The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem
Published Online:1 Jun 2003https://doi.org/10.1287/mnsc.49.6.718.16027
References
- The audit staff assignment problem: A comment. Accounting Rev. (1974) 572–574Google Scholar
- Elements of Sequencing and Scheduling (1993) (Dartmouth, Hanover NH) Google Scholar
- An interactive adult-staff scheduling decision support system. Accounting Rev. (1981) 56:801–812Google Scholar
- An interactive model for the CPA firm audit staff scheduling with precedence constraints and due dates. Accounting Rev. (1982) 57:125–140Google Scholar
- A decision support system for audit staff scheduling with precedence constraints and due dates. Accounting Rev. (1986) 61(4):726–735Google Scholar
- A state-of-the-art review of parallel-machine scheduling research. Eur. J. ce>Oper. Res. (1990) 47:271–292Crossref, Google Scholar
- Project scheduling with resource constraints: A branch and bound approach. Eur. J. ce>Oper. Res. (1987) 29:262–273Crossref, Google Scholar
- A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Sci. (1975) 21:944–955Link, Google Scholar
- A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Sci. (1992) 38:1803–1818Link, Google Scholar
- , Eu R. J. Application of production scheduling methods to external and internal audit scheduling. Oper. Res. (1991) 52:267–279Crossref, Google Scholar
- Audit scheduling with overlapping activities and sequence-dependent setup costs. Eur. J. Oper. Res. (1997) 97:22–33Crossref, Google Scholar
- Scheduling of project networks by job assignment. Management Sci. (1991) 37(12):1590–1602Link, Google Scholar
- The analysis of activity networks under generalized precedence relations (GPR). Management Sci. (1992) 38(9):1245–1263Link, Google Scholar
- Bounds on multiprocessing timing anomalies. SIAM J. Appl. Math. (1969) 17:416–429Crossref, Google Scholar
- A branch-and-bound solution to the general scheduling problem. Oper. Res. (1968) 16:353–361Link, Google Scholar
- Project Management: A Systems Approach to Planning, Scheduling, and Controlling (1984) (Van Nostrand Reinhold, New York) Google Scholar
- , Graves S. C. Sequencing and scheduling: Algorithms and complexity. Handbooks in Operations Research and Management Science (1993) 4(North-Holland, New York) 445–522Google Scholar
- Minimizing makespan in hybrid flowshops. Oper. Res. Lett. (1994) 16:149–158Crossref, Google Scholar
- Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Sci. (1993) 39(5):616–625Link, Google Scholar
- Project Management with CPM, PERT, and Precedence Diagramming (1983) (Van Nostrand Reinhold, New York) Google Scholar
- Heuristic Scheduling Systems (1993) (John Wiley & Sons, New York) Google Scholar
- Scheduling: Theory, Algorithms and Systems (2002) (Prentice-Hall, Englewood Cliffs, NJ) Google Scholar
- The two-stage assembly scheduling problem: Complexity and approximation. Oper. Res. (1995) 43(2):346–355Link, Google Scholar
- (1980) . Ph.D. dissertation Stanford University, Stanford, CAGoogle Scholar
- The audit staff assignment problem: A linear programming analysis. Accounting Rev. (1972) 443–453Google Scholar
- The value of processing flexibility in multipurpose machines. IIE Trans (2003) 35(8):1–12Crossref, Google Scholar

