Joint Order Fulfillment and Inventory Management in Assemble-to-Order Generalized W Systems

Published Online:https://doi.org/10.1287/opre.2021.0281

References

  • Agrawal N, Cohen M (2001) Optimal material control and performance evaluation in an assembly environment with component commonality. Naval Res. Logist. 48(5):409–429.CrossrefGoogle Scholar
  • Akçay Y, Xu SH (2004) Joint inventory replenishment and component allocation optimization in an assemble-to-order system. Management Sci. 50(1):99–116.LinkGoogle Scholar
  • Amsrud P (2022) Automotive semiconductor lead times are not yet improving. S&P Global (August 8), https://www.spglobal.com/mobility/en/research-analysis/automotive-semiconductor-lead-times-are-not-yet-improving.html.Google Scholar
  • Atan Z, Ahmadi T, Stegehuis C, de Kok T, Adan I (2017) Assemble-to-order systems: A review. Eur. J. Oper. Res. 261(3):866–879.CrossrefGoogle Scholar
  • Bedi R (2022) The impact of electronic component shortages on the global space industry. EDN (January 25), https://www.edn.com/the-impact-of-electronic-component-shortages-on-the-global-space-industry/.Google Scholar
  • Benjaafar S, ElHafsi M (2006) Production and inventory control of a single product assemble-to-order system with multiple customer classes. Management Sci. 52(12):1896–1912.LinkGoogle Scholar
  • Benjaafar S, ElHafsi M, Lee C, Zhou W (2011) Optimal control of an assembly system with multiple stages and multiple demand classes. Oper. Res. 59(2):522–529.LinkGoogle Scholar
  • Bernstein F, DeCroix GA, Wang Y (2011) The impact of demand aggregation through delayed component allocation in an assemble-to-order system. Management Sci. 57(6):1154–1171.LinkGoogle Scholar
  • Boyd E, Bilegan I (2003) Revenue management and e-commerce. Management Sci. 49(10):1363–1386.LinkGoogle Scholar
  • Burkacky O, Lingemann S, Pototzky K (2021) Coping with the auto-semiconductor shortage: Strategies for success. McKinsey & Company (May 27), www.mckinsey.com/industries/automotive-and-assembly/our-insights/coping-with-the-auto-semiconductor-shortage-strategies-for-success.Google Scholar
  • Bushey C, Pfeifer S (2022) “A ride on the struggle bus”: Engines shortage thwarts aviation’s recovery. Financial Times (November 2), https://www.ft.com/content/7deea32f-6f02-482f-8055-b04d94ed4a29.Google Scholar
  • Cooper W (2002) Asymptotic behavior of an allocation policy for revenue management. Oper. Res. 50(4):720–727.LinkGoogle Scholar
  • Doğru M, Reiman M, Wang Q (2010) A stochastic programming based inventory policy for assemble-to-order systems with application to the W model. Oper. Res. 58(4):849–864.LinkGoogle Scholar
  • Doğru M, Reiman M, Wang Q (2017) Assemble-to-order inventory management via stochastic programming: Chained BOMs and the M-system. Production Oper. Management 26(3):446–468.CrossrefGoogle Scholar
  • ElHafsi M, Fang J, Camus H (2018) Optimal control of a continuous-time W-configuration assemble-to-order system. Eur. J. Oper. Res. 267(3):917–932.CrossrefGoogle Scholar
  • Feng Y, Xiao B (2001) A dynamic airline seat inventory control model and its optimal policy. Oper. Res. 49(6):938–949.LinkGoogle Scholar
  • Gallego G, van Ryzin G (1997) A multiproduct dynamic pricing problem and its applications to network yield management. Oper. Res. 45(1):24–41.LinkGoogle Scholar
  • Haerian L, Homem-de-Mello T, Mount-Campbell C (2006) Modeling revenue yield of reservation systems that use nested capacity protection strategies. Internat. J. Production Econom. 104(2):340–353.CrossrefGoogle Scholar
  • Littlewood (1972) Forecasting and control of passenger bookings. Proc. Twelfth Annual AGIFORS Sympos. (Nathanya, Israel).Google Scholar
  • Lu Y, Song J (2005) Order-based cost optimization in assemble-to-order systems. Oper. Res. 53(1):151–169.LinkGoogle Scholar
  • Lu L, Song J, Zhang H (2016) Optimal and asymptotically optimal policies for assemble-to-order N- and W-systems. Naval Res. Logist. 62(3):617–645.Google Scholar
  • Lu Y, Song J, Zhao Y (2010) No-holdback allocation rules for continuous-time assemble-to-order systems. Oper. Res. 58(3):691–708.LinkGoogle Scholar
  • Nadar E, Akan M, Scheller-Wolf A (2014) Technical note—Optimal structural results for assemble-to-order generalized M-systems. Oper. Res. 62(3):571–579.LinkGoogle Scholar
  • Nadar E, Akcay A, Akan M, Scheller-Wolf A (2018) The benefits of state aggregation with extreme-point weighting for assemble-to-order systems. Oper. Res. 66(4):1040–1057.LinkGoogle Scholar
  • Reiman M, Wang Q (2012) Asymptotically optimal inventory control for assemble-to-order systems with identical lead times. Oper. Res. 63(3):716–732.LinkGoogle Scholar
  • Reiman M, Wan H, Wang Q (2016) On the use of independent base-stock policies in assemble-to-order inventory systems with nonidentical lead times. Oper. Res. Lett. 44(4):436–442.CrossrefGoogle Scholar
  • Rosling K (1989) Optimal inventory policies for assembly systems under random demands. Oper. Res. 37(4):565–579.LinkGoogle Scholar
  • Song J, Yao D (2002) Performance analysis and optimization of assemble-to-order systems with random lead times. Oper. Res. 50(5):889–903.LinkGoogle Scholar
  • Song J-S, Zhao Y (2009) The value of component commonality in a dynamic inventory system with lead times. Manufacturing Service Oper. Management 11(3):493–508.LinkGoogle Scholar
  • Song J-S, Zipkin P (2003) Supply chain operations: Assemble-to-order systems. de Kok AG, Graves SC, eds. Handbooks in Operations Research and Management Science, vol. 11 (Elsevier, Amsterdam), 561–596.CrossrefGoogle Scholar
  • Talluri K, van Ryzin G (2004) The Theory and Practice of Revenue Management (Kluwer Academic, Boston).CrossrefGoogle Scholar
  • Wan H, Wang Q (2015) Asymptotically-optimal component allocation for Assemble-to-Order production-inventory systems. Oper. Res. Lett. 43(3):304–310.CrossrefGoogle Scholar
  • Xu P, Allgor R, Graves SC (2009) Benefits of reevaluating real-time order fulfillment decisions. Manufacturing Service Oper. Management 11(2):340–355.LinkGoogle Scholar
  • Zhang A (1997) Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands. Production Oper. Management 6(3):309–323.CrossrefGoogle Scholar
  • Zhao Y, Simchi-Levi D (2006) Performance analysis and evaluation of assemble-to-order systems with stochastic sequential lead times. Oper. Res. 54(4):706–724.LinkGoogle Scholar
  • Zipkin P (2003) Some modularity properties of linear programs. Working paper, Duke University, Durham, NC.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.