Frontiers in Operations: Prioritizing Disaster Recovery Under Budget Uncertainty

Published Online:https://doi.org/10.1287/msom.2024.1574

References

  • Ajam M, Akbari V, Salman FS (2019) Minimizing latency in post-disaster road clearance operations. Eur. J. Oper. Res. 277(3):1098–1112.CrossrefGoogle Scholar
  • Akbari V, Shiri D, Salman FS (2021) An online optimization approach to post-disaster road restoration. Transportation Res. Part B: Methodological 150:1–25.CrossrefGoogle Scholar
  • Aouad A, Segev D (2023) An approximate dynamic programming approach to the incremental knapsack problem. Oper. Res. 71(4):1414–1433.LinkGoogle Scholar
  • Averbakh I, Pereira J (2018) Lateness minimization in pairwise connectivity restoration problems. INFORMS J. Comput. 30(3):522–538.LinkGoogle Scholar
  • Başar A, Çatay B, Ünlüyurt T (2012) A taxonomy for emergency service station location problem. Optim. Lett. 6(6):1147–1160.CrossrefGoogle Scholar
  • Ben-Tal A, Goryashko A, Guslitzer E, Nemirovski A (2004) Adjustable robust solutions of uncertain linear programs. Math. Programming 99(2):351–376.CrossrefGoogle Scholar
  • Berman O, Krass D, Menezes MB (2007) Facility reliability issues in network p-median problems: Strategic centralization and co-location effects. Oper. Res. 55(2):332–350.LinkGoogle Scholar
  • Bernstein A, Disser Y, Groβ M, Himburg S (2022) General bounds for incremental maximization. Math. Programming 191(2):953–979.CrossrefGoogle Scholar
  • Bertsimas D, Caramanis C (2010) Finite adaptability in multistage linear optimization. IEEE Trans. Automated Control 55(12):2751–2766.CrossrefGoogle Scholar
  • Besiou M, Van Wassenhove LN (2020) Humanitarian operations: A world of opportunity for relevant and impactful research. Manufacturing Service Oper. Management 22(1):135–145.LinkGoogle Scholar
  • Boutilier JJ, Chan TC (2020) Ambulance emergency response optimization in developing countries. Oper. Res. 68(5):1315–1334.LinkGoogle Scholar
  • Çelik M, Ergun Ö, Keskinocak P (2015) The post-disaster debris clearance problem under incomplete information. Oper. Res. 63(1):65–85.LinkGoogle Scholar
  • Clarke DJ, Dercon S (2016) Dull Disasters? How Planning Ahead will Make a Difference (Oxford University Press, New York).CrossrefGoogle Scholar
  • Disser Y, Klimm M, Lutz A, Weckbecker D (2024) Fractionally subadditive maximization under an incremental knapsack constraint with applications to incremental flows. SIAM J. Discrete Math. 38(1):764–789.CrossrefGoogle Scholar
  • Disser Y, Klimm M, Schewior K, Weckbecker D (2023) Incremental maximization via continuization. Preprint, submitted May 2, https://arxiv.org/abs/2305.01310.Google Scholar
  • Eftekhar M, Jeannette Song JS, Webster S (2022) Prepositioning and local purchasing for emergency operations under budget, demand, and supply uncertainty. Manufacturing Service Oper. Management 24(1):315–332.LinkGoogle Scholar
  • Faenza Y, Segev D, Zhang L (2023) Approximation algorithms for the generalized incremental knapsack problem. Math. Programming 198(1):27–83.CrossrefGoogle Scholar
  • FEMA (2007) Public assistance—Debris management guide. Federal Emergency Management Agency, Washington, DC.Google Scholar
  • Freeman LC (1977) A set of measures of centrality based on betweenness. Sociometry 40(1):35–41.CrossrefGoogle Scholar
  • Glaeser CK, Fisher M, Su X (2019) Optimal retail location: Empirical methodology and application to practice: Finalist–2017. Manufacturing Service Oper. Management 21(1):86–102.LinkGoogle Scholar
  • Guardian (2012) Haiti earthquake: Two years on, and just half of promised aid has been delivered. Accessed April 29, 2026, https://www.theguardian.com/world/2012/jan/11/haiti-earth quake-promised-aid-not-delivered.Google Scholar
  • Gupta S, Starr MK, Farahani RZ, Matinrad N (2016) Disaster management from a POM perspective: Mapping a new domain. Production Oper. Management 25(10):1611–1637.CrossrefGoogle Scholar
  • Hakimi SL (1964) Optimum locations of switching centers and the absolute centers and medians of a graph. Oper. Res. 12(3):450–459.LinkGoogle Scholar
  • Herroelen W, Leus R (2004) Robust and reactive project scheduling: A review and classification of procedures. Internat. J. Production Res. 42(8):1599–1620.CrossrefGoogle Scholar
  • Hu J, Chen Z, Wang S (2025) Budget-driven multiperiod hub location: A robust time-series approach. Oper. Res. 73(2):613–631.LinkGoogle Scholar
  • Jenelius E, Mattsson LG (2012) Road network vulnerability analysis of area-covering disruptions: A grid-based approach with case study. Transportation Res. Part A: Policy Practice 46(5):746–760.CrossrefGoogle Scholar
  • Kalinowski T, Matsypura D, Savelsbergh MW (2015) Incremental network design with maximum flows. Eur. J. Oper. Res. 242(1):51–62.CrossrefGoogle Scholar
  • Koç A, Morton DP (2015) Prioritization via stochastic optimization. Management Sci. 61(3):586–603.LinkGoogle Scholar
  • Lazzaro G, Carlyle WM (2019) Finding the best system nested defense under budget uncertainty. Military Oper. Res. 24(1):5–22.Google Scholar
  • Li X, Zhao Z, Zhu X, Wyatt T (2011) Covering models and optimization techniques for emergency response facility location and planning: A review. Math. Methods Oper. Res. 74(3):281–310.CrossrefGoogle Scholar
  • Marianov V (2017) Location models for emergency service applications. Batta R, Peng J, eds. Leading Developments from INFORMS Communities (INFORMS, Catonsville, MD), 237–262.LinkGoogle Scholar
  • Maya Duque P, Sörensen K (2011) A grasp metaheuristic to improve accessibility after a disaster. OR Spectrum 33(3):525–542.CrossrefGoogle Scholar
  • Michalopoulos DP, Barnes JW, Morton DP (2015) Prioritized interdiction of nuclear smuggling via tabu search. Optim. Lett. 9(8):1477–1494.CrossrefGoogle Scholar
  • Mirchandani PB, Francis RL (1990) Discrete Location Theory (John Wiley & Sons, New York).Google Scholar
  • Moreno A, Alem D, Gendreau M, Munari P (2020) The heterogeneous multicrew scheduling and routing problem in road restoration. Transportation Res. Part B: Methodological 141:24–58.CrossrefGoogle Scholar
  • Natarajan KV, Swaminathan JM (2014) Inventory management in humanitarian operations: Impact of amount, schedule, and uncertainty in funding. Manufacturing Service Oper. Management 16(4):595–603.LinkGoogle Scholar
  • Politico (2024) FEMA spent nearly half its disaster budget in just 8 days. Accessed April 29, 2026, https://www.politico.com/news/2024/10/10/fema-disaster-budget-hurricane-helene-melton-00183219.Google Scholar
  • Postek K, Romeijnders W, Wiesemann W (2025) Multistage robust mixed-integer programming. Oper. Res. 73(6):3345–3358.LinkGoogle Scholar
  • ReliefWeb (2024) 1 year after Pakistan donor conference, only around 5% of flood-damaged homes rebuilt. Accessed April 29, 2026, https://reliefweb.int/report/pakistan/1-year-pakistan-donor-conference-only-around-5-flood-damaged-homes-rebuilt.Google Scholar
  • Reuters (2011) Japan earmarks first $50 billion for post-quake rebuild. Accessed April 29, 2026, https://www.reuters.com/article/us-japan-quake-idUSTRE72A0SS20110327/.Google Scholar
  • Smith AM, Pósfai M, Rohden M, González AD, Dueñas-Osorio L, D’Souza RM (2019) Competitive percolation strategies for network recovery. Sci. Rep. 9(1):1–12.CrossrefGoogle Scholar
  • Sohn J (2006) Evaluating the significance of highway network links under the flood damage: An accessibility approach. Transportation Res. Part A: Policy Practice 40(6):491–506.CrossrefGoogle Scholar
  • Ulusan A, Ergun Ö (2018) Restoration of services in disrupted infrastructure systems: A network science approach. PLoS One 13(2):e0192272.CrossrefGoogle Scholar
  • Ulusan A, Ergun Ö (2021) Approximate dynamic programming for network recovery problems with stochastic demand. Transportation Res. Part E: Logist. Transportation Rev. 151:102358.CrossrefGoogle Scholar
  • Unda Surawski FT (2018) Combinatorial incremental problems. PhD thesis, Massachusetts Institute of Technology, Cambridge.Google Scholar
  • Weaver JR, Church RL (1983) Computational procedures for location problems on stochastic networks. Transportation Sci. 17(2):168–180.LinkGoogle Scholar
  • Yu X, Shen S (2021) On the value of multistage risk-averse stochastic facility location with or without prioritization. Preprint, submitted May 23, https://arxiv.org/abs/2105.11005.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.