Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information
Published Online:5 Oct 2016https://doi.org/10.1287/opre.2016.1541
References
- (2011) A multiechelon inventory problem with secondary market sales. Management Sci. 57(12):2145–2162.Link, Google Scholar
- (2008) An asset assembly problem. Oper. Res. 56(3):665–680.Link, Google Scholar
- (1990) A survey of lower bounding methodologies for production/inventory models. Ann. Oper. Res. 26(1):9–28.Crossref, Google Scholar
- (1994) A simple lower bound to the dynamic assembly problem. Eur. J. Oper. Res. 75(2):462–466.Crossref, Google Scholar
- (2011a) Production-inventory systems with imperfect advance demand information and updating. Naval Res. Log. 58(2):88–106.Crossref, Google Scholar
- (2011b) Optimal control of an assembly system with multiple stages and multiple demand classes. Oper. Res. 59(2):522–529.Link, Google Scholar
- (2014) Advance demand information in a multiproduct system. Manufacturing Service Oper. Management 17(1):52–65.Link, Google Scholar
- (2001) Market segmentation, advanced demand information, and supply chain performance. Manufacturing Service Oper. Management 3(1):53–67.Link, Google Scholar
- (1994) Lower bounds for multi-echelon stochastic inventory systems. Management Sci. 40(11):1426–43.Link, Google Scholar
- (2014) Optimal policies for assembly systems: Completing Rosling’s characterization. Working paper, University of Texas, Dallas.Google Scholar
- (1960) Optimal policies for the multi-echelon inventory problem. Management Sci. 6(4):475–490.Link, Google Scholar
- (2013) Inventory management for an assembly system subject to supply disruptions. Management Sci. 59(9):2079–2092.Link, Google Scholar
- (2005) Inventory management for an assembly system with product or component returns. Management Sci. 51(8):1250–1265.Link, Google Scholar
- Dell Inc. (2013) Form 10-K. http://www.sec.gov/Archives/edgar/data/826083/000082608313000005/dellfy1310k.htm.Google Scholar
- (2010) From build-to-order to customize-to-order: Advancing the automotive industry by collaboration and modularity. “Code of Practice Findings of the EU-FP6-Project AC/DCAutomotive Chassis Development for 5-Days Cars.” Consortium of the AC/DC Project.Google Scholar
- (1993) Centralized planning models for multiechelon inventory systems under uncertainty. Graves SC, Rinnooy Kan AHG, Zipkin PH, eds. Logistics of Production and Inventory (North-Holland, Amsterdam), 133–173.Crossref, Google Scholar
- (1984) Computational issues in an infinite-horizon, multiechelon inventory model. Oper. Res. 32(4):818–836.Link, Google Scholar
- (2001) Integrating replenishment decisions with advance demand information. Management Sci. 47(10):1344–1360.Link, Google Scholar
- (2003) Optimal replenishment policies for multiechelon inventory problems under advanced demand information. Manufacturing Service Oper. Management 5(2):157–175.Link, Google Scholar
- (2009) Using imperfect advance demand information in production-inventory systems with multiple customer classes. Manufacturing Service Oper. Management 11(1):128–143.Link, Google Scholar
- (2003) Advance demand information and safety capacity as a hedge against demand and capacity uncertainty. Manufacturing Service Oper. Management 5(1):55–58.Link, Google Scholar
- (2014) Clickstream data and inventory management: Model and empirical analysis. Production Oper. Management. 23(3):333–347.Crossref, Google Scholar
- (1958) A theorem in convex programming. Naval Res. Log. Quart. 6(3):245–260.Crossref, Google Scholar
- (1992) Bivariate Discrete Distributions (Marcel Dekker, New York).Google Scholar
- (2000) Multistage inventory management with expediting. Oper. Res. 48(6):878–893.Link, Google Scholar
- (2013) Approximation algorithms for the stochastic lot-sizing problem with order lead times. Oper. Res. 61(3):593–602.Link, Google Scholar
- (2003) Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system. Oper. Res. 51(2):292–308.Link, Google Scholar
- (2006) Controlling inventories in divergent supply chains with advance-order information. Oper. Res. 54(5):988–1010.Link, Google Scholar
- (2004) Building car to customer order—What does it mean for inbound logistics operations? J. Bus. Logist. 25(2):171–198.Crossref, Google Scholar
- (2003) Replenishment strategies for distribution systems under advance demand information. Management Sci. 49(3):255–272.Link, Google Scholar
- (2004) Inventory control with limited capacity and advance demand information. Oper. Res. 52(6):1526–5463.Link, Google Scholar
- (1989) Optimal inventory policies for assembly systems under random demands. Oper. Res. 37(4):565–579.Link, Google Scholar
- (2002) Analysis of assembly systems for interdeparture time variability and throughput. IIE Trans. 34(1):23–40.Crossref, Google Scholar
- (1985) Optimal policy for a two-stage assembly system under random demand. Oper. Res. 33(5):1130–1145.Link, Google Scholar
- (1998) On the order fill rate in a multi-item, base-stock inventory system. Oper. Res. 46(6):831–845.Link, Google Scholar
- (2008) Inventory management with advance demand information and flexible delivery. Management Sci. 54(4):716–732.Link, Google Scholar
- (2006) The build-to-order challenge. Assembly Magazine (March 21).Google Scholar
- (2000) Foundations of inventory management. (McGraw-Hill, New York).Google Scholar

