Coil Batching to Improve Productivity and Energy Utilization in Steel Production

Published Online:https://doi.org/10.1287/msom.2015.0558

References

  • Aho AV, Garey MR, Ullman JD (1972) The transitive reduction of a directed graph. SIAM J. Comput. 1(2):131–137.CrossrefGoogle Scholar
  • Avella P, Vasil’ev I (2005) A computational study of a cutting plane algorithm for university course timetabling. J. Scheduling 8(6):497–514.CrossrefGoogle Scholar
  • Balakrishnan A, Geunes J (2003) Production planning with flexible product specifications: An application to specialty steel manufacturing. Oper. Res. 51(1):94–112.LinkGoogle Scholar
  • Baldacci R, Christofides N, Mingozzi A (2008) An exact algorithm for the vehicle routing problem based on the set partitioning formulation with additional cuts. Math. Programming 115(2):351–385.CrossrefGoogle Scholar
  • Barnhart C, Johnson EL, Nemhauser GL, Savelsbergh MWP, Vance PH (1998) Branch-and-price: Column generation for solving huge integer programs. Oper. Res. 46(3):316–329.LinkGoogle Scholar
  • Bianco L, Mingozzi A, Ricciardelli S (1994) A set partitioning approach to the multiple depot vehicle scheduling problem. Optim. Methods Software 3(1–3):163–194.CrossrefGoogle Scholar
  • Chekuri C, Khanna S (2006) A PTAS for the multiple Knapsack problem. SIAM J. Comput. 35(3):713–728.CrossrefGoogle Scholar
  • Chu CB, Antonio J (1999) Approximation algorithms to solve real-life multicriteria cutting stock problems. Oper. Res. 47(4):495–508.LinkGoogle Scholar
  • Dawande M, Kalagnanam J, Keskinocak P, Ravi P, Salman F (2000) Approximation algorithms for the multiple knapsack problem with assignment restrictions. J. Combinatorial Optim. 4(2):171–186.CrossrefGoogle Scholar
  • Dutta G, Fourer R (2001) A survey of mathematical programming applications in integrated steel plants. Manufacturing Service Oper. Management 3(4):387–400.LinkGoogle Scholar
  • Glover F (1998) A template for scatter search and path relinking. Hao JK, Lutton E, Ronald E, Schoenauer M, Snyers D, eds. Artificial Evolution, Lecture Notes in Computer Science, Vol. 1363 (Springer, Heidelberg, Germany), 13–54.CrossrefGoogle Scholar
  • Hadjar A, Marcotte O, Soumis F (2006) A branch-and-cut algorithm for the depot vehicle scheduling problem. Oper. Res. 54(1):130–149.LinkGoogle Scholar
  • Höhn W, Jacobs T, Megow N (2012) On Eulerian extension and their application to no-wait flowshop scheduling. J. Scheduling 15(3):295–309.CrossrefGoogle Scholar
  • Höhn W, König FG, Möhring RH (2011) Integrated sequencing and scheduling in coil coating. Management Sci. 57(4):647–666.LinkGoogle Scholar
  • Kalagnanam JR, Dawande MW, Trumbo M, Lee HS (2000) The surplus inventory matching problem in the process industry. Oper. Res. 48(4):505–516.LinkGoogle Scholar
  • Kellerer H, Pferschy U, Pisinger D (2004) Knapsack Problems (Springer, Berlin).CrossrefGoogle Scholar
  • König FG, Lübbecke M, Möhring R, Schäfer G, Spenke I (2007) Solutions to real-world instances of PSPACE-complete stacking. Arge L, Hoffman M, Welzl E, eds. Algorithms: ESA 2007, Vol. 4698 (Springer, New York), 729–740.CrossrefGoogle Scholar
  • Lee C-Y, Uzsoy R, Martin-Vega LA (1992) Efficient algorithms for scheduling semiconductor burn-in operations. Oper. Res. 40(4):764–775.LinkGoogle Scholar
  • Lin J-H, Vitter JS (1992) ε-approximations with minimum packing constraint violation. Proc. 24th Annual ACM Sympos. Theory Comput. (ACM, New York), 771–782.Google Scholar
  • Lübbecke ME, Desrosiers J (2005) Selected topics in column generation. Oper. Res. 53(6):1007–1023.LinkGoogle Scholar
  • Martello S, Toth P (1990) Knapsack Problems: Algorithms and Computer Implementations (John Wiley & Sons, Hoboken, NJ).Google Scholar
  • Megiddo N, Supowit J (1984) On the complexity of some common geometric location problems. SIAM J. Comput. 13(1):182–196.CrossrefGoogle Scholar
  • Möhring RH, Andreas SS, Stork F, Uetz M (2003) Solving project scheduling problems by minimum cut computations. Management Sci. 49(3):330–350.LinkGoogle Scholar
  • Moon S, Hrymak AN (1999) Scheduling of the batch annealing process-deterministic case. Comput. Chemical Engrg. 23(9):1193–1208.CrossrefGoogle Scholar
  • Naphade KS, Wu SD, Storer RH, Doshi BJ (2001) Melt scheduling to trade off material waste and shipping performance. Oper. Res. 49(5):629–645.LinkGoogle Scholar
  • Nemhauser GL, Wolsey LA (1988) Integer and Combinatorial Optimization (John Wiley & Sons, Hoboken, NJ).CrossrefGoogle Scholar
  • Prasad P, Maravelias T (2008) Batch selection, assignment and sequencing in multi-stage multi-product processes. Comput. Chemical Engrg. 32(6):1106–1119.CrossrefGoogle Scholar
  • Ranjbar M (2008) Solving the resource-constrained project scheduling problem using filter-and-fan approach. Appl. Math. Comput. 201(1–2):313–318.CrossrefGoogle Scholar
  • Rego C, Duarte R (2009) A filter-and-fan approach to the job shop scheduling problem. Eur. J. Oper. Res. 194(3):650–662.CrossrefGoogle Scholar
  • Rego C, Li H, Glover F (2011) A filter-and-fan approach to the 2D HP model of the protein folding problem. Ann. Oper. Res. 188(1):389–414.CrossrefGoogle Scholar
  • Tang LX, Jiang SJ (2009) The charge batching planning problem in steelmaking process using Lagrangian relaxation algorithm. Indust. Engrg. Chem. Res. 48(16):7780–7787.CrossrefGoogle Scholar
  • Tang LX, Wang G (2008) Decision support system for the batching problems of steelmaking and continuous-casting production. Omega 36(6):976–991.CrossrefGoogle Scholar
  • Tang LX, Wang G, Chen Z-L (2014) Integrated charge batching and casting width selection at Baosteel. Oper. Res. 62(4):772–787.LinkGoogle Scholar
  • Tang LX, Wang G, Liu JY (2011) A combination of Lagrangian relaxation and column generation for order batching in steelmaking and continuous-casting production. Naval Res. Logist. 58(4):370–388.CrossrefGoogle Scholar
  • Tang LX, Xie X, Liu JY (2009) Scheduling of a single crane in batch annealing process. Comput. Oper. Res. 36(10):2853–2865.CrossrefGoogle Scholar
  • Tang LX, Liu JY, Rong AY, Yang ZH (2000) A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron and Steel Complex. Eur. J. Oper. Res. 124(2):267–282.CrossrefGoogle Scholar
  • Tang LX, Liu JY, Rong AY, Yang ZH (2001) A review of planning and scheduling systems and methods for integrated steel production. Eur. J. Oper. Res. 133(1):1–20.CrossrefGoogle Scholar
  • Vonderembse MA, Haessler RW (1982) A mathematical programming approach to schedule master slab casters in the steel industry. Management Sci. 28(12):1450–1461.LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.