Contracting for Product Support Under Information Asymmetry
References
- (2017) The potential of servicizing as a green business model. Management Sci. 63(5):1545–1562.Link, Google Scholar
- (2011) Asymmetric information and economies of scale in service contracting. Manufacturing Service Oper. Management 13(1):58–72.Link, Google Scholar
- (2010) Cost savings analysis of performance-based contracts for highway maintenance operations. J. Infrastructure Systems 16(4):251–263.Crossref, Google Scholar
- (2000) Information, contracting, and quality costs. Management Sci. 46(6):776–789.Link, Google Scholar
- (2015) Signaling new product reliability with after-sales service contracts. Management Sci. 61(8):1812–1829.Link, Google Scholar
- (2001) Warranty signalling and reputation. Management Sci. 47(9):793–807.Google Scholar
- (2018) Simple contracts to assure supply under noncontractible capacity and asymmetric cost information. Manufacturing Service Oper. Management 20(2):217–231.Link, Google Scholar
- (2012) The rise of the service economy. Amer. Econom. Rev. 102(6):2540–2569.Crossref, Google Scholar
- (2006) Procuring fast delivery: Sole sourcing with information asymmetry. Management Sci. 52(6):881–896.Link, Google Scholar
- (2012) Contracting and coordination under asymmetric production cost information. Production Oper. Management 21(2):345–360.Crossref, Google Scholar
- (2019) Contracting in medical equipment maintenance services: An empirical investigation. Management Sci. 65(3):1136–1150.Link, Google Scholar
- (2009) Quality improvement incentives and product recall cost sharing contracts. Management Sci. 55(7):1122–1138.Link, Google Scholar
- (2006) Winning in the aftermarket. Harvard Bus. Rev. 84(5):129–138.Google Scholar
- (1989) Near-optimal service constrained stocking policies for spare parts. Oper. Res. 37(1):104–117.Link, Google Scholar
- (2004) Designing supply contracts: Contract type and information asymmetry. Management Sci. 50(4):550–559.Link, Google Scholar
- Dimpy (2010) Typical numbers if you rent a Cessna 172. Accessed January 6, 2021, http://ask.metafilter.com/170634/How-much-does-it-cost-to-rentoperate-a-plane-as-a-private-pilot-compared-to-flying-on-a-standard-commercial-ticket.Google Scholar
- FSEconomy (2016) Aircraft cost of ownership. Accessed January 6, 2021, https://sites.google.com/site/fseoperationsguide/aircraft-details/aircraft-cost-of-ownership.Google Scholar
- (1981) The machine repair problem with heterogeneous populations. Oper. Res. 29(3):532–549.Link, Google Scholar
- (2012) Impact of performance-based contracting on product reliability: An empirical analysis. Management Sci. 58(5):961–979.Link, Google Scholar
- (1989) Adverse selection and moral hazard with risk neutral agents. Eur. Econom. Rev. 33(4):807–823.Crossref, Google Scholar
- (2008) Call center outsourcing contracts under information asymmetry. Management Sci. 54(4):793–807.Link, Google Scholar
- (2014) MRO on the Move: Outsourcing Maintenance, Repair and Operations (A.T. Kearney Ideas and Insights).Google Scholar
- (2007) Workforce agility in repair and maintenance environments. Manufacturing Service Oper. Management 9(2):168–184.Link, Google Scholar
- (2013) Optimal contracts for outsourcing of repair and restoration services. Oper. Res. 61(6):1295–1311.Link, Google Scholar
- (2000) Participation constraints in adverse selection models. J. Econom. Theory 93(1):1–47.Crossref, Google Scholar
- (2013) Reliability of manufacturing equipment in complex environments. Ann. Oper. Res. 201(1):231–254.Crossref, Google Scholar
- (2013) Guilt by association: Strategic failure prevention and recovery capacity investments. Management Sci. 59(7):1631–1649.Link, Google Scholar
- (2007) Performance contracting in after-sales service supply chains. Management Sci. 53(12):1843–1858.Link, Google Scholar
- (2010) Contracting for infrequent restoration and recovery of mission-critical systems. Management Sci. 56(9):1551–1567.Link, Google Scholar
- (2002) The Theory of Incentives: The Principal-Agent Model (Princeton University Press, Princeton, NJ).Crossref, Google Scholar
- (1993) A Theory of Incentives in Procurement and Regulation (MIT Press, Cambridge, MA).Google Scholar
- (2020) When less is more: Recovery technology investment and segmentation for uptime-centered services. Eur. J. Oper. Res. 286(1):267–281.Crossref, Google Scholar
- (1995) On countervailing incentives. J. Econom. Theory 66(1):238–263.Crossref, Google Scholar
- (1979) Incentive compatibility and the bargaining problem. Econometrica 47(1):61–74.Crossref, Google Scholar
- (2019) Is servicization a win-win strategy? Profitability and environmental implications of servicization. Manufacturing Service Oper. Management 21(3):674–691.Link, Google Scholar
- (2011) Supply chain sourcing under asymmetric information. Production Oper. Management 20:92–115.Crossref, Google Scholar
- (1992) Mechanism design for general screening problems with moral hazard. Econom. Theory 2:265–281.Crossref, Google Scholar
- (2010) Contracting for collaborative services. Management Sci. 56(5):849–863.Link, Google Scholar
- RP news wires (2006) Increased aircraft MRO outsourcing helps drive growth. Reliable Plant. Accessed January 6, 2021, http://www.reliableplant.com/Read/2210/increased–aircraft–mro–outsourc ing–helps–drive–growth–.Google Scholar
- (2000) Beyond Economic Growth (The World Bank).Google Scholar
- TechNavio (2016) Global MRO market for automation solutions 2016-2020. Accessed January 6, 2021, https://www.technavio.com/report/global-automation-mro-automation-solutions-market.Google Scholar
- (2000) A two-echelon repairable inventory system with stocking-center-dependent depot replenishment lead times. Management Sci. 46(11):1141–1453.Google Scholar
- WSJ (2016) As growth slows, China highlights transition from manufacturing to service. Accessed January 6, 2021, http://www.wsj.com/articles/as-growth-slows-china-highlights-transition-from-manufacturing-to-service-1453221751.Google Scholar
- (2015) Rationing capacity in advance selling to signal quality. Management Sci. 61(3):560–577.Link, Google Scholar
- (2018) Contract design by service providers with private effort. Management Sci. 64(6):2672–2689.Link, Google Scholar

