholar
  • Shore H (1995) Setting safety lead-times for purchased components in assembly systems: A general solution procedure. IIE Trans. 27(5):638–645.CrossrefGoogle Scholar
  • Shr J, Chen WT (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. J. Construction Engrg. Management 130(1):84–93.CrossrefGoogle Scholar
  • Song J-S, Zipkin P (2003) Supply chain operations: Assemble-to-order systems. Graves SC, De Kok T, eds. Handbooks in Operations Research and Management Science, Supply Chain Management: Design, Coordination and Operation, Vol 11 (Elsevier, Amsterdam), 561–596.CrossrefGoogle Scholar
  • Song J-S, Yano C, Lerssrisuriya P (2000) Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty. Manufacturing Service Oper. Management 2(3):287–296.LinkGoogle Scholar
  • Tang C (2006) Perspectives in supply chain risk management. Internat. J. Production Econom. 103(2):451–488.CrossrefGoogle Scholar
  • Tang C, Zimmerman J (2009) Managing new product development and supply chain risks: The Boeing 787 case. Supply Chain Forum: An Internat. J. 10(2):74–86.Google Scholar
  • Tsay A, Nahmias S, Agrawal N (1998) Modeling supply chain contracts: A review. Tayur S, Ganeshan R, Magazine M, eds. Quantitative Models for Supply Chain Management (Springer, New York), 299–336.Google Scholar
  • Walker K (2006) Prime contractor performance report. Publication M 41-40, Washington State Department of Transportation, Olympia, WA.Google Scholar
  • Wang Y (2006) Joint pricing-production decisions in supply chains of complementary products with uncertain demand. Oper. Res. 54(6):1110–1127.LinkGoogle Scholar
  • Yano C (1987a) Setting planned lead times in serial production systems with tardiness costs. Management Sci. 33(1):95–106.LinkGoogle Scholar
  • Yano C (1987b) Stochastic lead times in two-level assembly systems. IIE Trans. 19(4):371–378.CrossrefGoogle Scholar
  • Zhang F (2006) Competition, cooperation, and information sharing in a two-echelon assembly system. Manufacturing Service Oper. Management 8(3):273–291.LinkGoogle Scholar
  • Zhu XT, Chen L (2012) Kaibo engineering group corporation: Project procurement in libya, 2010. Case study, September 2012, Duke University, Durham, NC.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.