Joint Inventory and Scheduling Control in a Repair Facility
References
- (2009) Reducing costs of spare parts supply systems via static priorities. Asia-Pacific J. Oper. Res. 26(4):559–585.Crossref, Google Scholar
- (1999) Modeling emergency supply flexibility in a two-echelon inventory system. Management Sci. 45(10):1416–1431.Link, Google Scholar
- (2016) Repairable stocking and expediting in a fluctuating demand environment: Optimal policy and heuristics. Oper. Res. 64(6):1285–1301.Link, Google Scholar
- (2022) An approximate analysis of dynamic pricing, outsourcing, and scheduling policies for a multiclass make-to-stock queue in the heavy traffic regime. Oper. Res. 71(1):341–357.Link, Google Scholar
- (2004) Scheduling a multi class queue with many exponential servers: Asymptotic optimality in heavy traffic. Ann. Appl. Probab. 14(3):1084–1134.Crossref, Google Scholar
- (1990) Modelling emergency lateral transshipments in inventory systems. Management Sci. 36(11):1329–1338.Link, Google Scholar
- (2014) System-oriented inventory models for spare parts. Surveys Oper. Res. Management Sci. 19(1):34–55.Crossref, Google Scholar
- (2019) Joint repair sourcing and stocking policies for repairables using Erlang-A and Erlang-B queueing models. IISE Trans. 51(10):1151–1166.Crossref, Google Scholar
- (2006) Integrated real-time capacity and inventory allocation for reparable service parts in a two-echelon supply system. Manufacturing Service Oper. Management 8(3):292–319.Link, Google Scholar
- (2008) Dimensioning large-scale membership services. Oper. Res. 56(1):173–187.Link, Google Scholar
- (2021) Expediting in two-echelon spare parts inventory systems. Manufacturing Service Oper. Management 23(6):1431–1448.Link, Google Scholar
- (2018) Integrated capacity planning and inventory control for repairable spare parts. PhD thesis, Technische Universiteit Eindhoven, Eindhoven, Netherlands. https://research.tue.nl/en/publications/integrated-capacity-planning-and-inventory-control-for-repairable.Google Scholar
- (2015) Maintenance spare parts planning and control: A framework for control and agenda for future research. Production Planning Control 26(5):407–426.Google Scholar
- (1981) Heavy-traffic limits for queues with many exponential servers. Oper. Res. 29(3):567–588.Link, Google Scholar
- (1988) Brownian models of queueing networks with heterogeneous customer populations. Fleming W, Lions PL, eds. Stochastic Differential Systems, Stochastic Control Theory and Their Applications, The IMA Volumes in Mathematics and Its Applications, vol. 10 (Springer, New York), 147–186.Crossref, Google Scholar
- (2013) Brownian Models of Performance and Control (Cambridge University Press, New York).Crossref, Google Scholar
- (1997) Dynamic control of Brownian networks: State space collapse and equivalent workload formulations. Ann. Appl. Probab. 7(3):747–771.Crossref, Google Scholar
- (1982) Priority scheduling rules for repairable inventory systems. Management Sci. 28(11):1215–1232.Link, Google Scholar
- (2015) Reliability or inventory? An analysis of performance-based contracts for product support services. Ha AY, Tang CS, eds. Handbook of Information Exchange in Supply Chain Management, Springer Series in Supply Chain Management, vol. 5 (Springer, Cham, Switzerland), 65–88.Google Scholar
- (2009) A new partial pooling structure for spare parts networks. Eur. J. Oper. Res. 199(3):908–921.Crossref, Google Scholar
- (2018) An analysis of a large-scale machine repair model. Stochastic Systems 8(2):91–125.Link, Google Scholar
- (1980) Are multi-echelon inventory methods worth implementing in systems with low-demand-rate items? Management Sci. 26(5):483–494.Link, Google Scholar
- (2007) Life cycle costs measurement of complex systems manufactured by an engineer-to-order company. Qui RG, Russell DW, Sullivan WG, Ahmad M, eds. Proc. 17th Internat. Conf. Flexible Automation Intelligent Manufacturing, 569–589.Google Scholar
- (2015) A new approximate evaluation method for two-echelon inventory systems with emergency shipments. Ann. Oper. Res. 224:147–169.Crossref, Google Scholar
- (2011) Inventory models with lateral transshipments: A review. Eur. J. Oper. Res. 210(2):125–136.Crossref, Google Scholar
- (1990) Priority repair and dispatch policies for reparable-item logistics systems. Naval Res. Logist. 37(1):1–30.Crossref, Google Scholar
- (2009) Dynamic control of a make-to-order, parallel-server system with cancellations. Oper. Res. 57(1):94–108.Link, Google Scholar
- (2002) Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems. Internat. J. Production Econom. 79(3):209–230.Crossref, Google Scholar
- (2005) Using repair priorities to reduce stock investment in spare part networks. Eur. J. Oper. Res. 163(3):733–750.Crossref, Google Scholar
- (2013) Reducing costs of repairable inventory supply systems via dynamic scheduling. Internat. J. Production Econom. 143(2):478–488.Crossref, Google Scholar
- (2013) Inventory reduction in spare part networks by selective throughput time reduction. Internat. J. Production Econom. 143(2):509–517.Crossref, Google Scholar
- (2015) Spare Parts Inventory Control Under System Availability Constraints (Springer, London).Crossref, Google Scholar
- (1998) A trade off between emergency repair and inventory investment. IIE Trans. 30:119–132.Crossref, Google Scholar
- (1992) Dynamic scheduling of a multiclass make-to-stock queue. Oper. Res. 40(4):724–735.Link, Google Scholar
- (2002) Stochastic-Process Limits: An Introduction to Stochastic-Process Limits and Their Application to Queues (Springer, New York).Crossref, Google Scholar
- (1990) A queueing model to analyze the value of centralized inventory information. Oper. Res. 38(2):296–307.Link, Google Scholar

