Structural Properties of Lot Streaming in a Flow Shop
Published Online:1 Aug 1998https://doi.org/10.1287/moor.23.3.624
References
- Lot streaming to reduce cycle time in a flow shop. (1987) . Working paper no. 203, The Amos Tuck School of Business Administration, Dartmouth College, Hanover, NH Google Scholar
- An iterative procedure for lot streaming in job-shop scheduling. Comput. Indust. Engrg. (1993) 25 231 234 Crossref, Google Scholar
- The complexity of flowshop and jobshop scheduling. Math. Oper. Res. (1976) 1 117 129 Link, Google Scholar
- Lot streaming in three-stage production processes. Eur. J. Oper. Res. (1994) 75 378 394 Crossref, Google Scholar
- Structural properties of lot streaming in a flow shop (1994) . Preprint OR64, Faculty of Mathematical Studies, University of Southampton, U.K Google Scholar
- Optimal two- and three-stage production schedules with setup times included. Naval Res. Logist. Quart. (1954) 1 61 68 Crossref, Google Scholar
- A concise survey of efficiently solvable special cases of the permutation flow shop. RAIRO Rech. Oper. (1983) 17 105 119 Crossref, Google Scholar
- Flow shop scheduling with lot streaming. Oper. Res. Lett. (1989) 8 297 303 Crossref, Google Scholar
- Basic techniques for lot streaming. Oper. Res. (1993) 41 1065 1076 Link, Google Scholar
- Optimal lot streaming for multiple products in a two-machine flow shop. Eur. J. Oper. Res. (1995) 85 556 575 Crossref, Google Scholar
- Polynomial time algorithms for the m × 2 lot streaming problem (1992) . Research report 92-10, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL Google Scholar

