The Effectiveness of Several Performance Bounds for Capacitated Production, Partial-Order-Service, Assemble-to-Order Systems

References

  • Baccelli F., Makowski A. M. Multidimensional stochastic ordering and associated random variables. Oper. Res. (1989) 37:478–487LinkGoogle Scholar
  • Baccelli F., Makowski A. M., Schwartz A. The fork-join queue and related systems with synchronization constraints: Stochastic ordering and computable bounds. Adv. Appl. Probab. (1989) 21:629–660CrossrefGoogle Scholar
  • Chao X., Miyazawa M., Pinedo M.Queueing Networks: Customers, Signals, and Product Form Solutions (1999) (Wiley & Sons)Google Scholar
  • Cheng F., Ettl M., Lin G. Y., Yao D. D. Inventory-service optimization in configure-to-order systems. Manufacturing Service Oper. Management (2002) 4:114–132LinkGoogle Scholar
  • Connors D. P., Yao D. D. Methods for job configuration in semiconductor manufacturing. IEEE Trans. Semiconductor Manufacturing (1996) 9:401–411CrossrefGoogle Scholar
  • Costigan T. Combination setwise-Bonferroni-type bounds. Naval Res. Logist. (1996) 43:59–77CrossrefGoogle Scholar
  • Glasserman P., Wang Y. Lead time-inventory trade-offs in assemble-to-order systems. Oper. Res. (1998) 46:858–871LinkGoogle Scholar
  • Gross D., Harris C.Fundamentals of Queueing Theory (1985) 2nd ed.(John Wiley & Sons, New York) Google Scholar
  • Joe H.Multivariate Models and Dependence Concepts (1997) (Chapman & Hall, London, U.K.) CrossrefGoogle Scholar
  • Li H., Xu S. H. On the dependence structure and bounds of correlated parallel queues and its applications to synchronized stochastic systems. J. Appl. Probab. (2000) 37:1020–1043CrossrefGoogle Scholar
  • Lu Y., Song J.-S. Order-based cost optimization in assemble to-order systems. (2002) . Working paper, Graduate School of Management, University of California, Irvine, CAGoogle Scholar
  • Lu Y., Song J.-S., Yao D. D. Performance analysis of multiproduct assemble-to-order systems with uncertain lead time. Oper. Res. (2003a) 51:292–308LinkGoogle Scholar
  • Lu Y., Song J.-S., Yao D. D. Backorder minimization in multiproduct assemble-to-order systems. (2003b) . Working paper, Graduate School of Management, University of California, Irvine, CAGoogle Scholar
  • Mamer J., Smith S. Job fill inventories for sequences of jobs. (1993) . Working paper, UCLA Graduate School of Management, Los Angeles, CAGoogle Scholar
  • Nelson R., Tantawi A. N. Approximate analysis of fork/join synchronization in parallel systems. IEEE Trans. Comput. (1988) 37:739–743CrossrefGoogle Scholar
  • Rolski T. Upper bounds for single server queues with doubly stochastic Poisson arrivals. Math. Oper. Res. (1983) 11:442–450LinkGoogle Scholar
  • Schwartz A., Weiss A. Induced rare events: Analysis via large deviations and time reversal. Adv. Appl. Probab. (1993) 25:667–689CrossrefGoogle Scholar
  • Shaked M., Shanthikumar J. G. Super modular stochastic order and positive dependence of random vectors. J. Multivariate Anal. (1997) 61:86–101CrossrefGoogle Scholar
  • Song J.-S. On the order fill rate in a multi-item, base-stock inventory system. Oper. Res. (1998) 46:831–845LinkGoogle Scholar
  • Song J.-S., Yao D. D. Performance analysis and optimization in assemble-to-order systems with random lead times. Oper. Res. (2002) 50:889–903LinkGoogle Scholar
  • Song J.-S., Zipkin P., de Kok T., Graves S. Supply chain operations: Assemble-to-order systems. Handbooks in Operations Research and Management Science, Vol. XXX, Supply Chain Management (2003) (North-Holland). ForthcomingCrossrefGoogle Scholar
  • Song J.-S., Xu S., Liu B. Order-fulfillment performance measures in an assemble-to-order system with stochastic lead times. Oper. Res. (1999) 47:131–149LinkGoogle Scholar
  • Tong Y. L.Probability Inequalities in Multivariate Distributions (1980) (Academic Press, New York) Google Scholar
  • Wright P. Two parallel processors with coupled inputs. Adv. Appl. Probab. (1992) 24:986–1007CrossrefGoogle Scholar
  • Xu S. H. Structural analysis of a queueing system with multi-classes of correlated arrivals and blocking. Oper. Res. (1999) 47:263–276LinkGoogle Scholar
  • Xu S. H., Song J. S., Yao D. D. Dependence analysis of assemble-to-order systems. Supply Chain Structures: Coordination, Information and Optimization (2002) (Kluwer Academic Publishers)359–414CrossrefGoogle Scholar
  • Zhang R. Expected time delay in a multi-item production inventory system with correlated demands. Naval Res. Logist. (1999) 46:671–688CrossrefGoogle Scholar
  • Zipkin P. H.Foundations of Inventory Management (2000) (McGraw- Hill, New York) Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.