Modeling and Analysis of Congestion in the Design of Facility Layouts
Published Online:1 May 2002https://doi.org/10.1287/mnsc.48.5.679.7800
References
- Next generation factory layouts: Research challenges and recent progress. Interfaces (2002) . ForthcomingLink, Google Scholar
- A review of open queueing network models of manufacturing systems. Queueing Systems (1992) 12:95–133Crossref, Google Scholar
- . Multi-product queueing networks with deterministic routing: Decomposition approach and the notion of interference. Management Sci. (1989) 35:851–878Link, Google Scholar
- Stochastic Models of Manufacturing Systems (1993) (Prentice Hall, Englewood Cliffs, NJ) Google Scholar
- The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system. Material Flow (1987) 4:17–32Google Scholar
- Minimizing work-in-process and material handling in the facilities layout problem. IIE Trans. (1997a) 29:29–36Crossref, Google Scholar
- On queueing network models and the quadratic assignment problem. (1997b) (College of Business and Management, University of Maryland, College Park, MD) . Technical reportGoogle Scholar
- Why workers are lining upfor jobs at this GM plant. Business Week (2000) October 2). 〈http://www.businessweek.com〉Google Scholar
- The effect of trailer scheduling on the layout of freight terminals. Transportation Sci. (1999) 33:419–428Link, Google Scholar
- Factory Physics (2000) 2nd ed.(Irwin/McGraw-Hill, New York) Google Scholar
- Stochastic modeling for automated material handling system design and control. Transportation Sci. (1996) 30:330–350Link, Google Scholar
- Approximate formulae for the delay in the queueing system GI/G/1. Congressbook, 8th Internat. Teletraffic Congress(Melbourne, Australia)235.1–235.8Google Scholar
- Simulation with Arena (1998) (McGraw-Hill, Boston, MA) Google Scholar
- Queueing Systems Volume 2: Computer Applications (1976) (John Wiley, New York) Google Scholar
- The plant layout problem in automated manufacturing systems. Ann. Oper. Res. (1990) 26:397–412Google Scholar
- Single and multiple period layout models for automated manufacturing systems. Eur. J. Oper. Res. (1991) 52:300–314Crossref, Google Scholar
- The facility layout problem: Recent and emerging trends and perspectives. J. Manufacturing Systems (1996) 15:351–366Crossref, Google Scholar
- Quadratic Assignment and Related Problems (1994) (DIMACS Series in Discrete Mathematics, American Mathematical Society, Providence, RI) Crossref, Google Scholar
- Car power. Business Week-International Edition (2000) OctoberGoogle Scholar
- Analysis of flow control in alternative manufacturing configurations. J. Dynamic System Measurement Control (1980) 102:141–147Crossref, Google Scholar
- Quick Response Manufacturing: A Comprehensive Approach to Reducing Lead Times (1998) (Productivity Press, Portland OR) Crossref, Google Scholar
- Material Flow Systems in Manufacturing (1994) (Chapman and Hall, London U.K.) Crossref, Google Scholar
- Facilities Planning (1996) 2nd ed.(John Wiley, New York) Google Scholar
- The queueing network analyzer. Bell System Tech. J. (1983a) 62:9Google Scholar
- Performance of the queueing network analyzer. Bell Systems Tech. J. (1983b) 63:1911–1979Google Scholar
- Approximations for the GI/G/m Queue. Production Oper. Management (1993) 2:114–161Crossref, Google Scholar
- Lean Thinking (1996) (Simon and Schuster, New York) Google Scholar
- FLQ: A software for facility layout with queueing. . Technical report—0015, Division of Industrial Engineering, Department of Mechanical Engineering, University of Minnesota, Minneapolis, MNGoogle Scholar

