Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems

Published Online:https://doi.org/10.1287/msom.2015.0565

References

  • ASML (2014) ASML Annual Report 2013. Accessed February 18, 2015, http://www.asml.com/asml/show.do?ctx=49757.Google Scholar
  • Axsäter S (2005) Planning order releases for an assembly system with random operation times. OR Spectrum 27(2):459–470.CrossrefGoogle Scholar
  • Buzacott J, Shanthikumar J (1994) Safety stock versus safety time in MRP controlled production systems. Management Sci. 40(5):1678–1689.LinkGoogle Scholar
  • Chauhan S, Dolgui A, Proth J-M (2009) A continuous model for supply planning of assembly systems with stochastic component procurement times. Internat. J. Production Econom. 120(2):411–417.CrossrefGoogle Scholar
  • Chhaochhria P, Graves S (2013) A forecast-driven tactical planning model for a serial manufacturing system. Internat. J. Production Res. 51(23–24):6860–6879.CrossrefGoogle Scholar
  • Clark J, Scarf H (1960) Optimal policies for a multi-echelon inventory problem. Management Sci. 6(4):475–490.LinkGoogle Scholar
  • de Kok T, Fransoo J (2003) Planning supply chain operations: Definitions and Comparison of Planning Concepts. de Kok T, Graves S, eds. Handbooks in Operations Research and Management Science (Elsevier, Amsterdam), 597–677.CrossrefGoogle Scholar
  • Diks E, de Kok T (1998) Optimal control of a divergent multi-echelon inventory system. Eur. J. Oper. Res. 111(1):75–97.CrossrefGoogle Scholar
  • Diks E, de Kok T (1999) Computational results for the control of a divergent N-echelon inventory system. Internat. J. Production Econom. 59(1–3):327–336.CrossrefGoogle Scholar
  • Goldratt E, ed. (1997) Critical Chain (North River Press, Great Barrington, MA), 1–246.Google Scholar
  • Gong L, de Kok T, Ding J (1994) Optimal leatimes planning in a serial production system. Management Sci. 40(5):629–632.LinkGoogle Scholar
  • Hashamdar H, Ibrahim Z (2010) A new method of dynamic analysis structures by using advance mathematical. Asian J. Appl. Sci. 3(3):186–196.CrossrefGoogle Scholar
  • Hicks C (2004) A genetic algorithm tool for designing manufacturing facilities in the capital goods industry. Internat. J. Production Econom. 90(2):199–211.CrossrefGoogle Scholar
  • Hicks C, Pongcharoen P (2006) Dispatching rules for production scheduling in the capital goods industry. Internat. J. Production Econom. 104(1):154–163.CrossrefGoogle Scholar
  • Hopp W, Spearman M (1993) Setting safety leadtimes for purchased components in assembly systems. IIE Trans. 25(2):2–11.CrossrefGoogle Scholar
  • Kanet J, Christy D (1984) Manufacturing systems with forbidden early order departure. Internat. J. Production Res. 22(1):41–50.CrossrefGoogle Scholar
  • Matsuura H, Tsubone H (1993) Setting planned lead times in capacity requirements planning. J. Oper. Res. Soc. 44(8):809–816.CrossrefGoogle Scholar
  • Matsuura H, Tsubone H, Kanezashi M (1996) Setting planned lead times for multi-operation jobs. Eur. J. Oper. Res. 88(2):287–303.CrossrefGoogle Scholar
  • Molinder A (1997) Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system. Internat. J. Production Res. 35(4):983–994.CrossrefGoogle Scholar
  • Press W, Teukolsky S, Vetterling W, Flannery B, eds. (2007) Numerical Recipes: The Art of Scientific Computing (Cambridge University Press, New York), 490–522.Google Scholar
  • Rosling K (1989) Optimal inventory policies for assembly systems under random demand. Oper. Res. 37(4):565–579.LinkGoogle Scholar
  • Rosso D (2014) Semiconductor industry posts record sales in 2013. Semiconductor Indust. Assoc. (February 3), http://www.semiconductors.org/news/2014/02/03/global_sales_report_2013/semiconductor_industry_posts_record_sales_in_2013/.Google Scholar
  • Song D, Earl C, Hicks C (2001) Stage due date planning for multistage assembly systems. Internat. J. Production Res. 39(9):1943–1954.CrossrefGoogle Scholar
  • Teo C, Bhatnagar R, Graves S (2011) Setting planned lead times for a make-to-order production system under master schedule smoothing. IIE Trans. 43(6):399–414.CrossrefGoogle Scholar
  • Teo C, Bhatnagar R, Graves S (2012) An application of master schedule smoothing and planned lead time control. Production Oper. Management 21(2):211–223.CrossrefGoogle Scholar
  • Weeks J (1981) Optimizing planned lead times and delivery dates. 21th Ann. Conf. Proc., Amer. Production and Inventory Control Soc., 177–188.Google Scholar
  • Whitt W (1982) Approximating a point process by a renewal process, I: Two basic methods. Oper. Res. 30(1):125–147.LinkGoogle Scholar
  • Whybark D, Williams J (1976) Material requirements planning under uncertainty. Decision Sci. 7(4):595–606.CrossrefGoogle Scholar
  • Yano CA (1987a) Setting planned leadtimes in serial production systems with tardiness costs. Management Sci. 33(1):95–106.LinkGoogle Scholar
  • Yano CA (1987b) Stochastic leadtimes in two-level assembly systems. IIE Trans. 19(4):371–378.CrossrefGoogle Scholar
  • Yano CA (1987c) Stochastic leadtimes in two-level distribution-type networks. Naval Res. Logist. 34(6):831–843.CrossrefGoogle Scholar
  • Zipkin P, ed. (2000) Foundations of Inventory Management (Irwin/McGraw-Hill, New York).Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.