Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements

Published Online:https://doi.org/10.1287/opre.1060.0345

References

  • Agrawal N., Cohen M. A. Optimal material control in an assembly system with component commonality. Naval Res. Logist. (2001) 48:409–429CrossrefGoogle Scholar
  • Axsäter S.Inventory Control (2000) (Kluwer, Norwell, MA) CrossrefGoogle Scholar
  • Bessler S., Veinott A. F. Optimal policy for a dynamic multi-echelon inventory model. Naval Res. Logist. Quart. (1966) 13:355–390CrossrefGoogle Scholar
  • Caggiano K. E., Muckstadt J. A., Rappold J. A. Integrated real-time capacity and inventory allocation for reparable service parts in a two-echelon supply system. Manufacturing Service Oper. Management (2006a) 8(3):292–319LinkGoogle Scholar
  • Caggiano K. E., Jackson P. L., Muckstadt J. A., Rappold J. A. Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization. Proc. Internat. Conf. Inform. Systems, Logist. Supply Chain (2006b) (INSA de Lyon, France) Google Scholar
  • Caglar D., Li C.-L., Simchi-Levi D. Two-echelon spare parts inventory system subject to a service constraint. IIE Trans. (2004) 36:655–666CrossrefGoogle Scholar
  • Cheung K. L., Hausman W. H. Multiple failures in a multi-item spares inventory model. IIE Trans. (1995) 27:171–180CrossrefGoogle Scholar
  • Clark A. J., Scarf H. E. Optimal policies for a multi-echelon inventory problem. Management Sci. (1960) 6:475–490LinkGoogle Scholar
  • Cohen M., Lee H. L. Strategic analysis of integrated production-distribution systems: Models and methods. Oper. Res. (1988) 36:216–228LinkGoogle Scholar
  • Cohen M., Kleindorfer P., Lee H. L. Optimal stocking policies for low usage items in multi-echelon inventory systems. Naval Res. Logist. Quart. (1986) 33:17–38CrossrefGoogle Scholar
  • Cohen M., Kleindorfer P., Lee H. L. Near-optimal service constrained stocking policies for spare parts. Oper. Res. (1989) 37:104–117LinkGoogle Scholar
  • Ettl M., Feigin G. E., Lin G. Y., Yao D. D. A supply network model with base-stock control and service requirements. Oper. Res. (2000) 48:216–232LinkGoogle Scholar
  • Federgruen A., Graves S. C., Rinnooy Kan A. H. G., Zipkin P. H. Centralized planning models for multi-echelon inventory systems under uncertainty. Logistics of Production and Inventory (1993) 4(North-Holland, Amsterdam, The Netherlands) 133–173CrossrefGoogle Scholar
  • Graves S. C. A multi-echelon inventory model for a repairable item with one-for-one replenishment. Management Sci. (1985) 31:1247–1256LinkGoogle Scholar
  • Hadley G., Whitin T. M.Analysis of Inventory Systems (1963) (Prentice Hall, Englewood Cliffs, NJ) Google Scholar
  • Hopp W. J., Zhang R. Q., Spearman M. L. An easily implementable hierarchical heuristic for a two-echelon spare parts distribution system. IIE Trans. (1999) 31:977–988CrossrefGoogle Scholar
  • Mamer J. W., Smith S. A. Optimizing field repair kits based on job completion rate. Management Sci. (1982) 28:1328–1333LinkGoogle Scholar
  • Pyke D. F. Priority repair and dispatch policies for repairable-item logistics systems. Naval Res. Logist. (1990) 37:1–30CrossrefGoogle Scholar
  • Rappold J. A., Van Roo B. D. A model for designing multi-echelon inventory networks with finite capacity. (2006) . Working paper, School of Business, University of Wisconsin–Madison, Madison, WIGoogle Scholar
  • Sherbrooke C. C. METRIC: A multi-echelon technique for recoverable item control. Oper. Res. (1968) 16:122–141LinkGoogle Scholar
  • Silver E. A., Pyke D. F., Peterson R.Inventory Management and Production Planning and Scheduling (1998) 3rd ed.(Wiley, New York) Google Scholar
  • Smith S. A., Chambers J. C., Shlifer E. Optimal inventories based on job completion rate for repairs requiring multiple items. Management Sci. (1980) 26:849–852LinkGoogle Scholar
  • Song J.-S., Xu S. H., Liu B. Order-fulfillment performance measures in an assemble-to-order system with stochastic leadtimes. Oper. Res. (1999) 47:131–149LinkGoogle Scholar
  • Wong H., Kranenburg B., van Houtum G. J., Cattrysse D. Efficient heuristics for two-echelon spare parts inventory systems with an aggregate mean waiting time constraint per local warehouse. (2005a) . Working paper, Technische Universiteit Eindhoven, Eindhoven, The NetherlandsGoogle Scholar
  • Wong H., van Houtum G. J., Cattrysse D., Van Oudheusden D. A system approach for multi-location spare parts systems with lateral transshipments and waiting time constraints. J. Oper. Res. Soc. (2005b) 56:1419–1430CrossrefGoogle Scholar
  • Zipkin P.Foundations of Inventory Management (2000) (McGraw-Hill)Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.