On the Value of Input Efficiency, Capacity Efficiency, and the Flexibility to Rebalance Them

Published Online:https://doi.org/10.1287/msom.2013.0444

References

  • Anupindi R, Jiang L (2008) Capacity investment under postponement strategies, market competition, and demand uncertainty. Management Sci. 54(11):1876–1890.LinkGoogle Scholar
  • Ata B, Lee D, Tongarlak MH (2012) Optimizing organic waste to energy operations. Manufacturing Service Oper. Management 14(2):231–244.LinkGoogle Scholar
  • Bouallagui H, Ben Cheikh R, Marouani L, Hamdi MC (2003) Mesophilic biogas production from fruit and vegetable waste in a tubular digester. Bioresource Tech. 86(1):85–89.CrossrefGoogle Scholar
  • Carrillo JE, Gaimon C (2000) Improving manufacturing performance through process change and knowledge creation. Management Sci. 46(2):265–288.LinkGoogle Scholar
  • Chod J, Rudi N (2005) Resource flexibility with responsive pricing. Oper. Res. 53(3):532–548.LinkGoogle Scholar
  • Consecana (2006) Manual do Consecana, Anexo II, Capitulo III, Art 9, §3.Google Scholar
  • Gaimon C (2008) The management of technology: A production and operations management perspective. Production Oper. Management 17(1):1–11.CrossrefGoogle Scholar
  • Gerwin D (1993) Manufacturing flexibility: A strategic perspective. Management Sci. 39(4):395–410.LinkGoogle Scholar
  • Gillingham K, Linn J, Weyant J (2012) Authors' telephone and email interviews with leading energy- and climate-policy researchers that focus on energy efficiency, conducted during October 2012.Google Scholar
  • Gillingham K, Newell RG, Pizer WA (2008) Modeling endogenous technological change for climate policy analysis. Energy Econom. 30(6):2734–2753.CrossrefGoogle Scholar
  • Goyal M, Netessine S (2011) Volume flexibility, product flexibility or both: The role of demand correlation and product substitution. Manufacturing Service Oper. Management 13(2):180–193.LinkGoogle Scholar
  • Guzman D, Taylor J, Landress L, Balboa B, Lemos W (2012) U.S. biofuels market faces challenges. ICIS Chemical Bus. 281(2):22.Google Scholar
  • Hicks J (1932) The Theory of Wages (Macmillan, London).Google Scholar
  • Intergovernmental Panel on Climate Change (2007) Contribution of Working Group III to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change. Metz B, Davidson OR, Bosch PR, Dave R, Meyer LA, eds. (Cambridge University Press, Cambridge, UK).Google Scholar
  • Jira FC, Lee D (2012) Energy efficiency: Picking up the twenty dollar bill. Working paper, Harvard Business School, Boston.Google Scholar
  • Lapre MA, Mukherjee AS, van Wassenhove LN (2000) Behind the learning curve: Linking learning activities to waste reduction. Management Sci. 46(2):265–288.LinkGoogle Scholar
  • Lievense J (2010) Authors' telephone interview with Amyris Senior Vice President for Process Development and Manufacturing, July 23, 2010.Google Scholar
  • Linn J (2008) Energy prices and the adoption of energy-saving technology. Econom. J. 118(533):1986–2012.Google Scholar
  • Melo J, Renninger N, Portela M, Richardson J, Hilleman J, Diniz P, Velasco J (2011) Analyst and investor day. Presentation by Amyris executives to analysts and investors, September 12, 2011; webcast and published online.Google Scholar
  • Metcalf GE, Hassett KA (1993) Energy conservation investment: Do consumers discount the future correctly? Energy Policy 21(6):710–716.CrossrefGoogle Scholar
  • Mills DE (1984) Demand fluctuations and endogenous firm flexibility. J. Indust. Econom. 33(1):55–71.CrossrefGoogle Scholar
  • Mufson S (2012) First solar to close German plants, lay off 2,000 workers. The Washington Post (April 17), http://articles.washingtonpost.com/2012-04-17/business/35451366_1_first-solar-solar-panel-thin-film-panels.Google Scholar
  • Seay S (2012) Low gas costs may not be enough to spur large fertilizer expansion. Platts McGraw Hill Financial (January 27), http://www.platts.com/RSSFeedDetailedNews/RSSFeed/NaturalGas/3915346.Google Scholar
  • Sethi AK, Sethi SP (1990) Flexibility in manufacturing: A survey. Internat. J. Flexible Manufacturing Systems 2(4):289–328.CrossrefGoogle Scholar
  • Stewart R (2012) Wind turbine blade production—New products keep pace as scale increases. Reinforced Plastics 56(1):18–25.CrossrefGoogle Scholar
  • Tanrisever F, Erzurumlu SS, Joglekar N (2012) Production, process investment and the survival of debt-financed startup firms. Production Oper. Management 21(4):637–652.CrossrefGoogle Scholar
  • Terwiesch C, Xu Y (2004) The copy-exactly ramp-up strategy: Trading-off learning with process change. IEEE Trans. Engrg Management 51(1):70–84.CrossrefGoogle Scholar
  • Tombak M, DeMeyer A (1988) Flexibility and FMS: An empirical analysis. IEEE Trans. Engrg Management 35(2):101–107.CrossrefGoogle Scholar
  • U.S. Department of Energy (2007) U.S. energy requirements for aluminum production: Historical perspective, theoretical limits and current practices. Preface. Accessed July 19, 2013, http://www1.eere.energy.gov/industry/aluminum/pdfs/al_theoretical.pdf.Google Scholar
  • Wiser R, Bolinger M, Barbose G (2007) Using the federal production tax credit to build a durable market for wind power in the United States. Electricity J. 20(9):77–88.CrossrefGoogle Scholar
  • Zuretti H (2006) Authors' interview and plant tour with BP Solar Expansion Project Manager, Frederick, MD, November 8.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.