Note. Satisfying Due Dates in Large Job Shops

Published Online:https://doi.org/10.1287/mnsc.44.10.1442

References

  • Baker K. R., Su Z.-S. Sequencing with due-dates and early start times to minimize maximum tardiness. Naval Res. Logist. Quart. (1974) 21:171–176CrossrefGoogle Scholar
  • Baker K. R. Sequencing rules and due-date assignments in a job shop. Management Sci. (1984) 30(9):1093–1104LinkGoogle Scholar
  • Blackstone J. H., Phillips D. T., Hogg G. L. A state of the art survey of dispatching rules for manufacturing job shop operations. Internat. J. Production Res. (1982) 20(1):27–45CrossrefGoogle Scholar
  • Carlier J., Pinson E. An algorithm for solving the job shop problem. Management Sci. (1989) 35(2):164–176LinkGoogle Scholar
  • Carroll D. C. Heuristic sequencing of single and multiple component jobs. (1965) . Unpublished Ph.D. thesis MIT, Cambridge, MAGoogle Scholar
  • Chang F.-C. R. A study of factors affecting due-date predictability in a simulated dynamic job shop. J. Manufacturing Systems (1994) 13(6):393–400CrossrefGoogle Scholar
  • Demirkol E., Mehta S., Uzsoy R. Benchmarks for shop scheduling problems. (1996) . Research memorandum no. 96-4, School of Industrial Engineering, Purdue University, West Lafayette, INGoogle Scholar
  • Goldratt E. M., Cox J.The Goal (1984) (North River Press)Google Scholar
  • Jackson J. R. Scheduling a production line to minimize maximum tardiness. (1955) . Research report 43 Management Science Research Project, UCLA, Los Angeles, CAGoogle Scholar
  • Karsiti M. N., Cruz J. B., Mulligan J. H. Simulation studies of multilevel dynamic job shop scheduling using heuristic dispatching rules. J. Manufacturing Systems (1992) 11(5):346–358CrossrefGoogle Scholar
  • Lawrence S. R., Morton T. E. Patriarch: Hierarchical production scheduling. (1986) 87–97 National Bureau of Standards Special Publication 724Google Scholar
  • Miyazaki S. Combined scheduling system for reducing job tardiness in a job shop. Internat. J. Production Res. (1981) 19(2):201–211CrossrefGoogle Scholar
  • Rowe A. Towards a theory of scheduling. Indust. Engrg. (1960) 11( MarchGoogle Scholar
  • Suresh V., Chaudhuri D. Dynamic scheduling—A survey of research. Internat. J. Production Econom. (1993) 32:53–63CrossrefGoogle Scholar
  • Thompson M. Simulation based scheduling software improves cycle time. APICS: The Performance Advantage (1996) 6(8):58–61Google Scholar
  • Vepsalainen A. P. J., Morton T. E. Improving local priority rules with global lead-time estimates: A simulation study. J. Manufacturing & Oper. Management (1988) 1:102–118Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.