Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost
Published Online:1 Mar 2000https://doi.org/10.1287/mnsc.46.3.421.12064
References
- Living overtime: A factory workaholic. Wall Street Journal (1998) October 13):B1Google Scholar
- An analysis of a computer method of sequencing assembly line operations (1963) . Doctoral dissertation, University of California, Berkeley, CAGoogle Scholar
- A production line that balances itself. Oper. Res. (1996) 44:21–34Link, Google Scholar
- Assembly line balancing by linear programming. Oper. Res. (1960) 13:517–546Google Scholar
- Stochastic Models of Manufacturing Systems (1993) (Prentice-Hall, Englewood Cliffs, NJ) Google Scholar
- (1997) August 1). Personal communicationGoogle Scholar
- A dynamic programming approach to stochastic assembly line balancing. Management Sci. (1989) 35:459–471Link, Google Scholar
- Dynamic manning of long cycle assembly lines with learning effect. IIE Trans. (1986) 18:392–397Crossref, Google Scholar
- Assembly line balancing—a heuristic algorithm for variable operator performance levels. J. Industr. Engng. (1968) 19:618–629Google Scholar
- Order Statistics (1981) 2nd ed.(John Wiley & Sons, New York) Google Scholar
- Topics in the design of stochastic flow lines (1994) . Doctoral dissertation, University of Washington, Seattle, WAGoogle Scholar
- A worker-based approach for modeling variability in task completion times. IIE Trans. (1995) . ForthcomingGoogle Scholar
- Impact of material flow policies and goals on job outcomes. J. Appl. Psych. (1996) 81:121–132Crossref, Google Scholar
- The effect of pacing on worker performance. Internat. J. Production Res. (1962) 1:60–72Crossref, Google Scholar
- Assembly line balancing with resource dependent task times. Decision Sci. (1992) 23:343–364Crossref, Google Scholar
- Improving productivity by periodic performance evaluation: A Bayesian stochastic model. Management Sci. (1995) 41(10):1669–1678Link, Google Scholar
- Fast effective algorithms for simple assembly line balancing problems. Oper. Res. (1989) 37:916–924Link, Google Scholar
- Play for pay: Effects of inequity in a pay-for-performance context. Admin. Sci. Quart. (1992) 37:321–335Crossref, Google Scholar
- An heuristic method for balancing assembly lines. Western Electric Engng. (1968) 12(October):9–16Google Scholar
- Individual differences in output variability as a function of job complexity. J. Appl. Psych. (1990) 75(1):28–42Crossref, Google Scholar
- A new perspective on equity theory: The equity sensitivity construct. Acad. Management Rev. (1987) 12:222–234Crossref, Google Scholar
- A computing procedure for a line balancing problem. Management Sci. (1956) 2:261–272Link, Google Scholar
- Eine allgemaine Methode Zur Losung Kombinatorischer Probleme. Ablauf- und planungsforschung (1964) 5:133–153Google Scholar
- A preference order dynamic program for stochastic assembly line balancing. Management Sci. (1976) 22:1097–1104Link, Google Scholar
- A heuristic method of assembly line balancing. J. Industr. Engng. (1961) 12:292–298Google Scholar
- A study of work-time distributions on unpaced tasks. IIE Trans. (1987) 19:50–55Crossref, Google Scholar
- An exploratory study on stopping a paced line when incompletions occur. IIE Trans. (1987) 19:463–467Crossref, Google Scholar
- Effects of varying goal types and incentive systems on performance and satisfaction. Acad. Management J. (1976) 19:537–546Crossref, Google Scholar
- An experimental investigation and comparative evaluation of production line balancing techniques. Management Sci. (1970) 16:728–746Link, Google Scholar
- Assembly line balancing by partial enumeration. Ablauf- und planungsforschung (1967) 8:429–433Google Scholar
- A computational procedure for balancing zoned assembly lines (1957) . Research report 6-94801-1-R3, Westinghouse Research Laboratories, Pittsburgh, PAGoogle Scholar
- A taxonomy of pacing. Internat. J. Prod. Res. (1965) 4:69–74Crossref, Google Scholar
- The production rate of a series of work stations with variable service times. Internat. J. Production Res. (1973) 11:155–169Crossref, Google Scholar
- Worn out. Wall Street Journal (1994) September 29Google Scholar
- Designing a production line to maximize profit. IIE Trans. (1985) 17:117–120Crossref, Google Scholar
- Line Balancing (1970) (Machinery and Allied Products Institute, Washington, D.C.) Google Scholar
- Individual differences in productivity: An empirical test of estimates derived from studies of selection procedure utility. J. Appl. Psych. (1983) 68(3):407–414Crossref, Google Scholar
- Joint relation of experience and ability with job performance: Test of three hypotheses. J. Appl. Psych. (1988) 73(1):46–57Crossref, Google Scholar
- A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Sci. (1986) 32:445–463Link, Google Scholar
- Another look at work measurement. J. Indust. Engng. (1967) 18:202–218Google Scholar
- Deterministic equivalents for stochastic assembly line balancing. AIIE Trans. (1976) 8:280–282Crossref, Google Scholar
- An integer programming algorithm with network cuts for solving the assembly line balancing problem. Management Sci. (1984) 30:85–99Link, Google Scholar
- A Heuristic Program of Assembly Line Balancing (1961) (Prentice-Hall, New York) Google Scholar
- Fewer jobs filled as factories rely on overtime pay. New York Times (1993) May 16Google Scholar
- Incentives and cooperation: The joint effects of task and reward interdependence on group performance. J. Organ. Behavior (1997) 18:138–158Crossref, Google Scholar
- Assembly line balancing as generalized bin packing. Oper. Res. Letters (1982) 1:56–58Crossref, Google Scholar
- Mass Production Management (1972) (John Wiley & Sons, New York) Google Scholar

