Load-Based POLCA: An Integrated Material Control System for Multiproduct, Multimachine Job Shops
Published Online:1 Apr 2008https://doi.org/10.1287/msom.1070.0174
References
- Order review and release strategies in a job shop environment: A review and a classification. Internat. J. Production Res. (1997) 35(2):399–420Crossref, Google Scholar
- The Goal: Excellence in Manufacturing (1984) (North River Press, New York) Google Scholar
- Factory Physics (2000) (Irwin/McGraw-Hill, New York) Google Scholar
- To pull or not to pull: What is the question? Manufacturing Service Oper. Management (2004) 6(2):133–148Link, Google Scholar
- Overview of kanban systems. Internat. J. Comput. Integrated Manufacturing (1996) 9(3):169–189Crossref, Google Scholar
- The implications of fit between planning environments and manufacturing planning and control methods. Internat. J. Oper. Production Management (2003) 23(8):872–900Crossref, Google Scholar
- ACLIPS: A capacity and lead time integrated procedure for scheduling. Management Sci. (1998) 44(11):1548–1561Link, Google Scholar
- Workload control concepts in job shops—A critical assessment. Internat. J. Production Econom. (1996) 46-47:535–548Crossref, Google Scholar
- Open queueing network models of dynamic job shops. Internat. J. Production Res. (1981) 19:255–266Crossref, Google Scholar
- CONWIP: A pull alternative to kanban. Internat. J. Production Res. (1990) 28(5):879–894Crossref, Google Scholar
- A review of production planning and control: The applicability of key concepts to the make-to-order industry. Internat. J. Production Res. (2005) 34(5):869–898Crossref, Google Scholar
- Quick Response Manufacturing, A Companywide Approach to Reducing Lead Times (1998) (Productivity Press, Portland, OR) Google Scholar
- How to plan and implement POLCA: A material control system for high-variety or custom-engineered products. (2003a) . Technical report, Center for Quick Response Manufacturing, University of Wisconsin, Madison, WIGoogle Scholar
- Planning and implementing POLCA: A card-based control system for high variety or custom engineered products. Proc. FAIM 2003: The Internat. Conf. Flexible Automation and Intelligent Manufacturing (2003b) Google Scholar
- The impact of lot sizing on queueing delays: Multi-product, multi-machine models. (1996) . Ph.D. thesis, Department of Applied Economics, Katholieke Universiteit Leuven, Leuven, BelgiumGoogle Scholar
- Advanced resource planning. Robotics Comput. Integrated Manufacturing (2003) 19:211–218Crossref, Google Scholar
- , Shanthikumar J. G., Yao D. D., Zijm W. H. M. Reflections on the use of stochastic manufacturing models for planning decisions. Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains (2003) (Kluwer Academic Publishers, Dordrecht, The Netherlands) 53–85Crossref, Google Scholar
- Improved lead time performance at Spicer Off-Highway. Interfaces (2000) 30(1):83–95Link, Google Scholar
- Manufacturing Planning and Control Systems for Supply Chain Management (2005) (McGraw Hill, New York) Google Scholar
- The queueing network analyzer. Bell System Tech. J. (1983) 62(9):2779–2815Crossref, Google Scholar
- Approximations for the GI/G/m queue. Production Oper. Management (1993) 2(2):114–161Crossref, Google Scholar
- The performance of a new material control and replenishment system: A simulation and comparative study. Proc. Quick Response Manufacturing 2000 Conf. (2000) (Society of Manufacturing Engineers, Dearborn, MI) 807–826Google Scholar

