A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
Published Online:1 Jun 2007https://doi.org/10.1287/opre.1060.0358
References
- A robust genetic algorithm for resource allocation in project scheduling. Ann. Oper. Res. (2001) 102:83–109Crossref, Google Scholar
- Improving the performance of genetic algorithms for the RCPS problem. Proc. Ninth Internat. Workshop Project Management and Scheduling (2004) Nancy, France:40–43Google Scholar
- , Voss S., Martello S., Osmon I. H. Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem. Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization (1998) (Kluwer Academic Publishers, Norwell, MA) 1–8Google Scholar
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. Eur. J. Oper. Res. (2003) 149:268–281Crossref, Google Scholar
- A branch & bound algorithm for the resource-constrained project scheduling problem. Eur. J. Oper. Res. (1998) 107:272–288Crossref, Google Scholar
- Resource-constrained project scheduling: Notation, classification, models and methods. Eur. J. Oper. Res. (1999) 112:3–41Crossref, Google Scholar
- Comparative analysis of meta-heuristics for the resource constrained project scheduling problem. (2003) . Technical report, Department of Civil Engineering, Instituto Superior Tecnico, Lisbon, PortugalGoogle Scholar
- A hybrid scatter-search/electromagnetism meta-heuristic for the resource-constrained project scheduling problem. Eur. J. Oper. Res. (2006) 169(3):638–653Crossref, Google Scholar
- A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Sci. (1992) 38:1803–1818Link, Google Scholar
- New benchmark results for the resource-constrained project scheduling problem. Management Sci. (1997) 43:1485–1492Link, Google Scholar
- A random generator for activity-on-the-node networks. J. Scheduling (2003) 6:13–34Crossref, Google Scholar
- A competitive genetic algorithm for the resource-constrained project scheduling. Naval Res. Logist. (1998) 45:733–750Crossref, Google Scholar
- A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Res. Logist. (2002) 49:433–448Crossref, Google Scholar
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. Eur. J. Oper. Res. (2000) 127:394–407Crossref, Google Scholar
- , Weglarz J. A classification scheme for project scheduling. Project Scheduling—Recent Models, Algorithms and Applications. International Series in Operations Research and Management Science (1999) 14(Kluwer Academic Publishers, Boston, MA) 77–106Crossref, Google Scholar
- Resource-constrained project scheduling: A survey of recent developments. Comput. Oper. Res. (1998) 25(4):279–302Crossref, Google Scholar
- Adaptation in Natural and Artificial Systems (1975) (The University of Michigan Press, Ann Arbor, MI) Google Scholar
- Project scheduling problems: A survey. Internat. J. Oper. Productions Management (1993) 13(11):80–91Crossref, Google Scholar
- Evolutionary local search with variable neighbourhood for the resource constrained project scheduling problem. Proc. 3rd Internat. Workshop of Comput. Sci. Inform. Tech. (2003) Ufa, RussiaGoogle Scholar
- Project Scheduling Under Resource Constraints—Efficient Heuristics for Several Problem Classes (1995) (Physica-Verlag, Heidelberg, Germany) Crossref, Google Scholar
- Efficient priority rules for the resource-constrained project scheduling problem. J. Oper. Management (1996a) 14:179–192Crossref, Google Scholar
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. Eur. J. Oper. Res. (1996b) 43:23–40Google Scholar
- Adaptive search for solving hard project scheduling problems. Naval Res. Logist. (1996) 43:23–40Crossref, Google Scholar
- , Weglarz J. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. Project Scheduling—Recent Models, Algorithms and Applications (1999) (Kluwer Academic Publishers, Boston, MA) 147–178Crossref, Google Scholar
- Experimental investigation of heuristics for resource-constrained project scheduling: An update. (2004) . Working paper, Technical University of Munich, Munich, GermanyGoogle Scholar
- An integrated survey of deterministic project scheduling. Omega (2001) 49(3):249–272Crossref, Google Scholar
- PSPLIB—A project scheduling library. Eur. J. Oper. Res. (1997) 96:205–216Crossref, Google Scholar
- Strength and adaptability of problem-space based neighbourhoods for resource-constrained scheduling. OR Spektrum (1995) 17:173–182Crossref, Google Scholar
- An iterative scheduling technique for resource-constrained project scheduling. Eur. J. Oper. Res. (1992) 56:370–379Crossref, Google Scholar
- , Glover F., Osman I., Kelley J. Exploiting block structure to improve resource-constrained project schedules. Metaheuristics 1995: State of the Art (1997) (Kluwer)Google Scholar
- Ant colony optimization for resource constrained project scheduling. IEEE Trans. Evolutionary Comput. (2002) 6(4):333–346Crossref, Google Scholar
- An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation. Management Sci. (1998) 44:715–729Link, Google Scholar
- , Ribeiro C. C., Hansen P. Formulation and tabu search algorithm for the resource constrained project scheduling problem (RCPSP). Essays and Surveys in Meta-Heuristics (2002) (Kluwer Academic Publishers, Boston, MA) 557–588Crossref, Google Scholar
- A survey on the resource-constrained project scheduling problem. IIE Trans. (1995) 27:574–586Crossref, Google Scholar
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search. Ann. Oper. Res. (2004) 131:237–257Crossref, Google Scholar
- Case-based reasoning and improved adaptive search for project scheduling. Naval Res. Logist. (2000) 47:201–222Crossref, Google Scholar
- Scheduling resource-constrained projects competitively at modest resource requirements. Management Sci. (2000) 46:710–723Link, Google Scholar
- Network decomposition techniques for resource-constrained project scheduling. J. Oper. Res. Soc. (2002) 53(4):405–414Crossref, Google Scholar
- A competitive heuristic solution technique for resource-constrained project scheduling. Ann. Oper. Res. (2001) 102:65–81Crossref, Google Scholar
- An efficient multi-pass heuristic for project scheduling with constrained resources. Internat. J. Production Res. (2003a) 41:1071–1086Crossref, Google Scholar
- Integrating heuristics for resource constrained project scheduling: One step forward. (2003b) . Technical report, Department of Statistics and Operations Research, Universidad Politecnica de Valencia, Valencia, SpainGoogle Scholar
- A hybrid genetic algorithm for the resource-constrained project scheduling problem with the peak crossover operator. Eighth Internat. Workshop on Project Management and Scheduling (2002) 368–371Google Scholar
- A population-based approach to the resource-constrained project scheduling problem. Ann. Oper. Res. (2004) 131:305–324Crossref, Google Scholar
- Justification and RCPSP: A technique that pays. Eur. J. Oper. Res. (2005) 165(2):375–386Crossref, Google Scholar
- Resource-constrained project scheduling: A critical activity reordering heuristic. Eur. J. Oper. Res. (2003) 149:282–301Crossref, Google Scholar

