Noncooperative Games for Subcontracting Operations
Published Online:24 Oct 2012https://doi.org/10.1287/msom.1120.0410
References
- . Scheduling problems with two competing agents. Oper. Res. (2004) 52(2):229–242Link, Google Scholar
- . Subcontracting strategies with stochastic third-party capacity and tardiness penalty contracts. (2008) . Working paper, University of Oregon, EugeneGoogle Scholar
- . Coordination of outsourced operations to minimize weighted flow time and capacity booking costs. Manufacturing Services Oper. Management (2010) 12(2):236–255Link, Google Scholar
- . Multiprocessor scheduling with rejection. SIAM J. Discrete Math. (2000) 13(1):64–78Crossref, Google Scholar
- . Individual versus social optimization in the allocation of customers to alternative servers. Management Sci. (1983) 29(7):831–839Link, Google Scholar
- , de Kok AG, Graves SC. Supply chain coordination with contracts. Handbooks in Operations Research and Management Science: Supply Chain Management (2003) 11(Elsevier, Amsterdam) 229–340Crossref, Google Scholar
- . Capacity choice and allocation: Strategic behavior and supply chain performance. Management Sci. (1999) 45(8):1091–1108Link, Google Scholar
- . Coordination of outsourced operations at a third-party facility subject to booking, overtime, and tardiness costs. Oper. Res. (2012) 60(6):1436–1450Link, Google Scholar
- , Borm P, Peters H. Sequencing games: A survey. Chapters in Game Theory: In Honor of Stef Tijs (2002) (Kluwer Academic, Boston) 27–50Google Scholar
- . Sequencing games. Eur. J. Oper. Res. (1989) 40(3):344–351Crossref, Google Scholar
- . User delay costs and internal pricing for a service facility. Management Sci. (1990) 36(12):1502–1517Link, Google Scholar
- . Congestion tolls for Poisson queuing processes. Econometrica (1975) 43(1):81–92Crossref, Google Scholar
- . Techniques for scheduling with rejection. J. Algorithms (2003) 49(1):175–191Crossref, Google Scholar
- . Simple sequencing problems with interdependent costs. Games Econom. Behav. (2004) 48(2):271–291Crossref, Google Scholar
- . Preemptive scheduling with rejection. Math. Programming (2003) 94(2–3):361–374Crossref, Google Scholar
- . Optimum bribing for queue position. Oper. Res. (1967) 15(2):304–318Link, Google Scholar
- . Selling to the newsvendor: An analysis of price-only contracts. Manufacturing Service Oper. Management (2001) 3(4):293–305Link, Google Scholar
- . Pricing, production, scheduling, and delivery-time competition. Oper. Res. (1994) 45(3):407–420Link, Google Scholar
- . The value of information sharing in a two-level supply chain. Management Sci. (2000) 46(5):626–643Link, Google Scholar
- . Boeing scrambles to repair problems with new plane. Wall Street Journal (2007) December 7):A1Google Scholar
- . More delays plague Boeing's dreamliner. Wall Street Journal (2008) January 16):A3Google Scholar
- . Optimal incentive-compatible priority pricing for the M/M/1 queue. Oper. Res. (1990) 38(5):870–883Link, Google Scholar
- . Non-cooperative games. Ann. Math. (1951) 54(2):286–295Crossref, Google Scholar
- . Preemptive multiprocessor scheduling with rejection. Theoret. Comput. Sci. (2001) 262(1–2):437–458Crossref, Google Scholar
- , Dehne F, Sack JR, Smid M. Algorithms and approximation schemes for minimum lateness/tardiness scheduling with rejection. Algorithms and Data Structures (2003) 2748(Springer, New York) 79–90Lecture Notes in Computer ScienceCrossref, Google Scholar
- . A survey of scheduling with controllable processing times. Discrete Appl. Math. (2007) 155(13):1643–1666Crossref, Google Scholar
- . Cores of convex games. Internat. J. Game Theory (1971) 1(1):11–26Crossref, Google Scholar
- . Coordinating investment, production and subcontracting. Management Sci. (1999) 45(7):954–971Link, Google Scholar
- . Scheduling two agents with controllable processing times. Eur. J. Oper. Res. (2010) 205(3):528–539Crossref, Google Scholar
- . Boeing is delaying delivery of its 787. Wall Street Journal (2007) October 11):A1Google Scholar

