Maximum Profit Scheduling
Published Online:1 Jan 2008https://doi.org/10.1287/msom.1060.0144
References
- A deterministic inventory model with an inventory-level-dependent demand. Naval Res. Logist. (1988a) 35:99–116Crossref, Google Scholar
- A deterministic inventory system with an inventory-level-dependent demand rate. J. Oper. Res. Soc. (1988b) 39:823–831Crossref, Google Scholar
- “Stack them high, let 'em fly”: Lot-sizing policies when inventories stimulate demand. Management Sci. (2004) 50:630–644Link, Google Scholar
- Multi-phase algorithms for throughput maximization for real-time scheduling. J. Combin. Optim. (2000) 4:307–323Crossref, Google Scholar
- Business Statistics: Contemporary Decision Making (1997) 2nd ed.(West Publishing Company, St. Paul, MN) Google Scholar
- Time-Based Competition: The Next Battle Ground in American Manufacturing (1991) (Irwin/McGraw-Hill, Boston, MA) Google Scholar
- Sales Promotion: Concepts, Methods and Strategies (1990) (Prentice Hall, Englewood Cliffs, NJ) Google Scholar
- Supply Chain Logistics Management (2002) (McGraw-Hill, New York) Google Scholar
- Scheduling Algorithms (1998) 2nd ed.(Springer, Berlin, Germany) Crossref, Google Scholar
- Logistics and Supply Chain Management: Strategies for Reducing Cost and Improving Service (1998) 2nd ed.(Financial Times and Prentice Hall, London, UK) Google Scholar
- Beating the clock. Electronic Bus. (1989) 136:21–28Google Scholar
- Quoting customer lead-times. Management Sci. (1995) 41:43–57Link, Google Scholar
- Demand chain management in manufacturing and services: Web-based integration, drivers and performance. J. Oper. Management (2002) 20:729–745Crossref, Google Scholar
- Computers and Intractability: A Guide to the Theory of NP-Completeness (1979) (W. H. Freeman, San Francisco, CA) Google Scholar
- Periodic-review inventory models with inventory-level-dependent demand. Naval Res. Logist. (1994) 41:99–116Crossref, Google Scholar
- Economic ordering decisions with market choice flexibility. Naval Res. Logist. (2004) 51:117–136Crossref, Google Scholar
- Scheduling in robotic cells: Classification, two and three machine cells. Oper. Res. (1997) 45:421–439Link, Google Scholar
- Learning from toys: Lessons in managing supply chain risk from the toy industry. California Management Rev. (2001) 43:106–124Crossref, Google Scholar
- First-mover advantage: A synthesis, conceptual framework and research propositions. J. Marketing (1992) 56:33–52Crossref, Google Scholar
- A functional equation and its application to resource allocation and sequencing problems. Management Sci. (1969) 16:77–84Link, Google Scholar
- Demand chain excellence: A tale of two retailers. Supply Chain Management Rev. (2001) 5:40–46Google Scholar
- First-mover advantages. Strategic Management J. (1988) 9:941–958Crossref, Google Scholar
- The uncapacitated lot-sizing problem with sales and safety stocks. Math. Programming (2001) 89:487–504Crossref, Google Scholar
- An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Sci. (1968) 15:102–109Link, Google Scholar
- Production and Operations Analysis (1997) 3rd ed.(Irwin, Chicago, IL) Google Scholar
- Toyota Production System: Beyond Large-Scale Production (1988) (Productivity Press, Cambridge, MA) Google Scholar
- Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand. IIE Trans. (1998) 30:151–163Crossref, Google Scholar
- Combinatorial Optimization: Algorithms and Complexity (1982) (Prentice Hall, Englewood Cliffs, NJ) Google Scholar
- Scheduling: Theory, Algorithms and Systems (2002) 2nd ed.(Prentice Hall, Englewood Cliffs, NJ) Google Scholar
- Throughput maximization in flexible manufacturing systems. IIE Trans. (1994) 26:90–100Crossref, Google Scholar
- Operations in today's demand chain management framework. J. Oper. Management (2002) 20:667–673Crossref, Google Scholar
- A Study of the Toyota Production System from an Industrial Engineering Viewpoint (1989) rev. ed.(Productivity Press, Cambridge, MA) Google Scholar
- Various optimizers for single stage production. Naval Res. Logist. Quart. (1956) 3:59–66Crossref, Google Scholar
- The impact of some recent developments in e-business on the management of next generation manufacturing. Internat. J. Oper. Production Management (2001) 21:538–564Crossref, Google Scholar
- Optimal lead-time policies. Management Sci. (1999) 45:290–295Link, Google Scholar
- Strategic Logistics Management (2001) 4th ed.(McGraw-Hill/Irwin, New York) Google Scholar
- Supply chain coordination when demand is shelf-space-dependent. Manufacturing Service Oper. Management (2001) 3:82–87Link, Google Scholar
- Due date setting and priority sequencing in a multi-class M/G/1 queue. Management Sci. (1991) 37:363–374Link, Google Scholar
- Production and Operations Management (1993) 2nd ed.(Simon & Schuster, Needham Heights, MA) Google Scholar
- Pricing Computer Services: Incentive, Information and Queueing Effects (1988) . Unpublished doctoral dissertation, University of Rochester, Rochester, NYGoogle Scholar
- Improving service by informing customers about anticipated delays. Management Sci. (1999) 45:192–207Link, Google Scholar
- Consumer response to retail stockouts. J. Bus. Logist. (2001) 22:49–71Crossref, Google Scholar

