Economic Lot-Sizing for Integrated Production and Transportation

Published Online:https://doi.org/10.1287/opre.1090.0727

References

  • Aggarwal A., Park J. K. Improved algorithms for economic lot-size problems. Oper. Res. (1993) 41:549–571LinkGoogle Scholar
  • Anily S., Tzur M. Shipping multiple items by capacitated vehicles: An optimal dynamic programming approach. Transportation Sci. (2006) 39(5):233–248Google Scholar
  • Atamtürk A., Hochbaum D. S. Capacity acquisition, subcontracting, and lot sizing. Management Sci. (2001) 47:1081–1100LinkGoogle Scholar
  • Baker K. R., Dixon P., Magazine M. J., Silver E. A. An algorithm for the dynamic lot-size problem with time-varying production capacity constraints. Management Sci. (1978) 24(16):1710–1720LinkGoogle Scholar
  • Bitran G. B., Yanasse H. H. Computational complexity of the capacitated lot size problem. Management Sci. (1982) 28:1174–1185LinkGoogle Scholar
  • Çetinkaya S., Lee C.-Y. Stock replenishment and shipment scheduling for vendor managed inventory systems. Management Sci. (2000) 46:217–232LinkGoogle Scholar
  • Çetinkaya S., Lee C.-Y. Outbound transportation: Modeling inventory and cargo capacity. Naval Res. Logist. (2002) 49:531–557CrossrefGoogle Scholar
  • Chan L. M. A., Muriel A., Shen Z., Simchi-Levi D. On the effectiveness of zero-inventory-ordering policies for the economic lot-sizing model with a class of piecewise linear cost structures. Oper. Res. (2002a) 50(6):1058–1067LinkGoogle Scholar
  • Chan L. M. A., Muriel A., Shen Z., Simchi-Levi D., Teo C. P. Effective zero-inventory-ordering policies for the single-warehouse multiretailer problem with piecewise linear cost structures. Management Sci. (2002b) 11:1446–1460LinkGoogle Scholar
  • Chung C. S., Lin C. H. M. An O(T2) algorithm for the NI/G/NI/ND capacitated lot size problem. Management Sci. (1988) 34:420–427LinkGoogle Scholar
  • Federgruen A., Tzur M. A simple forward algorithm to solve general dynamic lot-sizing models with n periods in O(n log n) or O(n) time. Management Sci. (1991) 37:909–925LinkGoogle Scholar
  • Florian M., Klein M. Deterministic replenishment planning with concave costs and capacity constraints. Management Sci. (1971) 18:12–20LinkGoogle Scholar
  • Florian M., Lenstra J. K., Rinnooy Kan A. H. G. Deterministic replenishment planning: Algorithms and complexity. Management Sci. (1980) 26:669–679LinkGoogle Scholar
  • Hwang H.-C. Inventory replenishment and inbound shipment scheduling under a minimum replenishment policy. Transportation Sci. (2009) 43(2):244–264LinkGoogle Scholar
  • Hwang H.-C., Jaruphongsa W. Dynamic lot-sizing model with demand time windows and speculative cost structure. Oper. Res. Lett. (2006) 34:251–257CrossrefGoogle Scholar
  • Jaruphongsa W., Çetinkaya S., Lee C.-Y. A dynamic lot-sizing model with multi-mode replenishments: Polynomial algorithms for special cases with dual and multiple modes. IIE Trans. (2005) 37:453–467CrossrefGoogle Scholar
  • Kaminsky P., Simchi-Levi D. Production and distribution lot sizing in a two stage supply chain. IIE Trans. (2003) 35(11):1065–1075CrossrefGoogle Scholar
  • Lee C.-Y. A solution to the multiple set-up problem with dynamic demand. IIE Trans. (1989) 21:266–270CrossrefGoogle Scholar
  • Lee C.-Y. Inventory replenishment model: Lot sizing versus just-in-time delivery. Oper. Res. Lett. (2004) 32:581–590CrossrefGoogle Scholar
  • Lee C.-Y., Çetinkaya S., Jaruphongsa W. A dynamic model for inventory lot sizing and outbound shipment scheduling at a third-party warehouse. Oper. Res. (2003) 51:735–747LinkGoogle Scholar
  • Lee C.-Y., Çetinkaya S., Wagelmans A. P. M. A dynamic lot-sizing model with demand time windows. Management Sci. (2001) 47:1384–1395LinkGoogle Scholar
  • Lippman S. A. Optimal inventory policy with multiple set-up costs. Management Sci. (1969) 16:118–138LinkGoogle Scholar
  • Love S. F. Bounded replenishment and inventory models with piecewise concave costs. Management Sci. (1973) 20:313–318LinkGoogle Scholar
  • Pochet Y., Wolsey L. A. Lot-sizing with constant batches: Formulations and valid inequalities. Math. Oper. Res. (1993) 18(4):767–785LinkGoogle Scholar
  • Sargut F. Z., Romeijn H. E. Capacitated production and subcontracting in a serial supply chain. IIE Trans. (2007) 39:1031–1043CrossrefGoogle Scholar
  • Van Hoesel C. P. M., Wagelmans A. P. M. An O(T3) algorithm for the economic lot-sizing problem with constant capacities. Management Sci. (1996) 42:142–150LinkGoogle Scholar
  • Van Hoesel C. P. M., Wagelmans A. P. M., Moerman B. Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problem and extensions. Eur. J. Oper. Res. (1994) 75:312–331CrossrefGoogle Scholar
  • Van Hoesel S., Romeijn H. E., Morales D. R., Wagelmans A. P. M. Integrated lot-sizing in serial supply chains with production capacities. Management Sci. (2005) 51(11):1706–1719LinkGoogle Scholar
  • Van Vyve M. Algorithms for single-item lot-sizing problems with constant batch size. Math. Oper. Res. (2007) 32(3):594–613LinkGoogle Scholar
  • Wagelmans A. P. M., Van Hoesel S., Kolen A. Economic lot sizing: An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case. Oper. Res. (1992) 40:S145–S157LinkGoogle Scholar
  • Wagner H. M., Whitin T. M. Dynamic version of the economic lot-size model. Management Sci. (1958) 5:89–97LinkGoogle Scholar
  • Wolsey L. A. Lot-sizing with production and delivery time windows. Math. Programming Ser. A (2006) 107:471–489CrossrefGoogle Scholar
  • Zangwill W. I. A deterministic multi-period replenishment scheduling model with backlogging. Management Sci. (1966) 13:105–119LinkGoogle Scholar
  • Zangwill W. I. A backlogging model and a multi-echelon model of a dynamic economic lot size replenishment system—A network approach. Management Sci. (1969) 15:506–527LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.