Optimal Policies for a Multi-Echelon Inventory Problem with Service Time Target and Expediting
Published Online:15 Mar 2022https://doi.org/10.1287/msom.2022.1079
References
- Amazon.com (2021). Prime insider. Accessed June 28, 2021, https://www.amazon.com/primeinsider/about?ref=primenav_benefitsGoogle Scholar
- (2019) The big data newsvendor: Practical insights from machine learning. Oper. Res. 67:90–108.Link, Google Scholar
- (1996) Exploiting timely demand information to reduce inventories. Eur. J. Oper. Res. 92:239–253.Crossref, Google Scholar
- (1960) Optimal policies for a multi-echelon inventory problem. Management Sci. 6:475–490.Link, Google Scholar
- (2006) Optimal policy for a multiechelon inventory system with remanufacturing. Oper. Res. 54:532–543.Link, Google Scholar
- (2015) Inventory models with shelf-age and delay-dependent inventory costs. Oper. Res. 63:701–715.Link, Google Scholar
- (2003) Optimal replenishment policies for multiechelon inventory problems under advance demand information. Manufacturing Service Oper. Management 5:157–175.Link, Google Scholar
- (1997) A two-echelon allocation model and the value of information under correlated forecasts and demands. Eur. J. Oper. Res. 99:386–400.Crossref, Google Scholar
- (1995) Customer-order information, leadtimes, and inventories. Management Sci. 41:1599–1607.Link, Google Scholar
- (2004) Setting customer expectation in service delivery: An integrated marketing-operations perspective. Management Sci. 50:479–488.Link, Google Scholar
- (2003) Supply chain management with guaranteed delivery. Management Sci. 49:1154–1167.Link, Google Scholar
- (2010) Inventory control with generalized expediting. Oper. Res. 58:1414–1426.Link, Google Scholar
- (2011) Inventory systems with a generalized cost model. Oper. Res. 59:1040–1047.Link, Google Scholar
- (2015) Optimal expediting policies for a serial inventory system with stochastic lead time. Production Oper. Management 24:1524–1536.Crossref, Google Scholar
- (2000) Multistage inventory management with expediting. Oper. Res. 48:878–893.Link, Google Scholar
- (1999) Decentralized multi-echelon supply chains: Incentives and information. Management Sci. 45:633–640.Link, Google Scholar
- (2014) Lead time management through expediting in a continuous review inventory system. Production Oper. Management 23:95–109.Crossref, Google Scholar
- (2003) Dynamic leadtime management in supply chains. Technical report, Massachusetts Institute of Technology, Cambridge, MA.Google Scholar
- (2004) Optimal policies for a capacitated two-echelon inventory system. Oper. Res. 52:739–755.Link, Google Scholar
- (2002) Foundations of Stochastic Inventory Theory (Stanford University Press, Redwood City, CA).Crossref, Google Scholar
- (2005) Demand and production management with uniform guaranteed lead time. Production Oper. Management 14:400–412.Crossref, Google Scholar
- (2002) Inventory cost rate functions with nonlinear shortage costs. Oper. Res. 50:1007–1017.Link, Google Scholar
- (2006) A closed-form approximation for serial inventory systems and its application to system design. Manufacturing Service Oper. Management 8:394–406.Link, Google Scholar
- (2019) Capacity allocation with multiple suppliers and multiple demand classes. Production Oper. Management 28:2792–2807.Crossref, Google Scholar
- (2019) Managing supply chains with expediting and multiple demand classes. Production Oper. Management 28:1129–1148.Crossref, Google Scholar
- (1998) Price, delivery time guarantees and capacity selection. Eur. J. Oper. Res. 111:28–49.Crossref, Google Scholar
- (2019) Modeling payment timing in multiechelon inventory systems with applications to supply chain coordination. Manufacturing Service Oper. Management 22:346–363.Link, Google Scholar
- (2008) Inventory management with advance demand information and flexible delivery. Management Sci. 54:716–732.Link, Google Scholar
- (2005) On the time-window fulfillment rate in a single-item min-max inventory control system. IIE Trans. 37:667–680.Crossref, Google Scholar
- (2015). Dynamic capacity management with general upgrading. Oper. Res. 63:1372–1389.Link, Google Scholar
- (2010) Newsvendor bounds and heuristics for serial supply chains with regular and expedited shipping. Naval Res. Logist. 57:71–87.Google Scholar

