Capacity Planning in the Semiconductor Industry: Dual-Mode Procurement with Options

Published Online:https://doi.org/10.1287/msom.1110.0361

References

  • Armbrust D. Now's the time. (2009) SIA Board Meeting PresentationNovember 5(SEMATECH, Albany, NY) . Retrieved August 18, 2010, http://www.sematech.org/corporate/messages/SIA_Oct27.pdfGoogle Scholar
  • Baker K. An experimental study of the effectiveness of rolling schedules in production planning. Decision Sci. (1977) 8(1):19–27CrossrefGoogle Scholar
  • Bassok Y., Anupindi R. Analysis of supply contracts with total minimum commitment. IIE Transactions (1997) 29(5):373–381CrossrefGoogle Scholar
  • Billington C., Johnson B., Triantis A. A real options perspective on supply management in high technology. J. Appl. Corporate Finance (2002) 15(2):32–43CrossrefGoogle Scholar
  • Cachon G. P., de Kok A. G., Graves S. C. Supply chain coordination with contracts. Handbooks in Operations Research and Management Science—Supply Chain Management: Design, Coordination and Operation (2003) (Elsevier, Amsterdam) 229–340Chap. 6CrossrefGoogle Scholar
  • Chao X., Chen H., Zheng S. Dynamic capacity expansion for a service firm with capacity deterioration and supply uncertainty. Oper. Res. (2009) 57(1):82–93LinkGoogle Scholar
  • Cohen M., Ho T. H., Ren Z. J., Terwiesch C. Measuring imputed cost in the semiconductor equipment supply chain. Management Sci. (2003) 49(12):1653–1670LinkGoogle Scholar
  • Daniel K. H., Scarf H. E., Gilford D. M., Shelly M. W. A delivery-lag inventory model with emergency. Multistage Inventory Models and Techniques (1963) (Stanford University Press, Stanford, CA) 32–46Google Scholar
  • Donohue K. L. Efficient supply contracts for fashion goods with forecast updating and two production modes. Management Sci. (2000) 46(11):1397–1411LinkGoogle Scholar
  • Entriken R., Infanger G. Decomposition and importance sampling for stochastic linear models. Energy (1990) 15(7–8):645–659CrossrefGoogle Scholar
  • Eppen G. D., Iyer A. V. Improved fashion buying with Bayesian updates. Oper. Res. (1997) 45(6):805–819LinkGoogle Scholar
  • Feng Q., Sethi S. P., Yan H., Zhang H. Are base-stock policies optimal in inventory problems with multiple delivery modes? Oper. Res. (2006) 54(4):801–807LinkGoogle Scholar
  • Fisher M., Raman A. Reducing the cost of demand uncertainty through accurate response to early sales. Oper. Res. (1996) 44(4):87–99LinkGoogle Scholar
  • Fleckenstein B. Intel's twin woes: Excess capacity, slack demand. (2004) . MSN.com. (July 19). Retrieved August 18, 2010, http://moneycentral.msn.com/content/P85429.aspGoogle Scholar
  • Friend I., Blume M. The demand for risky assets. Amer. Econom. Rev. (1975) 65(5):900–922Google Scholar
  • Fukuda Y. Optimal policies for the inventory problem with negotiable lead time. Management Sci. (1964) 10(4):690–708LinkGoogle Scholar
  • Graves S. C., Meal H. C., Dasu S., Qui Y., Axsater S., Schneeweiss C., Silver E. Two-stage production planning in a dynamic environment. Lecture Notes in Economics and Mathematical Systems, Multi-Stage Production Planning and Inventory Control (1986) 266(Springer-Verlag, Berlin) 9–43CrossrefGoogle Scholar
  • Hausman W. H. Sequential decision problems: A model to exploit existing forecast. Management Sci. (1969) 16(2):93–111LinkGoogle Scholar
  • Huang X. Capacity planning in a general supply chain with multiple contract types. (2008) . Unpublished doctoral dissertation, Department of Electrical Engineering and Computer Science, Massachusetts Institute of Technology, CambridgeGoogle Scholar
  • Hurley G., Jackson P., Levi R., Roundy R. O., Shmoys D. B. New policies for stochastic inventory control models—Theoretical and computational results. (2007) . Working paper, Cornell University, Ithaca, NYGoogle Scholar
  • Intel Corporation (2009) . Annual report. Retrieved July 28, 2010, http://www.intc.com/annuals.cfmGoogle Scholar
  • Johnson M. E., Lee C.-Y., Lee H. L. Dual sourcing strategies: Operational hedging and outsourcing to reducing risk in low-cost countries. Supply Chain Excellence in Emerging Economies (2005) (Springer Science+Business Media, New York) 113–133Chap. 5Google Scholar
  • Kanellos M. Soaring costs of chipmaking recast industry. (2003) . CNET News.com. (January 22). Retrieved August 18, 2010, http://news.cnet.com/2009–1001-981418.htmlGoogle Scholar
  • Leachman R. C. The economics of speed. Fab Engrg. Oper. (2007) November 20). http://www.feomag.com/documents.asp?grID=12&d_ID=12Google Scholar
  • Lian Z., Liu L., Zhu S. X. Rolling-horizon replenishment: Policies and performance analysis. Naval Res. Logist. (2010) 57(6):489–502CrossrefGoogle Scholar
  • Liu L., Parlar M., Zhu S. X. Pricing and lead time decisions in decentralized supply chains. Management Sci. (2007) 53(5):713–725LinkGoogle Scholar
  • Liu Q., van Ryzin G. Strategic capacity rationing when customers learn. Manufacturing Service Oper. Management (2011) 13(1):89–107LinkGoogle Scholar
  • Moore G. E. Cramming more components onto integrated circuits. Electronics Magazine (1965) April 19):114–117Google Scholar
  • Özer Ö., Wei W. Strategic commitments for an optimal capacity decision under asymmetric forecast information. Management Sci. (2006) 52(8):1238–1257LinkGoogle Scholar
  • Palaka K., Erlebacher S., Kro D. H. Lead time setting, capacity utilization, and pricing decisions under lead time dependent demand. IIE Trans. (1998) 30(2):151–163CrossrefGoogle Scholar
  • Shapiro A. Stochastic programming approach to optimization under uncertainty. Math. Programming (2008) 112(1):183–220CrossrefGoogle Scholar
  • Vaidyanathan V., Metcalf D., Martin D. Using capacity options to better enable our factory ramps. Intel Tech. J. (2005) 9(3):185–191CrossrefGoogle Scholar
  • Van Mieghem J. A. Capacity management, investment, and hedging: Review and recent developments. Manufacturing Service Oper. Management (2003) 5(4):269–302LinkGoogle Scholar
  • Wu S. D., Erkoc M., Karabuk S. Managing capacity in the high-tech industry: A review of literature. Engrg. Economist (2005) 50(2):125–158CrossrefGoogle Scholar
  • Wu S. D., Kempf K. G., Atan M. O., Aytac B., Shirodkar S. A., Mishra A. Improving new-product forecasting at Intel Corporation. Interfaces (2010) 40(5):385–396LinkGoogle Scholar
  • Yazlali Ö., Erhun F. Dual-supply inventory problem with capacity limits on order sizes and unrestricted ordering costs. IIE Trans. (2009) 41(8):716–729CrossrefGoogle Scholar
  • Yazlali Ö., Erhun F. Managing demand uncertainty with dual supply contracts on capacity and inventory: A heuristic approach. (2010) . Working paper, Stanford University, Stanford, CAGoogle Scholar
  • Yildirim I., Tan B., Karaesmen F. A multiperiod stochastic production planning and sourcing problem with service level constraints. OR Spectrum (2005) 27(2–3):471–489CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.